Attachment 6 to Section L

FA8629-12-R-2421

Line of Sight-Short (LOS-S)

STATEMENT OF OBJECTIVES (SOO)

01 February 2012

1. PROGRAM GOAL:

The goal of this program is to develop and field a lightweight integrated three-in-one range finer/designator/sensor to enhance targeting effectiveness at ranges less than or equal to three kilometers. The Line of Sight-Short (LOS-S) will provide the operator with increased situational awareness/understanding and an enhanced ability to shoot, move and communicate on the battlefield.

2. PROGRAM SCOPE:

The scope of this effort required for the LOS-S is defined herein and the objectives are stated below. The contract will consist of Cost-Plus Incentive Fee and Fixed Price

Contract Line Item Number (CLINs) as defined by the contracting officer.

3. PROGRAM OBJECTIVE:

The overall program objective is to provide a lightweight integrated device that will provide the capability to acquire a target, determine a target location with greater accuracy, and designate a target with greater precision.

4. PROGRAM MANAGEMENT:

a. Provide a monthly Integrated Master Schedule (IMS) and Monthly Status Reports to support the Program. Review and manage the project to ensure that technical, cost and schedule objectives are met. (DI-MGMT-81650/T) (DI-MGMT-80368A)

b. Provide and maintain clear Government communication/visibility into program schedule, technical performance, and cost risks through Contract Data Requirements

Lists (CDRLs) and Program Management Reviews (PMRs) at a minimum.

5. SYSTEMS ENGINEERING:

a. Provide a LOS-S system which includes the following major components: Line of

Sight hardware and software along with other support parts satisfying or exceeding all the threshold requirements of the Systems Requirements Document (SRD).

b. Develop a final system specification acceptable to the Government from the SRD supplied as part of the Request for Proposal (RFP) (DI-IPSC-81431A)

c. Provide an Interface Control Document (ICD) that documents the hardware, software and human interfaces of the LOS-S to the Battlefield Air Operations Kit (BAO Kit).

(DI-IPSC-81434A)

d. A System Requirements Review (SRR) shall be conducted to ensure the System

Subsytem Specification (SSS) (DI- DI-IPSC-81431A)captures the capability needs as documented in the SRD. The SRR confirms consistency between the system requirements (as documented in the SSS) and the preferred system solution and available technologies.

e. Conduct a Preliminary Design Review (PDR) as described in the IMP to include but not limited to the following topics:

i. Preliminary ICD

ii. Preliminary design of the LOS-S for Government review

iii. Address Human System Integration

iv. Update cost/price

v. Update schedule

f. Conduct a Critical Design Review (CDR) as described by the IMP to include but not limited to the following topics:

i. Final ICD

ii. Final design of the LOS-S for Government review

iii. Final Human System Integration Review

iv. Prototype of the LOS-S components for Government review

v. Updated cost, to include production costs

vi. Updated schedule

g. Provide a Systems Engineering Management Plan (SEMP) for the LOS-S program.

(DI-SESS-81785)

h. Provide a Software Version Description (SVD) to identify the software being used in the LOS-S device. (DI-IPSC-81442A)

6. TEST:

a. Provide a Contractor Test Plan (CTP) to verify the SSS) requirements for approval

(DI-NDTI-80566A).

b. Conduct a Contractor Test & Evaluation (CT&E) program allowing Government oversight.

c. Provide test report at completion of CT&E. (DI-NDTI-80809B)

d. Provide three (3) personnel for engineering support for six (6) weeks of

Governmental Developmental Test & Evaluation (DT&E) to include round-trips to three (3) test locations. Support the government development Test Readiness Review

(TRR).

e. Provide one (1) person for two (2) weeks to provide maintenance support for

Governmental Operational Test and Evaluation (OT&E), to include one (1) round-trip to the test location.

