FA8650-24-PIA-0001 (Amendment 003).pdf

PDF 176 KB Posted

Attached to
Wright Site Technology Transfer and Transition (WST3) Partnership Intermediary Agreement Federal contract opportunity
Solicitation number
FA8650-24-PIA-0001
Issued by
Department of the Air Force Materiel Command Research Laboratory

About this file

This document provides clarification amendments to solicitation number FA8650-24-PIA-0001 from the Department of Defense Air Force Research Laboratory at Wright Patterson AFB, Ohio for a Partnership Intermediary Agreement to focus activities in technology transfer and transition, small business, SBIR/STTR programs, and STEM engagement. The solicitation seeks a statement of work not exceeding 10 pages single spaced from applicants to address assistance with developing collaborative partnerships between the laboratory and industry or academia to transfer technology, identify small business opportunities, increase SBIR/STTR phase III transitions, and enhance regional STEM programs leveraging education institutions as outlined in the statement of objectives. Resumes are also required for all personnel in major roles not to exceed 2 pages single spaced per resume.

View the file

Other files for this federal contract opportunity

Other files attached to Wright Site Technology Transfer and Transition (WST3) Partnership Intermediary Agreement, newest first.
File Type Posted
FA8650-24-PIA-0001 (Amendment 007).pdf PDF
FA8650-24-PIA-0001 (Amendment 006) Cancellation FINAL.pdf PDF
FA8650-24-PIA-0001 (Amendment 005).pdf PDF
FA8650-24-PIA-0001 (Amendment 004).pdf PDF
FA8650-24-PIA-0001 (Amendment 002).pdf PDF
FA8650-24-PIA-0001 (Amendment 001).pdf PDF
Atch 3 Model Agreement.pdf PDF
WST3 PIA Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Partnership Intermediary Agreement

Wright Site Technology Transfer and Transition (WST3)

FA8650-24-PIA-0001

Amendment 003

23 January 2024

The following clarification is made to the above solicitation:

1. Section IV, Paragraph 2, Table:

FROM:

Basic Agreement Statement of Work (Not part of the 30-page limit, but not to exceed 10 pages)

CPO 1 Statement of Work (Not part of the 15-page limit, but not to exceed 10 pages)

A Statement of Work is required to be included with the submitted proposal and shall address each aspect of the SOO. The SOW is an outline of specific aims of the proposed effort that establishes milestones during the performance period. The SOW should contain sufficient detail to be informative as a standalone document. The SOW shall not simply reiterate the Statement of Objectives. The SOW must not include proprietary information. The SOW should fully describe the work to be accomplished and how the Applicant will achieve the milestones, will accomplish final project goal(s), and will produce all deliverables. It is the Applicant’s responsibility to prepare an adequately detailed task plan to describe the proposed effort and the plan for addressing the objectives.

TO:

Basic Agreement Statement of Work (Not part of the 30-page limit, but not to exceed 10 pages, single spaced)

CPO 1 Statement of Work (Not part of the 15-page limit, but not to exceed 10 pages, single spaced)

A Statement of Work is required to be included with the submitted proposal and shall address each aspect of the SOO. The SOW is an outline of specific aims of the proposed effort that establishes milestones during the performance period. The SOW should contain sufficient detail to be informative as a standalone document. The SOW shall not simply reiterate the Statement of Objectives. The SOW must not include proprietary information. The SOW should fully describe the work to be accomplished and how the Applicant will achieve the milestones, will accomplish final project goal(s), and will produce all deliverables. It is the Applicant’s responsibility to prepare an adequately detailed task plan to describe the proposed effort and the plan for addressing the objectives.

2. Section IV, Paragraph, Table:

FROM:

Appendix 1 – Resume File (Not part of the 30-page limit)

CPO 1

Appendix 1—Resume File (Not part of the 15- page limit)

Provide a resume for all personnel having a major role, to include sub-awardees and/or consultants if they meet the definition of a major role. A major role is defined as any individual who contributes in a substantive, measurable way to the execution of the proposed effort. The biographical information for each resume must not exceed 2 pages when printed on 8.5” by 11” paper with 1-inch margins (top, bottom, left and right) double spaced with font no smaller than 11 point and should include the following information, if applicable:

• Education and Training. Undergraduate, graduate, and postdoctoral training; provide institution, major/area, degree, and year.

• Professional Experience. Beginning with current position, list in chronological order, professional/academic positions with a brief description.

• Provide the Resume File as an appendix to the Technical Volume. Do not attach as a separate file.

TO:

Appendix 1 – Resume File (Not part of the 30-page limit)

CPO 1

Appendix 1—Resume File (Not part of the 15- page limit)

Provide a resume for all personnel having a major role, to include sub-awardees and/or consultants if they meet the definition of a major role. A major role is defined as any individual who contributes in a substantive, measurable way to the execution of the proposed effort. The biographical information for each resume must not exceed 2 pages when printed on 8.5” by 11” paper with 1-inch margins (top, bottom, left and right) single spaced with font no smaller than 11 point and should include the following information, if applicable:

• Education and Training. Undergraduate, graduate, and postdoctoral training; provide institution, major/area, degree, and year.

• Professional Experience. Beginning with current position, list in chronological order, professional/academic positions with a brief description.

• Provide the Resume File as an appendix to the Technical Volume. Do not attach as a separate file.

File details come from the government source that posted it. Updated .