Attch__6-Drawings_S-101H_and_S-102.pdf
PDF 6 MB Posted
- Attached to
- Repair-Replace Steam Pipe Stanchions Federal contract opportunity
- Solicitation number
- FA8601-15-R-0030
About this file
Attch 6-Drawings S-101H and S-102
View the file
Other files for this federal contract opportunity
Show all 50
Repair-Replace Steam Pipe Stanchions has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S-101H
BULL HEAD TUNNEL PHOTOS/DESCRIPTIONS
REPAIR PROCEDUREEXISTING CONDITION REPAIR PROCEDUREEXISTING CONDITION REPAIR PROCEDUREEXISTING CONDITION
REPAIR PROCEDUREEXISTING CONDITION REPAIR PROCEDUREEXISTING CONDITION REPAIR PROCEDUREEXISTING CONDITION
REPAIR PROCEDUREEXISTING CONDITION REPAIR PROCEDUREEXISTING CONDITION
101H-a 101H-b 101H-c
101H-f101H-e101H-d
101H-g 101H-h
STANCHION 41.
CORRODED REBAR EXPOSED NEAR
HAS CONCRETE SPALL/CRACKING &
INFILL CONCRETE AT MANHOLE ACCESS
INTRUSION IN CEILING NEAR STANCHION 41.
VOID WITHIN CEILING. CRACKING & WATER
EXPOSED AT EXISTING MORTAR, FILLED
CONCRETE SPALL & CORRODED REBAR
IN CEILING NEAR STANCHION 19.
UNDERSIDE OF CONCRETE BULKHEAD
EXPOSED ALONG HORIZONTAL FACE AT
CONCRETE SPALL & CORRODED REBAR
IN CEILING NEAR STANCHION 19.
UNDERSIDE OF CONCRETE BULKHEAD
EXPOSED ALONG HORIZONTAL FACE AT
CONCRETE SPALL & CORRODED REBAR
WITHIN CEILING AT STANCHION 40.
CONNECTION INTO CONCRETE VOID
TOP OF VERTICAL SUPPORT LEG
AT BASE OF STANCHION 49.
SECTION. WATER INTRUSION PRESENT
CORROSION & LOSS OF STEEL
& CONNECTION CHANNEL HAVE
BASE OF VERTICAL SUPPORT LEGS
STANCHION 49.
BETWEEN VERTICAL SUPPORT LEGS AT
TOP HORIZONTAL ROD SUPPORT MISSING
AT BASE OF STANCHION 49.
CORRODED VERTICAL SUPPORT RODS
SURFACE SPALL REPAIR DETAIL.
SEE 3B & 3C/S-301 FOR CONCRETE
SURFACE SPALL REPAIR DETAIL.
SEE 3B & 3C/S-301 FOR CONCRETE
DETAIL.
SEE 1/S-303 FOR REPLACEMENT OF STANCHION
CLEAN AREA ADJACENT TO EXISTING STANCHION.
SURFACE SPALL REPAIR DETAIL.
SEE 3B & 3C/S-301 FOR CONCRETE
SPALL REPAIR DETAIL.
& 3C/S-301 FOR CONCRETE SURFACE
CRACK INJECTION REPAIR DETAIL, AND 3B
APPLICATION, 3A/S-301 FOR CONCRETE
SEE 2/S-301 FOR INTERNAL WATERPROOFING
OF THE STANCHION.
THE BASE OF THE WALL & AROUND THE BASE
2. CLEAN ALL LOOSE PIECES OF DEBRIS FROM
COATING.
APPLICATION OF A CORROSION RESISTANT
STEEL SHALL BE CLEANED TO ALLOW FOR
STANCHIONS (TO REMAIN) SHALL BE REMOVED.
1. ALL CORROSION PRESENT ON EXISTING STEEL
NOTES:
APPLICATION.
DETAIL & 2/S-301 FOR INTERNAL WATERPROOFING
SEE 1/S-303 FOR REPLACEMENT OF STANCHION
CLEAN AREA ADJACENT TO EXISTING STANCHION.
