Attch_2-Drawings_G-001_S-001_S-101_and_S-101A.pdf
PDF 7 MB Posted
- Attached to
- Repair-Replace Steam Pipe Stanchions
- Solicitation number
- FA8601-15-R-0030
About this file
Attch 2-Drawings G-001 S-001 S-101 and S-101A
View the file
Other files
Show 40 more
Latest 50 of 72 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G-001
GENERAL
DRAWING INDEX
G-00101
CONTRACT NUMBER: FA8601-13-D-0003
LOCATION MAP
GATE
MAIN
STREET
MEMORIAL ROAD
FIRST STREET
STREET
G
SIXTH STREET
SEVENTH STREET
E
S T
R E
E T
K
R E
E T
S H
E L
IN
D R
IV
R
H
R E
E
WAYMONOHAN WAY
B
R E
E
R E
E
R E
E T
FOURTH STREET
R E
E T
A
S
T R
E E
T
FOURTH
FIFTH
C
R E
E T
A
S T
R E E T
LO
O P
R O
A D
NIN
TH
STREET
C E
N T
E N
N A
L
B
V D
N
IN
H
R E
E T
R E
E T
G
R E
E
T EIGHTH
K
R E
E T
TENTH
FIFTH STREET
SEVENTH STREET
R E
E T
STREET
STREET
TENTH
NINTH STREET
HANDRAIL
MEM
S K
Y L
IN
E
D R
IV
E
ROAD
ORIAL
C
R E
E T
STRUCTURAL
S-001
03 S-101
12 S-102
21 S-103
25 S-104
31 S-105
AERIAL VIEW
(PROJECT #ZHTV 090018)
AREA B STEAM TUNNELS
RPR/RPL STEAM STANCHIONS
BULL HEAD TUNNEL
U
N N
E L
U
N N
E L
32 CROSSOVER TUNNEL
5th STREET TUNNEL
STRUCTURAL GENERAL NOTES
BULL HEAD STEAM TUNNEL REPAIR LOCATION PLAN
56 STEAM TUNNEL REPAIR LOCATION PLAN
52 STEAM TUNNEL REPAIR LOCATION PLAN
5th STREET STEAM TUNNEL REPAIR LOCATION PLAN
32 CROSSOVER STEAM TUNNEL REPAIR LOCATION PLAN
04 S-101A
05 S-101B
06 S-101C
07 S-101D
09 S-101F
10 S-101G
11 S-101H
BULL HEAD TUNNEL PHOTOS/DESCRIPTIONS
BULL HEAD TUNNEL PHOTOS/DESCRIPTIONS
BULL HEAD TUNNEL PHOTOS/DESCRIPTIONS
BULL HEAD TUNNEL PHOTOS/DESCRIPTIONS
BULL HEAD TUNNEL PHOTOS/DESCRIPTIONS
BULL HEAD TUNNEL PHOTOS/DESCRIPTIONS
BULL HEAD TUNNEL PHOTOS/DESCRIPTIONS
BULL HEAD TUNNEL PHOTOS/DESCRIPTIONS
13 S-102A
14 S-102B
15 S-102C
16 S-102D
17 S-102E
18 S-102F
56 TUNNEL PHOTOS/DESCRIPTIONS
56 TUNNEL PHOTOS/DESCRIPTIONS
56 TUNNEL PHOTOS/DESCRIPTIONS
56 TUNNEL PHOTOS/DESCRIPTIONS
56 TUNNEL PHOTOS/DESCRIPTIONS
56 TUNNEL PHOTOS/DESCRIPTIONS
19 S-102G
20 S-102H
56 TUNNEL PHOTOS/DESCRIPTIONS
56 TUNNEL PHOTOS/DESCRIPTIONS
22 S-103A 52 TUNNEL PHOTOS/DESCRIPTIONS
S-103B 52 TUNNEL PHOTOS/DESCRIPTIONS
S-103C 52 TUNNEL PHOTOS/DESCRIPTIONS
32 CROSSOVER TUNNEL PHOTOS/DESCRIPTIONS
32 CROSSOVER TUNNEL PHOTOS/DESCRIPTIONS
32 CROSSOVER TUNNEL PHOTOS/DESCRIPTIONS
32 CROSSOVER TUNNEL PHOTOS/DESCRIPTIONS
32 CROSSOVER TUNNEL PHOTOS/DESCRIPTIONS
