FA8650-24-PIA-0001 (Amendment 002).pdf

PDF 108 KB Posted

Attached to
Wright Site Technology Transfer and Transition (WST3) Partnership Intermediary Agreement Federal contract opportunity
Solicitation number
FA8650-24-PIA-0001
Issued by
Department of the Air Force Materiel Command Research Laboratory

About this file

This solicitation seeks proposals for a Partnership Intermediary Agreement to support technology transfer and transition activities at Wright-Patterson Air Force Base in Ohio. The selected partner will focus on four key areas: assisting with technology transfer between the Air Force Research Laboratory and industry/academia; developing partnerships between the Laboratory and small businesses; increasing transition of Small Business Innovation Research/Small Business Technology Transfer technologies to industry and Air Force customers; and facilitating relationships with educational institutions to expose students to STEM opportunities. Proposers should describe their proposed strategies, technical approaches, and justifications without exceeding page limits in the technical volume.

View the file

Other files for this federal contract opportunity

Other files attached to Wright Site Technology Transfer and Transition (WST3) Partnership Intermediary Agreement, newest first.
File Type Posted
FA8650-24-PIA-0001 (Amendment 007).pdf PDF
FA8650-24-PIA-0001 (Amendment 006) Cancellation FINAL.pdf PDF
FA8650-24-PIA-0001 (Amendment 005).pdf PDF
FA8650-24-PIA-0001 (Amendment 004).pdf PDF
FA8650-24-PIA-0001 (Amendment 003).pdf PDF
FA8650-24-PIA-0001 (Amendment 001).pdf PDF
Atch 3 Model Agreement.pdf PDF
WST3 PIA Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Partnership Intermediary Agreement

Wright Site Technology Transfer and Transition (WST3)

FA8650-24-PIA-0001

Amendment 002

19 January 2024

The following changes are made to the above solicitation:

1. Section IV, Paragraph 2

FROM: Technical Volume: The technical volume for the Basic Agreement must not exceed 30 pages, including cover page, table of contents, charts, graphs, maps, photographs, and other pictorial presentations, when printed using standard 8.5” by 11” paper with 1-inch margins (top, bottom, left, and right) double spaced. The technical volume for CPO 1 must not exceed 15 pages. EVALUATORS

WILL REVIEW ONLY THE NUMBER OF PAGES SPECIFICED IN THE PRECEDING

SENTENCE. The font must not be smaller than 11 point. Do not include Internet addresses (URLs) that provide information necessary to review the proposal. The information contained in referenced Internet addresses will not be reviewed. The applicant’s proposal must clearly describe strategy, technical approach and justification proposed. Do not include proprietary or confidential information.

The technical volume should describe the relevance of the proposed effort to the SOO. Excluded from the Basic Agreement Technical Volume 30-page limit and the CPO 1 Technical Volume 15-page limit are: Statement of Work (SOW), resumes and cost volume.

TO: Technical Volume: The technical volume for the Basic Agreement must not exceed 30 pages, including cover page, table of contents, charts, graphs, maps, photographs, and other pictorial presentations, when printed using standard 8.5” by 11” paper with 1-inch margins (top, bottom, left, and right) single spaced. The technical volume for CPO 1 must not exceed 15 pages. EVALUATORS WILL REVIEW ONLY THE NUMBER OF PAGES SPECIFICED IN THE PRECEDING SENTENCE. The font must not be smaller than 11 point. Do not include Internet addresses (URLs) that provide information necessary to review the proposal. The information contained in referenced Internet addresses will not be reviewed. The applicant’s proposal must clearly describe strategy, technical approach and justification proposed. Do not include proprietary or confidential information. The technical volume should describe the relevance of the proposed effort to the SOO. Excluded from the Basic Agreement Technical Volume 30-page limit and the CPO 1 Technical Volume 15-page limit are: Statement of Work (SOW), resumes and cost volume.

File details come from the government source that posted it. Updated .