This file is a Response to Inquiries document issued by the Air Force Life Cycle Management Center (AFLCMC) regarding solicitation FA8601-26-Q-0016 for OBL-WN/SCARS 4th Floor Furniture. The document addresses 29 questions and answers from potential offerors regarding project specifications, delivery requirements, and furniture configuration details.
Key project details include an intended award date in FY26 prior to September 30, 2026, with installation anticipated to begin in mid-September 2026. The facility is currently under construction, and no pre-award site visit will be scheduled; future site visits will be coordinated with the successful contractor post-award. Delivery involves a loading/receiving dock and passenger elevator, with the distance from dock to destination spanning the length of the plan. The contracting officer clarifies that systems furniture specifications are drawn generically with no basis of design constraint, allowing offerors to use any furniture manufacturer. Communication outlet requirements specify 2 Knock-Out Voice Data Quad Port per cubicle without faceplates, with the COMM vendor responsible for faceplate installation. Power poles are required per attached 01PLN coordinated with construction plans, and a 3-inch panel is mandatory (2.6-inch panels are not acceptable). All furniture must be freestanding; wall mounting is not permitted. For specific typicals (F1A, F1B, H, H2, PO2-D, PO1C, PO2D, PO3-E, TT-1), the contracting officer provides clarifications on component specifications including worksurface depths of 22 inches, lateral file widths of 36 inches (not 30 inches), power strips with 6 outlets, and manufacturer standard configurations for hutches, tackboards, and markerboards. The authorized dealer requirement may be satisfied through subcontractors or teaming partners. Additionally, questions regarding signage are referred to specification CTS33 for fire extinguisher requirements, while office signage such as room numbers and names falls within the furniture package scope.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
AIR FORCE LIFE CYCLE MANAGEMENT CENTER
WRIGHT-PATTERSON AIR FORCE BASE OHIO
One AFMC…Powering the World’s Greatest Air Force
4 June 2026
FROM: AFLCMC/PZIBA
2275 D Street Building 16, Area B Wright-Patterson AFB OH 45433
SUBJECT: Response to Inquiries regarding FA8601-26-Q-0016, OBL-WN/SCARS-4th Floor Furniture
Questions: OBL-WN/SCARS 4th Floor Furniture- Solicitation FA8601-26-Q-0016
1. The Basis of Design is listed as Haworth, Teknion, Allsteel, Miller/Knoll, and Steelcase for Systems Furniture. It looks like the specifications are done in AIS. Do we have to stick to the Basis of Design of Haworth, Teknion, Allsteel, Miller/Knoll, and Steelcase, or are we open to use any manufacturer?
Answer: NO, AIS is not the basis of design. Drawn generically with no basis. You can use any manufacturer.
2. Per the documents provided, we are required to provide communication outlet faceplates. Please confirm how many cables and what type of configuration for each workstation layout.
Answer: 2 Knock-Out Voice Data Quad Port Per Cubicle, no faceplate just the knockout allocation.
3. Please confirm the exact locations of power in the panels for each office and workstation, as the plan view does not specify.
4. What is the intended award date?
Answer: FY26, prior to September 30th
5. Can you confirm the duration for install or anticipated timeframe for installation to begin?
Answer: Begin roughly mid-September 2026 per Construction Schedule.
6. Section 7.0 Delivery - it doesn’t have any building information other than the loading dock delivery times, can you specify any information required for delivery and installation.
Answer: That is CUI until award, there is a passenger elevator and a loading/receiving dock.
7. Section 2-5-13 In the SOW states, contractor to provide all communication outlet face plates are we supposed to supply them?
Answer: Just provide a knockout location, the COMM vendor will take care of the faceplate.
8. Looking at the spec pages, I see power poles are required do we have a count?
Answer: See attached 01PLN-with power pole locations recently coordinated with the construction plans.
9. We are looking at the furniture package and noticed it requires signage. With the signage, does that include all safety signs such as fire extinguishers? Or are we only supplying office signs such as room numbers and names?
Answer: CTS33 is the fire extinguishers.
10. The bid calls for a 3” panel, please confirm if a 2.6” panel is acceptable?
Answer: No.
11. Will a site visit be scheduled for the above-referenced solicitation, OBL-WN/SCARS 4th Floor Furniture?
Answer: The space is currently under construction. Because there is nothing to view at this stage, a pre-award site visit will not be scheduled. Any necessary site visits will be coordinated with the successful offeror after the contract has been awarded.
12. Is Wall mounting allowed or not?
Answer: NO, stated on each typical if required to be freestanding
13. Additionally, please let us know if there are any other related requirements or questions included in the packet.
Answer: Please read the questions/answered form 5/12 and 5/14
14. Do they have a dock?
15. How far is the push from the dock to destination?
Answer: Length of plan
16. If no dock, is it street unload?
17. Is it on the main floor from dock or street? If not do they have a dedicated freight elevator?
Answer: Please read the questions/answered form 5/12 and 5/14 and SOW
18. Are there any stairs that would need to be accounted for?
Answer: No
19. Also, we could not find the sample renderings for F1A, F1B, H, H2, and P02-D. Could you please provide them if available?
