Q and A_09 Jun 2020.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
Joint Terminal Control Training and Rehearsal System (JTC TRS) Program
Solicitation number
FA8621-20-R-0003
Issued by

About this file

This document contains a question and answer file related to a solicitation for the Joint Terminal Control Training and Rehearsal System Program. The solicitation seeks proposals to continue acquiring and sustaining high fidelity training systems designed to provide realistic training for Terminal Attack Control, Close Air Support, Call for Fire and Air to Ground Command and Control. The training systems include fixed dome, desktop and portable Joint Terminal Attack Controller simulators as well as an Air Support Operations Center simulator. Offerors must provide robust, interactive multimedia systems that support actual equipment used in combat operations. The systems must be upgradeable, interoperable, and capable of participating in distributed operations over networks. The Air Force Materiel Command Lifecycle Management Center at Wright Patterson Air Force Base is the contracting agency. Incumbent contractors currently operate and maintain systems under the program.

View the file

Other files

File Type Posted
JTC_TRS Questions for 25 June2020.pdf PDF
Attachment 7_Asset List_Revised_18 Jun 20.pdf PDF
Attachment 11_Section L_15 June 20.pdf PDF
Q and A_05 Jun 2020.xlsx XLSX spreadsheet
Attachment 12_SECTION _M_15 Jun 20 update.pdf PDF
Attachment 3_Price Matrix_Revised_15 Jun 20.xlsx XLSX spreadsheet
Attachment 1_PWS_Revised 15 Jun 20.pdf PDF
Q and A_08 Jun 2020.xlsx XLSX spreadsheet
Attachment 12_SECTION _M_10 Jun 20 update.pdf PDF
Attachment 1_PWS_Revised 10 Jun 20.pdf PDF
Attachment 3_Price Matrix_Revised_10 Jun 20.xlsx XLSX spreadsheet
Attachment 7_Asset List_Revised_10 Jun 20.pdf PDF
Attachment 11_Section L.pdf PDF
15-4485_Ft. Stewart GA.txt TXT text file
15-5197_Ft. Polk LA.txt TXT text file
15-4527_Ft Benning GA.txt TXT text file
15-4701_Ft. Campbell KY.txt TXT text file
15-5027_Peoria IL.txt TXT text file
15-5253_JBSA TX.txt TXT text file
15-5229_Ft. Bliss TX.txt TXT text file
15-5593_Nellis AFB NV.txt TXT text file
15-5343_Ft. Riley KS.txt TXT text file
15-5443_Kirtland AFB NM.txt TXT text file
15-5457_Cannon AFB NM.txt TXT text file
15-5683_Ft. Wainwright AK.txt TXT text file
15-4731_Wright Patt AFB OH.txt TXT text file
15-5689_Wheeler HI.txt TXT text file
15-5629_Ft. Irwin CA.txt TXT text file
15-5237_Ft. Hood TX.txt TXT text file
15-4531_Hurlburt FL.txt TXT text file
15-5417_Ft. Carson CO.txt TXT text file
15-4377_Pope_Ft. Bragg NC.txt TXT text file
15-5539_JBLM_Camp Murray WA.txt TXT text file
15-5775_Ft. Drum NY.txt TXT text file
15-5315_Will Rogers ANG OK.txt TXT text file
Draft Model Contract_Rev 1.pdf PDF
Attachment 3_Price Matrix_Revised_01 Jun 20.xlsx XLSX spreadsheet
Attachment 1_PWS_Revised_01 Jun 20.pdf PDF
Complete Q and A_01 Jun 2020.xlsx XLSX spreadsheet
JTC_TRS General Instructions 20200515_Update.pdf PDF
Draft Model Contract.pdf PDF
Exhibit A_JTC TRS CDRL_5-15-20.pdf PDF
Attachment 11_Section L_Final.pdf PDF
PPI_Letter_12 May.pdf PDF
L-3-Client Authorization Letter.pdf PDF
L-2-Consent Letter.pdf PDF
M1 TEST PLAN AND TEST POINTS.pdf PDF
Attachment 12_SECTION _M_RFP_FINAL.pdf PDF
L-1_Past Performance Questionnaire.pdf PDF
Attachment 11_Section L_Final.pdf PDF
Show 40 more

Latest 50 of 71 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Question NumberReference
(CLIN, SOW, P-Spec, etc.)Question / CommentAnswer
1Attachment 2; 3.5.4.3.1 Visualization of selectable resources (as listed in Appendix C1 & C2) shall be displayable on the lower portion of the dome, outside of the trainee’s main field of view.Is “the lower portion of the dome” still part of the curved dome surface? If so, can “main field of view” be defined?Yes. The main field of view is the portion of the curved screen from kneeling height to standing height where the trainee will be looking most of the time. Not sure how techincal of an answer they want.
2Attachment 2; 3.5.4.4.1 JTC TRS cabling between the system and trainee(s) equipment shall not:

a. interfere with operation of equipment

b. distract the trainee(s)

c. hinder trainee(s) mobility or ability to perform the missionWould it be considered to be an interference, distraction, or hindrance if trainee equipment has cabling that runs along the floor of the system, provided that the cable is not too long to be excessive or too short to allow for the trainee to move as his tasks require?No, small cables of the right size and length may be run along the floor as long as they lay flat and do not interfere with the trainee movement.
3Attachment 2; 3.10.1.2.1 JTC TRS shall operate on commercial power 100 -240 Volts Alternating Current (VAC) ± 10%, single, dual or three phase at 50/60 Hz.Is it intended for the system to be able to accommodate multiple power standards (i.e. US 120V 60 Hz and European 220V 50Hz), or just that the system should work with a single set of power specifications that are decided by the offeror provided the power specified for all units is within the range specified.The current system has 2 different baselines for power, one for CONUS and one for OCONUS. We do not require that you have one power baseline that will work for both standards. It will be determined at the time of device purchase where the intended install location will be and therefore what power standard will be required.
4Attachment 2; 3.13.4.1.2 Equipment shall be listed or certified by a Nationally Recognized Test Laboratory (NRTL) (e.g. Underwriters Laboratories).Does this apply to all equipment, or only power delivery systems (i.e. power conditioners, uninterruptable power supplies, power distribution systems, etc.)This applies to all electrical equipment.
5Attachment 2; G.1.27.1 The visual system shall support night vision goggle (NVG) scenes.
Attachment 2; G.1.27.2 The NVG capability shall include night vision device halo effects, slew-able field- of-view, scintillation, Automatic Gain Control (AGC), blooming, speckling, noise and infrared pointers and spotlight effects.Does this mean that the image generated on the screen shall be able to mimic an NVG scene without the use of the trainee-supplied NVGs?The dome requires use of real NVG equipment. The DT and Portable will not use NVG equipment and will require a NVG filter.
6Attachment 11_Section L.pdf, Section 2.6.6.10 Section J List of Attachments.Will the Government be releasing a JTAGSS Performance Specification during the solicitation period, as mentioned in the following Section L, 2.6.6.10 extract?JTAGSS provided us an updated P-Spec last winter, shouldn't be a problem adding it to the bidders library.

File details come from the government source that posted it. Updated .