7. LOGISTICS:

a. The contractor shall plan, develop, deliver, and implement a sustainment infrastructure optimized to support the LOS-S total life cycle. Provide a warranty for no less than three (3) years.

b. The contractor shall deliver, as required, provisioning data in accordance with (IAW)

(DI-ALSS-81557)

c. Apply Item Unique Identification (IUID) markings permanently in accordance with

MIL-STD-130, Department of Defense and Defense Standard Practice Identification

Marking of U.S. Military Property. The Contractor shall record IUID marked items in the Department of Defense IUID Registry. (DI-MGMT-81804)

d. Provide commercial operator and maintenance manuals.(DI-TMSS-80527C)

e. Provide computer based training (CBT) module that covers operations and basic/field maintenance and certification of the LOS-S.

f. Provide operator and maintenance training for the LOS-S to Government test personnel and initial cadre. (DI-SESS-81637)

g. Provide Interim Contractor Support (ICS) for the LOS-S system until organic organizational and depot level maintenance is established.

h. Provide initial Logistics Spares Package for all bases and the LOS-S devices. This shall include an initial readiness spares package.

i. The contractor shall provide an efficient method for ordering replacement parts so as not to impact the mission.

j. The contractor shall make use of existing support equipment/automatic test systems

(SE/ATS) to the maximum extent possible. Contractor shall perform an analysis sufficient to determine both new and modified SE requirements and formulate

Support Equipment Recommendation Data for specific items of peculiar SE, including modified hand tools.

8. CONFIGURATION MANAGEMENT:

a. The Contractor shall implement a Configuration Management (CM) program

b. The Contractor’s CM Plan (CMP) plan shall identify and document the functional and physical characteristics of the project and a method to control changes, evaluate/identify CM items, maintain status accounting records and reports and participate in system configuration development and maintenance review.

c. The CMP shall be written specific to this effort and submitted to the Government for approval. Contractor shall provide and document configuration control of the

Functional, Allocated, Product, and Operational Safety, Suitability, and Effectiveness

(OSS&E) baseline, IAW Contractor CMP. (DI-CMAN-80858B)

8.1 Engineering Change Proposals

a. Class I and II Engineering Change Proposals (ECPs) shall be submitted to the

Government for their review and approval, as required.

b. Class I and Class II changes shall be defined per the Government standard as specified in the contract.

c. All Class II changes shall be incorporated into the production baseline. (DI-

ADMN-81401B; DI-CMAN-80639C/T; DI-CMAN-80640C/T; DI-CMAN-

80643C, DI-CMAN-80642C, DI-CMAN-81254A, DI-IPSC-81442A, DI-MISC-

81454B.

8.2 Configuration Audits

a. A Functional Configuration Audit (FCA) and Physical Configuration Audit

(PCA) shall be conducted between the contractor/suppliers and the Government.

b. The contractor shall develop a Configuration Audit Plan and submit to the

Government for approval. (DI-SESS-81646)

9. FINANCE

The contractor shall submit financial information on a monthly basis in accordance with instructions stated in Block 16 of the CDRL. (DI-MGMT-81468)

10. DATA MANAGEMENT:

Contractor shall ensure the documentation necessary for execution of the program is available in accordance with this SOO and the CDRL.

10.1 Data Accession List (DAL)

a. Contractor shall maintain and update a DAL. All documentation and data generated under this program, other than data identified as a CDRL deliverable, shall be placed on a contractor generated/maintained electronic information system (accessible by the Government) to support the data identified by the

IMP/IMS or elsewhere in this contract.

b. All documentation that has Contractor or subcontractor document numbers shall be incorporated into the DAL no later than five (5) days after document release.

(DI-MGMT-81453A)

10.2 Engineering Data:

a. The Contractor shall develop, produce, maintain and deliver a production level

Technical Data Package (TDP) that accurately depicts the final product.

b. The Contractor shall develop technical engineering data, including processes specified on drawings, to meet Operations, Maintenance, Installation, and

Training (OMIT) requirements to support organizational and depot maintenance.

c. The TDP shall represent the approved, tested, and accepted configuration of the defined delivered item(s).

d. All engineering product definition data created as a result of this contract shall be considered a part of the TDP. The TDP shall include unlimited data rights.

e. The TDP shall be delivered in accordance with Air Force Product Data

Specification drawing 9579776 (CAGE 98752), reference DD Form 1423 Block

16, to be input to the official Joint Engineering Data Management Information and Control System (JEDMICS) data repository. (DI-SESS-81000D/T)

11. SAFETY:

The contractor shall document a Safety Assessment Report (SAR) to identify all safety features of the hardware, software and system design; and identify procedural, hardware and software hazards that may be present in the system. The SAR shall include the procedural controls and precautions that should be followed. (DI-SAFT-

80102 B/T)