BLU‐137/B Penetrator Warhead RFP Questions and Answers Part 3
Question Response Page Section/Paragraph Title
4.2.2 XSP20168702, XPS20168703, etc
The documents state that both Major and Minor characteristics are verified using the VL‐1V per Table II. All other contracts we perform to require a VL‐1V for Major Characteristics and VL‐II for Minor Classified features. Is this a typo or oversight or is this the customer’s intent to inspect both classifications at the higher Verification Level?
Minor characteristics in both documents are now changed to a VL‐II per MIL‐STD‐1916. A new TDP will be provided to those that requested the TDP.
3.2.1.3 3.2.1.4
XSP20168702
X2015A2K04100, Note 12
Request confirmation of MPI timing in the production process. Our interpretation is that magnetic particle and ultrasonic is to be performed on the forge casing after heat treatment, prior to machining.
The intent of the note and paragraph in the respective drawing and specification as stated is to perform the MPI and Ultrasonic inspections after the heat treatment and prior to the machining. MPI and Ultrasonic inspection as stated in paragraphs 4.3.2 and 4.3.3 are for the finished case after machining.