About this file

This document contains a question and answer file related to a solicitation for the Joint Terminal Control Training and Rehearsal System Program. The solicitation seeks proposals to continue acquiring and sustaining high fidelity training systems designed to provide realistic training for Terminal Attack Control, Close Air Support, Call for Fire and Air to Ground Command and Control. The training systems include fixed dome, desktop and portable Joint Terminal Attack Controller simulators as well as an Air Support Operations Center simulator. Offerors must provide robust, interactive multimedia systems that support actual equipment used in combat operations. The systems must be upgradeable, interoperable, and capable of participating in distributed operations over networks. The Air Force Materiel Command Lifecycle Management Center at Wright Patterson Air Force Base is the contracting agency. Incumbent contractors currently operate and maintain systems under the program.

View the file

Other files for this federal contract opportunity

Other files attached to Joint Terminal Control Training and Rehearsal System (JTC TRS) Program, newest first.
File Type Posted
Attachment 7_Asset List_Revised_18 Jun 20.pdf PDF
Attachment 1_PWS_Revised 15 Jun 20.pdf PDF
Attachment 11_Section L_15 June 20.pdf PDF
Attachment 12_SECTION _M_15 Jun 20 update.pdf PDF
Attachment 3_Price Matrix_Revised_15 Jun 20.xlsx XLSX spreadsheet
Q and A_08 Jun 2020.xlsx XLSX spreadsheet
Attachment 12_SECTION _M_10 Jun 20 update.pdf PDF
Attachment 7_Asset List_Revised_10 Jun 20.pdf PDF
15-4731_Wright Patt AFB OH.txt TXT text file
15-5629_Ft. Irwin CA.txt TXT text file
15-4701_Ft. Campbell KY.txt TXT text file
15-5229_Ft. Bliss TX.txt TXT text file
Attachment 11_Section L.pdf PDF
15-5683_Ft. Wainwright AK.txt TXT text file
15-4527_Ft Benning GA.txt TXT text file
15-5689_Wheeler HI.txt TXT text file
15-5253_JBSA TX.txt TXT text file
15-5197_Ft. Polk LA.txt TXT text file
15-4377_Pope_Ft. Bragg NC.txt TXT text file
15-5775_Ft. Drum NY.txt TXT text file
15-5539_JBLM_Camp Murray WA.txt TXT text file
15-5315_Will Rogers ANG OK.txt TXT text file
Draft Model Contract_Rev 1.pdf PDF
Complete Q and A_01 Jun 2020.xlsx XLSX spreadsheet
JTC_TRS General Instructions 20200515_Update.pdf PDF
Draft Model Contract.pdf PDF
Exhibit A_JTC TRS CDRL_5-15-20.pdf PDF
Attachment 11_Section L_Final.pdf PDF
PPI_Letter_12 May.pdf PDF
Attachment 8_GFP List.pdf PDF
Attachment 2_FoS_PSpec.pdf PDF
Attachment 9_AFMCForm158 JTC TRS.pdf PDF
L-4_PPI Tool.pdf PDF
L-3-Client Authorization Letter.pdf PDF
M1 TEST PLAN AND TEST POINTS.pdf PDF
M6 SUPPLEMENTAL AND EME TEST POINTS.pdf PDF
L-2-Consent Letter.pdf PDF
Attachment 1_PWS_11 May 20.pdf PDF
M4 SCENARIO 3 DESCRIPTION AND TEST POINTS.pdf PDF
M3 SCENARIO 2 DESCRIPTION AND TEST POINTS.pdf PDF
Attachment 12_SECTION _M_RFP_FINAL.pdf PDF
Attachment 13-Cross Reference Matrix.docx DOCX document
Attachment 5_DD254.pdf PDF
M5 SCENARIO 4 DESCRIPTION AND TEST POINTS.pdf PDF
RFP_Cover_Letter_11 May.pdf PDF
JTC_TRS General Instructions 20200430_DRAFT.pdf PDF
Attachment 6_IUID JTC TRS.pdf PDF
Attachment 7_Asset List.pdf PDF
Exhibit A_JTC TRS CDRL_4_21_20.pdf PDF
M2 SCENARIO 1 DESCRIPTION AND TEST POINTS.pdf PDF
Show all 50

Joint Terminal Control Training and Rehearsal System (JTC TRS) Program has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Question NumberReference
(CLIN, SOW, P-Spec, etc.)Question / CommentAnswer
1Attachment 2; 3.5.4.3.1 Visualization of selectable resources (as listed in Appendix C1 & C2) shall be displayable on the lower portion of the dome, outside of the trainee’s main field of view.Is “the lower portion of the dome” still part of the curved dome surface? If so, can “main field of view” be defined?Yes. The main field of view is the portion of the curved screen from kneeling height to standing height where the trainee will be looking most of the time. Not sure how techincal of an answer they want.
2Attachment 2; 3.5.4.4.1 JTC TRS cabling between the system and trainee(s) equipment shall not:

a. interfere with operation of equipment

b. distract the trainee(s)

c. hinder trainee(s) mobility or ability to perform the missionWould it be considered to be an interference, distraction, or hindrance if trainee equipment has cabling that runs along the floor of the system, provided that the cable is not too long to be excessive or too short to allow for the trainee to move as his tasks require?No, small cables of the right size and length may be run along the floor as long as they lay flat and do not interfere with the trainee movement.
3Attachment 2; 3.10.1.2.1 JTC TRS shall operate on commercial power 100 -240 Volts Alternating Current (VAC) ± 10%, single, dual or three phase at 50/60 Hz.Is it intended for the system to be able to accommodate multiple power standards (i.e. US 120V 60 Hz and European 220V 50Hz), or just that the system should work with a single set of power specifications that are decided by the offeror provided the power specified for all units is within the range specified.The current system has 2 different baselines for power, one for CONUS and one for OCONUS. We do not require that you have one power baseline that will work for both standards. It will be determined at the time of device purchase where the intended install location will be and therefore what power standard will be required.
4Attachment 2; 3.13.4.1.2 Equipment shall be listed or certified by a Nationally Recognized Test Laboratory (NRTL) (e.g. Underwriters Laboratories).Does this apply to all equipment, or only power delivery systems (i.e. power conditioners, uninterruptable power supplies, power distribution systems, etc.)This applies to all electrical equipment.
5Attachment 2; G.1.27.1 The visual system shall support night vision goggle (NVG) scenes.
Attachment 2; G.1.27.2 The NVG capability shall include night vision device halo effects, slew-able field- of-view, scintillation, Automatic Gain Control (AGC), blooming, speckling, noise and infrared pointers and spotlight effects.Does this mean that the image generated on the screen shall be able to mimic an NVG scene without the use of the trainee-supplied NVGs?The dome requires use of real NVG equipment. The DT and Portable will not use NVG equipment and will require a NVG filter.
6Attachment 11_Section L.pdf, Section 2.6.6.10 Section J List of Attachments.Will the Government be releasing a JTAGSS Performance Specification during the solicitation period, as mentioned in the following Section L, 2.6.6.10 extract?JTAGSS provided us an updated P-Spec last winter, shouldn't be a problem adding it to the bidders library.

File details come from the government source that posted it. Updated .