This is a Questions and Answers document issued by the Air Force Life Cycle Management Center (AFLCMC) in response to inquiries regarding solicitation FA8601-26-Q-0016 for OBL-WN/SCARS 4th Floor Furniture. The document was issued on May 20, 2026, by Contracting Officer Candice Snow.

The solicitation requires systems furniture for the 4th floor, with specifications drawn generically and allowing any manufacturer—no specific basis of design is mandated despite initial reference to Haworth, Teknion, Allsteel, Miller/Knoll, and Steelcase. Communication requirements include 2 Knock-Out Voice Data Quad Port per cubicle with no faceplate supply required, as the communications vendor will provide faceplates. Power locations are specified in an attached 01PLN document that identifies power pole locations coordinated with construction plans. Panel specifications require 3-inch panels (2.6-inch panels are not acceptable), and all furniture must be freestanding per typical drawings—wall mounting is prohibited. Delivery will be to a loading/receiving dock with passenger elevator access; the distance from dock to final destination extends the length of the floor plan. Installation is scheduled to begin roughly mid-September 2026 per the construction schedule. Renderings are provided for furniture type PO2-D; contractors must supply renderings for types F1A, F1B, H, H2, and P02-D. Wood laminate specifications indicate Walnut is more than likely for applicable typicals. The intended award date is FY26 prior to September 30th. Pre-award site visits will not be scheduled as the space is currently under construction; necessary site visits will be coordinated with the successful offeror post-award.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

AIR FORCE LIFE CYCLE MANAGEMENT CENTER

WRIGHT-PATTERSON AIR FORCE BASE OHIO

20 May 2026

FROM: AFLCMC/PZIBA

2275 D Street Building 16, Area B Wright-Patterson AFB OH 45433

SUBJECT: Response to Inquiries regarding FA8601-26-Q-0016, OBL-WN/SCARS-4th Floor Furniture

Questions: OBL-WN/SCARS 4th Floor Furniture- Solicitation FA8601-26-Q-0016

1. The Basis of Design is listed as Haworth, Teknion, Allsteel, Miller/Knoll, and Steelcase for Systems Furniture. It looks like the specifications are done in AIS. Do we have to stick to the Basis of Design of Haworth, Teknion, Allsteel, Miller/Knoll, and Steelcase, or are we open to use any manufacturer?

Answer: NO, AIS is not the basis of design. Drawn generically with no basis. You can use any manufacturer.

2. Per the documents provided, we are required to provide communication outlet faceplates. Please confirm how many cables and what type of configuration for each workstation layout.

Answer: 2 Knock-Out Voice Data Quad Port Per Cubicle, no faceplate just the knockout allocation.

3. Please confirm the exact locations of power in the panels for each office and workstation, as the plan view does not specify.

4. What is the intended award date?

Answer: FY26, prior to September 30th .

5. Can you confirm the duration for install or anticipated timeframe for installation to begin?

Answer: Begin roughly mid-September 2026 per Construction Schedule.

6. Section 7.0 Delivery it doesn’t have any building information other that the loading dock delivery times, can you specify any information required for delivery and installation.

Answer: That is CUI until award, there is a passenger elevator and a loading/receiving dock.

7. Section 2-5-13 In the SOW states contractor to provide all communication outlet face plates are we supposed to supply them?

Answer: Just provide a knock out location, the COMM vendor will take care of the faceplate.

8. Looking at the spec pages, I see power poles are required do we have a count?

Answer: See attached 01PLN-with power pole locations recently coordinated with the construction plans.

9. We are looking at the furniture package and noticed it requires signage. With the signage, does that include all safety signs such as fire extinguishers? Or are we only supplying office signs such as room numbers and names?

Answer: CTS33 is the fire extinguishers.

10. The bid calls for a 3” panel, please confirm if a 2.6” panel is acceptable?

Answer: No.

11. Will a site visit will be scheduled for the above-referenced solicitation, OBL-WN/SCARS 4th Floor Furniture?

Answer: The space is currently under construction. Because there is nothing to view at this stage, a pre-award site visit will not be scheduled. Any necessary site visits will be coordinated with the successful offeror after the contract has been awarded.

12. Wall mounting is allowed or not?

Answer: NO, stated on each typical if required to be freestanding

13. Additionally, please let us know if there are any other related requirements or questions included in the packet.

Answer: Please read the questions/answers from 5/12 and 5/14.

14. Do they have a dock?

15. How far is the push from the dock to destination?

Answer: Length of plan

16. If no dock is it street unload?

17. Is it on the main floor from dock or street? If not do they have a dedicated freight elevator?

Answer: Please read the questions/answers from 5/12 and 5/14 and SOW.

18. Are there any stairs that would need to be accounted for?

Answer: No

19. Also, we could not find the sample renderings for F1A, F1B, H, H2, and P02-D. Could you please provide them if available?

Answer: PO2-D was included on the cutsheet, the others do not have a rendering currently, please supply one.

20. Furniture cut sheets call out Mercurial walnut laminate and smoked oak for typicals F5, F1-A,F1- B. H and H2 Confirm Walnut or Oak Answer: Standard Wood Laminate-Walnut is more than likely.

21. Typical F1-B cut sheet drawing shows a transaction top (not included in SOW or Typical Description. Confirm size and height of panels it is attached to Answer: See updated cutsheet F1B, CTS00 has the panel elevations for height.

22. Typical F1-B cut sheet drawing shows a transaction top (not included in SOW or Typical Description. Confirm size and height of (shown under overhead) Answer: I assume you mean F1A, see updated cutsheet, CTS00 has the panel elevations for height. There is no transaction under an overhead.

23. Looking at the spec pages, I see power poles are required do we have a count?

Answer: See attached 01PLN-with powerpole locations recently coordinated with the construction plans.