| 1 |
| Please confirm that PWS-07-001 Site Specific BTS section 5.2.2.1 and PWS 07-001 Site Specific MCTS section 5.2.2 is the only Contractor-Furnished Equipment (CFE)/Contractor Furnished Material (CFM). |
| The contractor is required to furnish all materials, parts, and incidentals necessary to perform the services listed in the solicitation and all attachments. |
| 2 |
| In regards to prevailing wages, while performing Inside Plant (ISP) work effort, will Davis-Bacon Act (DBA) wage rates apply? |
| In Accordance With (IAW) paragraph (c ) of Defense Federal Acquisition Regulation Supplement (DFARS) 222.402 |
DBA coverage under the contract. Contract construction, alteration, renovation, painting, and repair requirement (i.e. roof shingling, building structural repair, paving repairs, etc.) are subject to the DBA. Apply DBA clauses and minimum wage requirements to all contract service calls or orders for construction, alteration, renovation, painting, or repairs to building or other works. Paragraph (d) Repair versus maintenance. Some contract work may be characterized as either DBA painting/repairs or SCA maintenance. For example, replacing broken windows, spot painting, or minor patching of a wall could be covered by either the DBA or the SCA . . . In those instances where a contract service call or order requires construction trade skills, but it is unclear whether the work required is SCA maintenance or DBA painting/repairs, apply the following rules—
(1) Individual service calls or orders which will require a total of 32 or more work-hours to perform shall be considered to be repair work subject to the DBA.
(2) Individual service calls or orders which will require less than 32 work-hours to perform shall be considered to be maintenance subject to the SCA.
(3) Painting of 200 square feet or more to be performed under an individual service call or order shall be considered to be subject to the DBA regardless of the total work hours required.
| 3 |
| Will a Pre-Award Survey (PAS) be conducted on every offeror? |
| No, only those offerors within the competitive range comprised of the most highly rated proposals. |
| 4 |
| Will a Certificate of Competency be requested for each offeror? |
| No, only if a small business offeror is found non-responsible and only after a PAS has been obtained. |
| 5 |
| Is Certified Cost & Pricing Data required? |
| No, the Government does however reserve the right to enforce para (b) of FAR Clause 52.215-21. |
| 6 |
| Will the Government provide training on the Cyberspace Infrastructure Planning Systems (CIPS) Visualization Component (CVC)? |
| Yes, reference paragraph 3.1 of Attachment 2 - Performance Work Statement (PWS). The Government will provide two days of training for two Contractor personnel at Tinker AFB in Oklahoma. The Government will provide the facilities, instructors, schedule of training dates, and all training materials and equipment. The Contractor is responsible for travel, lodging, and meals for Contractor personnel receiving training. |
| 7 |
| Why doesn’t the Government allow a wage adjustment for Davis Bacon? |
The principal purpose of the acquisition is for Operations and Maintenance Services, not Construction Services, the magnitude of construction is incidental/minor to the overall Scope of the contract. Reference paragraph (b) (iii) of FAR provision 52.212-1 of the solicitation. Offerors have the option of proposing an escalation rate at Worksheet 4 of Attachment 1 – Pricing Table, for the Indefinite Delivery/Indefinite Quantity (ID/IQ) CLIN/SLIN/PID items at X004-X008. Also, the Unit Price for the CLIN/SLIN/PID items for X009 at Worksheet 3 is a loaded rate. The Offeror does have the latitude to establish optional estimating assumptions.
| 8 |
| Will you allow for a Phase-in/Orientation Period? |
| If award is made as scheduled, there will be at least a two-week period between the award announcement and the performance date. However, there’s no formal orientation period. |
| 9 |
| What is the commercial software used to update the Work Center Records? |
| Medical Center (Optivity - OTM & @com); Communications Squadron (TMS & T-Metrics) |
| 10 |
| How many Full Time Employees (FTE’s) are on site working at the Communications Squadron under the present Base Telecommunications System (BTS)? |
| Nine (9) FTE’s as follows: |
(1) Base Telecommunications System Manager (BTS)
(1) Switching System Technician
(3) Premise Equipment Technician
(2) Outside Plant (OSP)Cable Technician
(1) Computer Operator
(1) General Clerk
| 11 |
| How many FTE’s are presently on site working under the current Medical Center Telecommunications System (MCTS)? |
| Four (4) FTE’s as follows: |
(1) Base Telecommunications System Manager (BTS)
(1) Switching System Technician
(1) Premise Equipment Technician
(1) Outside Plant (OSP)Cable Technician
| 12 |
| This is a Performance Based acquisition, why specify a minimum number of key personnel? |
| With respect to personnel requirements, referenced at paragraph 1.2.5 of the PWS. The Contractor is solely responsible for ensuring that sufficient personnel are assigned to this contract and all personnel are experienced and qualified to perform the services listed in the PWS. The Contractor is required to make their own determination as to what combination of employee classifications could best perform the required contract services. The classifications identified in the Site Specific PWS for the Base Telecommunications System (BTS) and the Medical Center Telecommunications System (MCTS) are provided for informational purposes only. The Contractor is however, required to propose no less than the minimum number of employees stated in the Site Specific PWS for BTS and the MCTS. The minimum personnel standard, accurately reflects the Governments minimum requirement. Again, the Contractor is responsible for reviewing the solicitation and attachments for the instant acquisition and all technical documentation and establish a sound pricing position that will be found Realistic, Reasonable, Complete and Balanced. |
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .