Attch_19-Drawings_S-105F_and_S-105G.pdf

PDF 9 MB Posted

Attached to
Repair-Replace Steam Pipe Stanchions Federal contract opportunity
Solicitation number
FA8601-15-R-0030
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

Attch 19-Drawings S-105F and S-105G

View the file

Other files for this federal contract opportunity

Other files attached to Repair-Replace Steam Pipe Stanchions, newest first.
File Type Posted
Attch_63Addend_03_Colored_S-105F-updated.pdf PDF
Attch_61_Addend_03_Colored_S-105D-updated.pdf PDF
Attch_62_Addend_03_Colored_S-105E.pdf PDF
Attch_33_Addend_03_Colored_G-001.pdf PDF
Attch_54_Addend_03_Colored_S-104B.pdf PDF
Attch_63Addend_03_Colored_S-105F.pdf PDF
Attch_56_Addend_03_Colored_S-104D.pdf PDF
Attch_55_Addend_03_Colored_S-104C.pdf PDF
Attch_45_Addend_03_Colored_S-102D.pdf PDF
FA8601-15-R-0030-0002_Amendment_2.pdf PDF
Attch_39_Addend_03_Colored_S-101F.pdf PDF
Attch_61_Addend_03_Colored_S-105D.pdf PDF
Attch_41_Addend_03_Colored_S-101H.pdf PDF
Attch_37_Addend_03_Colored_S-101D.pdf PDF
Attch_48_Addend_03_Colored_S-102G.pdf PDF
Attch_59_Addend_03_Colored_S-105B.pdf PDF
Attch_46_Addend_03_Colored_S-102E.pdf PDF
Attch_36_Addend_03_Colored_S-101C.pdf PDF
Attch_43_Addend_03_Colored_S-102B.pdf PDF
Attch_42_Addend_03_Colored_S-102A.pdf PDF
Attch_58_Addend_03_Colored_S-105A.pdf PDF
Attch_38_Addend_03_Colored_S-101E.pdf PDF
Attch_57_Addend_03_Colored_S-104E.pdf PDF
Attch_47_Addend_03_Colored_S-102F.pdf PDF
RFI_0001.pdf PDF
RFI_0002.pdf PDF
108001-00181-S-303.pdf PDF
FA8601-15-R-0030_Addendum_Number_02.pdf PDF
Sign_In_Sheet_FA8601-15-R-0030.pdf PDF
Rules_of_Engagement.pdf PDF
Attch__18-Drawings_S-105D_and_S-105E.pdf PDF
Attch__17-Drawings_S-105B_and_S-105C.pdf PDF
Attch_23-Addendum_Number_01.pdf PDF
Attch__12-Drawings_S-103B_and_S-103C.pdf PDF
Attch__16-Drawings_S-105_and_S-105A.pdf PDF
Attch__22-General_Decision_Number_OH150002_OH2_12-Jun-15.pdf PDF
Attch_2-Drawings_G-001_S-001_S-101_and_S-101A.pdf PDF
Attch__13-Drawings_S-104_and_S-104A.pdf PDF
Attch_29_Addend_01_Table_of_Contents.pdf PDF
FA8601-15-R-0030.pdf PDF
Attch__20-Drawings_S-301_and_S-302.pdf PDF
Attch__6-Drawings_S-101H_and_S-102.pdf PDF
Attch__21-Drawings_S-303.pdf PDF
Attch__14-Drawings_S-104B_and_S-104C.pdf PDF
Attch_1-Specifications.pdf PDF
Attch_8-Drawings_S-102C_and_S-102D.pdf PDF
Attch__5-Drawings_S-101F_and_S-101G.pdf PDF
Attch_28-Addend_01_Cover_Page.pdf PDF
Attch_25-_Addend_01_DWG_S-301.pdf PDF
Attch_24-_Addend_01_DWG_S-101.pdf PDF
Show all 50

Repair-Replace Steam Pipe Stanchions has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S-105F 5th STREET TUNNEL PHOTOS/DESCRIPTIONS 37

EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE

EXISTING CONDITION REPAIR PROCEDUREEXISTING CONDITION REPAIR PROCEDUREEXISTING CONDITION REPAIR PROCEDURE

EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE

105F-c105F-b105F-a

105F-d 105F-e 105F-f

105F-h105F-g

CEILING BETWEEN STANCHIONS 8 & 9.

REBAR EXPOSED NEAR VOID WITHIN

CONCRETE SPALL & CORRODED

NEAR CRACK AT STANCHION 12.

REBAR EXPOSED WITHIN CEILING

CONCRETE SPALL & CORRODED

IN CEILING AT STANCHION 20.

REBAR EXPOSED NEAR CRACK

CONCRETE SPALL & CORRODED

STEAM PIPES AT STANCHION 20.

PIECES FROM CEILING SITTING ATOP

EXPOSED WITHIN CEILING. CONCRETE

CONCRETE SPALL & CORRODED REBAR

WITHIN CEILING AT STANCHION 54.

REBAR EXPOSED NEAR CRACK

CONCRETE SPALL & CORRODED

NEAR STANCHION 7.

AT BASE. CRACKING WITHIN WALL

ENTRANCE LADDER w/ CORROSION

SUPPORT BETWEEN STANCHIONS 44 & 50.

PRESENT WITHIN CEILING & AROUND TOP

CONCRETE PATCH WORK & JOINT FILLER

EXPOSED WITHIN CEILING. EXISTING

CONCRETE SPALL & CORRODED REBAR

BETWEEN STANCHIONS 44 & 50.

WITHIN CEILING & AROUND TOP SUPPORT

PATCH WORK & JOINT FILLER PRESENT

EXPOSED WITHIN CEILING. EXISTING CONCRETE

CONCRETE SPALL & CORRODED REBAR

CONCRETE WALL.

SEE 5/S-302 FOR ATTACHMENT TO

MANHOLE ACCESS & BASE OF TUNNEL.

PROVIDE NEW VERTICAL LADDER BETWEEN

OF CONCRETE TUNNEL DETAIL.

APPLICATION AND 2/S-303 FOR REPLACEMENT

SEE 1/S-301 FOR EXTERNAL WATERPROOFING

OF CONCRETE TUNNEL DETAIL.

APPLICATION AND 2/S-303 FOR REPLACEMENT

SEE 1/S-301 FOR EXTERNAL WATERPROOFING

OF CONCRETE TUNNEL DETAIL.

APPLICATION AND 2/S-303 FOR REPLACEMENT

SEE 1/S-301 FOR EXTERNAL WATERPROOFING

SURFACE SPALL REPAIR DETAIL.

APPLICATION AND 3B & 3C/S-301 FOR CONCRETE

SEE 2/S-301 FOR INTERNAL WATERPROOFING

OF CONCRETE TUNNEL DETAIL.

APPLICATION AND 2/S-303 FOR REPLACEMENT

SEE 1/S-301 FOR EXTERNAL WATERPROOFING

OF CONCRETE TUNNEL DETAIL.

APPLICATION AND 2/S-303 FOR REPLACEMENT

SEE 1/S-301 FOR EXTERNAL WATERPROOFING

OF CONCRETE TUNNEL DETAIL.

APPLICATION AND 2/S-303 FOR REPLACEMENT

SEE 1/S-301 FOR EXTERNAL WATERPROOFING

OF THE STANCHION.

THE BASE OF THE WALL & AROUND THE BASE

2. CLEAN ALL LOOSE PIECES OF DEBRIS FROM

COATING.

APPLICATION OF A CORROSION RESISTANT

STEEL SHALL BE CLEANED TO ALLOW FOR

STANCHIONS (TO REMAIN) SHALL BE REMOVED.

1. ALL CORROSION PRESENT ON EXISTING STEEL

NOTES:

COORDINATOR ENGINEERING CHIEF

DATE REVISION BYNO. DATE NO. REVISION BY

C I

V

IL

ENGI

N

E E

R

US AF

WRIGHT-PATTERSON AIR FORCE BASE

88TH ABW

OF

DESIGN CHIEF

DATEDRAWNDESIGNED CHECKED

RPR/RPL STEAM STANCHIONS

PROJECT NUMBER ZHTV 090018

SUBMITTAL - 100% GOVT. SUBMITTAL

SPR SPR MSS JUNE 2015

S-105G 5th STREET TUNNEL PHOTOS/DESCRIPTIONS 38

EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE

EXISTING CONDITION REPAIR PROCEDURE

105G-c105G-b105G-a

105G-d

OF VENT OPENING AT STANCHION 27.

REBAR EXPOSED ALONG PERIMETER

CONCRETE SPALL & CORRODED

CEILING AT OPENING NEAR STANCHION 50.

OPENING. CRACKING PRESENT WITHIN

EXPOSED ALONG PERIMETER OF VENT

CONCRETE SPALL & CORRODED REBAR

AT BASE NEAR STANCHION 27.

& MISSING PORTION OF VERTICAL SUPPORT

ENTRANCE LADDER w/ CORROSION

SUPPORT AT BASE NEAR STANCHION 50.

& MISSING PORTION OF VERTICAL

ENTRANCE LADDER w/ CORROSION

OF THE STANCHION.

THE BASE OF THE WALL & AROUND THE BASE

2. CLEAN ALL LOOSE PIECES OF DEBRIS FROM

COATING.

APPLICATION OF A CORROSION RESISTANT

STEEL SHALL BE CLEANED TO ALLOW FOR

STANCHIONS (TO REMAIN) SHALL BE REMOVED.

1. ALL CORROSION PRESENT ON EXISTING STEEL

NOTES:

CONCRETE WALL.

SEE 5/S-302 FOR ATTACHMENT TO

MANHOLE ACCESS & BASE OF TUNNEL.

PROVIDE NEW VERTICAL LADDER BETWEEN

CONCRETE WALL.

SEE 5/S-302 FOR ATTACHMENT TO

MANHOLE ACCESS & BASE OF TUNNEL.

PROVIDE NEW VERTICAL LADDER BETWEEN

SURFACE SPALL REPAIR DETAIL.

APPLICATION, & 3B & 3C/S-301 FOR CONCRETE

SEE 2/S-301 FOR INTERNAL WATERPROOFING

SURFACE SPALL REPAIR DETAIL.

APPLICATION, & 3B & 3C/S-301 FOR CONCRETE

SEE 2/S-301 FOR INTERNAL WATERPROOFING

COORDINATOR ENGINEERING CHIEF

DATE REVISION BYNO. DATE NO. REVISION BY

C I

V

IL

ENGI

N

E E

R

US AF

WRIGHT-PATTERSON AIR FORCE BASE

88TH ABW

OF

DESIGN CHIEF

DATEDRAWNDESIGNED CHECKED

RPR/RPL STEAM STANCHIONS

PROJECT NUMBER ZHTV 090018

SUBMITTAL - 100% GOVT. SUBMITTAL

SPR SPR MSS JUNE 2015

File details come from the government source that posted it. Updated .