DETAIL.
SEE 1/S-303 FOR REPLACEMENT OF STANCHION
CLEAN AREA ADJACENT TO EXISTING STANCHION.
DETAIL.
SEE 1/S-303 FOR REPLACEMENT OF STANCHION
CLEAN AREA ADJACENT TO EXISTING STANCHION.
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
RPR/RPL STEAM STANCHIONS
PROJECT NUMBER ZHTV 090018
SUBMITTAL - 100% GOVT. SUBMITTAL
SPR SPR MSS JUNE 2015
S-102
REPAIR LOCATION PLAN
56 STEAM TUNNEL
S-102
LOCATION PLAN
56 TUNNEL REPAIR
NORTH
MATERIALS PRESENT.
THAT MAY HAVE ASBESTOS CONTAINING
CERTAIN ADJOINING HALF ROUND TUNNELS
AREAS OF THE TUNNELS, THERE ARE
BEEN ACCOMPLISHED. HOWEVER, IN FEW
ASBESTOS SURVEY/REMEDIATION HAS
IN MAIN TUNNELS IDENTIFIED IN PROJECT,
NOTE TO CONTRACTOR:
TUNNEL CONCRETE REPLACEMENT
(STANCHION)
LOCATION
SURFACE
TUNNEL
(APPROXIMATE)
LENGTH
24’-0"
1/S-301 EXTERNAL WATERPROOFING APPLICATION DETAIL.
ON S-102 FOR APPLICATION LOCATIONS AND DETAIL
2. FOR EXTERNAL WATERPROOFING APPLICATION, SEE CHART
ALONG TUNNEL CEILING & WALLS.
1. SEE DETAIL 2/S-303 FOR REPLACEMENT OF CONCRETE
NOTES:
EXISTING STANCHION ASSESSMENT
LOCATION
STANCHION
(EXISTING)
REPAIR
CLEAN
(w/ NEW)
REPLACEMENT
(STANCHION)
LOCATIONS
(ALONG TUNNEL LENGTH)
UTILITIES AFFECTED BY EXCAVATIONS
UTILITY TYPE (LINES)
BETWEEN 74 & 76
DWGS.
5. UTILITIES HAVE BEEN IDENTIFITED PER WPFAB EXISTING UTILITY
ELECTRICAL AND COMMUNICATION (COMM) UTILITIES.
EXTRA PRECAUTION MUST BE TAKEN TO AVOID DAMAGE TO
(PARTICULARLY ELECTRIC AND COMM UTILITIES) IS CRITICAL.
SHORING OF UTILITIES, IF EXCAVATING AROUND UTILITIES
01 01 01, BEFORE EXCAVATION AROUND UTILITIES. PROPER
4. REFERENCE WPAFB SPEC 01 01 50, SECTION 1.4, AND SPEC
EXCAVATION AND REPAIR MEANS AND METHODS.
CONTRACTING OFFICER’S REPRESENTATIVE TO REVIEW PLANNED
C. A "PRE-DIG" CONFERENCE SHALL BE CONDUCTED WITH THE
WITH FORM AF103.
B. THE GOVT. WILL CONDUCT A SURVEY OF UTILITIES COMPLETE
AREAS OF EXCAVATION AND SUBMIT FINDINGS TO THE GOVT.
A. THE CONTRACTOR SHALL CONDUCT A UTILITY SURVEY IN ALL
COMMENCEMENT OF EXCAVATION:
3. THE FOLLOWING ITEMS SHALL BE COMPLETED PRIOR TO
UTILITIES TO PREVENT DAMAGE AND DISRUPTION TO SERVICE
2. WHERE NECESSARY, THE CONTRACTOR SHALL HAND DIG AROUND
AS WELL.
NOTED, HOWEVER UTILITIES MAY BE PRESENT IN OTHER AREAS
FOR TUNNEL REPAIRS. AREAS OF SIGNIFICANT CONGESTION ARE
1. EXISTING UTILITIES MAY BE PRESENT IN AREAS OF EXCAVATION
NOTES:
REMAIN.
EXISTING PIPE ROLLER SUPPORTS AT THESE STANCHIONS SHALL
REPAIR ONLY, SHALL NOT NEED NEW PIPE ROLLER SUPPORTS.
3. EXISTING STANCHIONS (WITHIN 56 STEAM TUNNEL) REQUIRING
EXISTING STANCHIONS THAT SHALL REMAIN.
2. SEE SHEET S-302 FOR REPAIRS METHOD REQUIREMENTS TO
EXISTING STANCHION) DETAIL.
1. SEE DETAIL 1/S-303 FOR NEW STANCHION (REPLACEMENT OF
NOTES:
(STANCHION)
LOCATIONS
APPLICATION LOCATIONS
EXTERNAL/INTERNAL WATERPROOFING
WATERPROOFING
EXTERNAL
WATERPROOFING
INTERNAL
IN ORIGINAL LOCATION.
3. RE-SECURE THE CONDUIT AND FIXTURES
FIXTURES AS REQUIRED FOR WORK.
2. REMOVE CONDUIT CLAMPS AND LIGHTING
FIXTURES TO MAINTAIN CIRCUITRY.
1. TEMPORARILY SUPPORT THE CONDUIT AND
(NOTE TO CONTRACTOR):
EXISTING ELECTRICAL CONDUIT INTERFERENCE
PER WPAFB PROCEDURES/SPECIFICATIONS.
PROFILES REMOVED. ANY SEEDING RESTORATIONS SHALL BE
AND CONCRETE (SIDEWALK, CURBS) TO MATCH THE EXISTING
G. CONTRACTOR SHALL REPLACE ANY DEMOLISHED ASPHALT
FOR ADDITIONAL REQUIREMENTS.
EXCAVATION. SEE GENERAL NOTES SECTION, "EARTHWORK",
20% SHALE ROCK PRESENCE FOR ALL AREAS OF
F. CONTRACTOR SHALL INCLUDE EXCAVATION COSTS FOR
S-001, FOR ADDITIONAL REQUIREMENTS PER WPAFB.
E. CONTRACTOR SHALL REFER TO GENERAL NOTES SHEET,
c. REPAIR METHODS
b. REPAIR MATERIALS
a. CONCRETE REMOVAL METHODS
FOLLOW INFORMATION IN TABLES:
REPAIR. THE SEQUENCE AND SCHEDULEOF WORK SHALL
SCHEDULING OF WORK TO BE PERFORMED DURING TUNNEL
USED FOR TUNNEL REPAIR WORK, THE SEQUENCING AND
DESCRIPTION", FOR ALL MATERIALS (PROPERTIES) TO BE
REHABILITATION FOR CIVIL WORKS", SECTION 1.4 "SYSTEM
TUNNEL. REFER TO SPECIFICATION 03 01 32 "CONCRETE
PRIOR TO ANY DEMOLITION/NEW WORK THROUGHOUT THE
C. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS
OF TUNNEL.
B. INDICATES EVERY 5th STANCHION ALONG LENGTH
A. EXTENTS OF 56 TUNNEL REPAIR ASSESSMENT.
SHEET GENERAL NOTES:
59, 60, 62, 73, 74
50, 54, 55, 56, 57, 43, 44, 47, 48, 49, 35, 36, 37, 39, 40, 30, 31, 32, 33, 34, 23, 24, 25, 27, 29, 18, 19, 20, 21, 22, 9, 10, 14, 15, 16, 3, 4, 5, 6, 7, 8, MANHOLE
SERVICE WATER, ELECTRIC UTILITY, ELECTRIC
STORM WATER, WATER VALVE, WATER MAINS,
SANITARY SEWER JUNCTION, WASTEWATER,
BETWEEN 74 & 76 WALL
-BETWEEN 74 & 76 -BETWEEN 24 & 25
APPLICATION.
2. SEE DETAIL 1/S-301 FOR EXTERNAL WATERPROOFING
WATERPROOFING APPLICATION.
REQUIRED. SEE DETAIL 2/S-301 FOR INTERNAL
ADDITIONAL INTERNAL WATERPROOFING APPLICATIONS ARE
1. LOCATIONS DEPICTED IN CHART ARE LOCATIONS WHERE
NOTES:
FOR STANDING WATER AND SUMP PERFORMANCE.
SHALL BE MONITORED PERIODICALLY BY WPAFB MAINTENANCE
TO BE FUNCTIONAL THROUGH WPAFB MAINTENANCE. CONDITIONS
E. WATER PRESENT AT BASE OF TUNNEL. EXISTING SUMP VERIFIED
PER SHEET S-301.
THROUGH WALL w/ APPLICABLE CONCRETE REPAIR METHODS
OF PIPES THROUGH TUNNEL WALLS. PATCH PENETRATION
SEE S-102G FOR DEPICTION AND LOCATION OF PENETRATION
WALL AND DISPOSE OF PER WPAFB DISPOSAL PROCEDURES.
D. DEMOLISH ABANDONED PIPES PENETRATING THRU TUNNEL
DISPOSE OF PER WPAFB DISPOSAL PROCEDURES.
C. ABANDONED PIPE (ALONG STANCHIONS) REMOVAL REQUIRED.
WATERPROOFING (BEYOND TYPICAL 1’-0" BASE APPLICATION).
ON S-102 FOR LOCATIONS OF REQUIRED INTERNAL
3C/S-301 FOR APPLICABLE REPAIR METHOD). SEE CHART
REINFORCING BARS WITH CORROSION (SEE DETAILS 3B &
SPALLING CONCRETE AND CLEANING/REPLACING EXISTING
WATER INTRUSION (SEE DETAIL 3A/S-301), PATCH FOR
2/S-301), INJECTION OF CRACKS ALONG CONCRETE FOR
WATERPROOFING THE FACE OF THE TUNNEL (SEE DETAIL
AND SLAB REQUIRED. REPAIRS SHALL INCLUDE INTERNAL
B. CONCRETE REPAIR ALONG THE TUNNEL WALLS, CEILING,
INFORMATION.
SEE SPECIFICATION 23 05 15 FOR APPLICABLE PIPE ROLLER
PIPE ROLLER SUPPORT AT THE NECESSARY PIPE LOCATIONS.
STANCHIONS. NEW STANCHIONS SHALL REQUIRE NEW
REQUIRED ACTION BASED ON ASSESSMENT OF EXISTING
ON S-102 INDICATING STANCHIONS WITHIN TUNNEL AND
REQUIRED. SEE "EXISTING STANCHON ASSESSMENT" CHART
A. EXISTING PIPE STANCHION REPAIR OR FULL REPLACEMENT
DRAWING NOTES:
SCALE: N.T.S.
11, 12, 13, 63
88, 89, 90
84, 85, 86, 87, 80, 81, 82, 83, 76, 77, 78, 79, 70, 71, 72, 75, 66, 67, 68, 69, 58, 61, 64, 65, 46, 51, 52, 53, 38, 41, 42, 45, 1, 2, 17, 26, 28, COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
RPR/RPL STEAM STANCHIONS
PROJECT NUMBER ZHTV 090018
SUBMITTAL - 100% GOVT. SUBMITTAL
SPR SPR MSS JUNE 2015
A
A
A
A
A
A
A C
A B
A E
A D
A
C
E
C
E
A
B
E
B
A
C
A
B
A
OF BLDG.
ALONG EDGE
SIDEWALK
& PARKING
ROADWAY
OF BLDG.
ALONG EDGE
SIDEWALK
& PARKING
ROADWAY
SIDEWALK
ROADWAY
AREA
PARKING
ROADWAY
(BETWEEN 74 & 76)
ALONG THIS WALL
REPLACEMENT
& CONC. TUNNEL
EXCAVATION
File details come from the government source that posted it. Updated .