Answer: PO2-D was included on the cutsheet, the others do not have a rendering currently, please supply one.
20. Furniture cut sheets call out Mercurial walnut laminate and smoked oak for typicals F5, F1-A,F1- B. H and H2 Confirm Walnut or Oak Answer- Standard Wood Laminate-Walnut is more than likely.
21. Typical F1-B cut sheet drawing shows a transaction top (not included in SOW or Typical Description. Confirm size and height of panels it is attached to Answer: See updated cutsheet F1B, CTS00 has the panel elevations for height.
22. Typical F1-B cut sheet drawing shows a transaction top (not included in SOW or Typical Description. Confirm size and height of (shown under overhead) Answer: I assume you mean F1A, see updated cutsheet, CTS00 has the panel elevations for height. There is no transaction under an overhead.
23. Looking at the spec pages, I see power poles are required do we have a count?
Answer: See attached 01PLN-with power pole locations recently coordinated with the construction plans.
24. PO1C –
In order to have worksurface (WS3) align with the depth of the Locker (LK1) & Lateral File (LF4), it would need to be 22"d. Is that acceptable?
Answer: 22” depth is acceptable WS2, the description notes a Fixed Ped (BBF), where is that to be located within the typical? It isn't noted or shown on the 2D plan or rendering.
Answer: Place the Fixed Ped (B/B/F) in the center of WS2.
WS2, is a Metal Wire Basket acceptable for a wire manager?
Answer: Yes Manufacturer's standard surface mounted Hutch only provides an all-hinged door solution, is that acceptable?
Answer: Yes Manufacturer's standard Tackboard/Markerboard combination is broken up into 3 equal sections where the markerboard section is in the center, is that acceptable?
Answer: Yes LF2 Combo-Manufacturer's standard width is 30", is that acceptable?
Answer: No, accepting 30” W will leave a 6” gap and reducing the WS3 6” is not desirable. Also, 36” W is an industry standard width.
PSS-Manufacturer's standard power strip has 6 outlets, is that acceptable?
25. PO2D
In order to have worksurface (WS3) align with the depth of the Locker (LK1), it would need to be 22"d. Is that acceptable?
Answer: 22” depth is acceptable.
WS2, the description notes a Fixed Ped (BBF), where is that to be located within the typical? It isn't noted or shown on the 2D plan or rendering.
Answer: Place the Fixed Ped (B/B/F) in the center of WS2.
WS2, is a Metal Wire Basket acceptable for a wire manager?
Answer: Yes LF2 Combo-Manufacturer's standard width is 30", is that acceptable?
Answer: No, accepting 30” W will leave a 6” gap and reducing the WS3 6” is not desirable. Also, 36” W is an industry standard width.
Manufacturer's standard surface mounted Hutch only provides an all-hinged door solution, is that acceptable?
Answer: Yes Manufacturer's standard Tackboard/Markerboard combination is broken up into 3 equal sections where the markerboard section is in the center, is that acceptable?
Answer: Yes LF2, Manufacturer's standard depth freestanding Lateral file is 22"d, is that acceptable?
Answer: Yes PSS-Manufacturer's standard power strip has 6 outlets, is that acceptable?
26. PO2-D
In order to have worksurface (WS3) align with the depth of the Locker (LK1), it would need to be 22"d. Is that acceptable?
Answer: 22” depth is acceptable WS2, the description notes a Fixed Ped (BBF), where is that to be located within the typical? It isn't noted or shown on the 2D plan or rendering.
Answer: Place the Fixed Ped (B/B/F) in the center of WS2.
WS2, is a Metal Wire Basket acceptable for a wire manager?
Answer: Yes LF2 Combo-Manufacturer's standard width is 30", is that acceptable?
Answer: No, accepting 30” W will leave a 6” gap and reducing the WS3 6” is not desirable. Also, 36” W is an industry standard width.
Manufacturer's standard surface mounted Hutch only provides an all-hinged door solution, is that acceptable?
Manufacturer's standard Tackboard/Markerboard combination is broken up into 3 equal sections where the markerboard section is in the center, is that acceptable?
27. PO3-E
Manufacturer doesn't have a 36"w Open (no doors) Surface Mounted Hutch, would a 36"w Stacking Bookcase be an acceptable replacement?
Answer: Yes WS2, is a Metal Wire Basket acceptable for a wire manager?
Answer: Yes WS1, the description notes a Fixed Ped (BBF), where is that to be located within the typical? It isn't noted or shown on the 2D plan or rendering. Is that a typo?
Answer: Yes, that is a typo.
Manufacturer's standard Tackboard/Markerboard combination is broken up into 3 sections where the markerboard section is in between tackboards, is that acceptable?
28. TT-1
Is a fabric modesty panel an acceptable alternate?
29. SOW Section 2.1.10 states that the contractor shall be the authorized dealer of the specific furniture manufacturer proposed for the project. May this requirement be satisfied through an authorized dealer subcontractor/teaming partner, or must the prime offeror itself be the authorized dealer?
Answer: Yes, this requirement can be satisfied through an authorized dealer subcontractor/teaming partner.