S-104A
S-104B
S-104C
S-104D
S-104E
S-105A32 5th STREET TUNNEL PHOTOS/DESCRIPTIONS
S-105B33 5th STREET TUNNEL PHOTOS/DESCRIPTIONS
S-105C34 5th STREET TUNNEL PHOTOS/DESCRIPTIONS
S-105D35 5th STREET TUNNEL PHOTOS/DESCRIPTIONS
S-105E36 5th STREET TUNNEL PHOTOS/DESCRIPTIONS
S-105F37 5th STREET TUNNEL PHOTOS/DESCRIPTIONS
S-105G38 5th STREET TUNNEL PHOTOS/DESCRIPTIONS
S-30139
SECTIONS
STRUCTURAL CONCRETE REPAIR DETAILS &
S-30240 STEEL STANCHION REPAIR DETAILS & SECTIONS
S-30341
DRAWING INDEX AND LOCATION MAPS
DRAWING INDEX AND LOCATION MAPS
S-101E
REPLACEMENT DETAILS
CONCRETE TUNNEL ELEMENT & STEAM STANCHION
ASSESSMENT
AREA B TUNNEL
EXTENTS OF
DURING CONST. PROCESS
FOR EXACT LOCATION
COORDINATE w/ WPAFB
AREA (PRELIM).
STAGING/LAY-DOWN
AREA DESIGNATED FOR
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
RPR/RPL STEAM STANCHIONS
PROJECT NUMBER ZHTV 090018
SUBMITTAL - 100% GOVT. SUBMITTAL
SPR SPR MSS JUNE 2015
S-001
STRUCTURAL GENERAL NOTES 02
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
OF
PROJECT NUMBER ZHTV 090018
SUBMITTAL - 100% GOVT. SUBMITTAL
SPR SPR MSS JUNE 2015
OF THE SHOP DRAWINGS TO THE GENERAL CONTRACTOR.
WORK IS PERMITTED TO COMMENCE UNTIL THE RETURN OF A STAMPED, APPROVED COPY
SHALL BE CIRCLED AND NOTED ON THE SHOP DRAWINGS BY THE CONTRACTOR. NO SHOP
CONTRACTOR PRIOR TO SUBMISSION. ALL DEVIATIONS FROM THE ENGINEERING DRAWINGS
AND/OR SUBCONTRACTORS SHALL BE REVIEWED AND STAMPED BY THE GENERAL
SHOP DRAWINGS REQUIRED BY THE PROJECT SPECIFICATIONS AND PREPARED BY SUPPLIERS4.
OR ERECTION
CONTRACTOR PRIOR TO ANY SHOP DRAWING SUBMISSION, FABRICATION, CONSTRUCTION,
DIMENSIONS PERTAINING TO EXISTING CONDITIONS SHALL BE FIELD VERFIED BY THE5.
GROUT UNDER STEEL BEARINGS SHALL BE IN CONFORMANCE WITH ASTM C1107, 9,000 PSI3.
ALL CONCRETE SHALL BE NORMAL WEIGHT, WITH AGGREGATES CONFORMING TO ASM C33.1.
ADMIXTURES SHALL CONFORM TO ASTM C494.
CHLORIDE BASED ADMIXTURES ARE PROHIBITED IN ALL REINFORCED CONCRETE. OTHER4.
B. BOTTOM BARS DIRECTLY OVER SUPPORTS
A. TOP BARS NEAR MIDSPAN
BE LAPPED AS FOLLOWS:
TOP AND BOTTOM BARS DESIGNATED AS CONTINUOUS IN STRUCTURAL DRAWINGS SHALL10.
SPLICING OF STRUCTURAL STEEL IS PROHIBITED EXCEPT AS DETAILED. 2.
AND WELDING ELECTRODES SHALL BE E70XX OR AS REQUIRED BY EXISTING MATERIALS.
WELDING SHALL CONFORM TO THE CURRENT AWS D1.1 "STRUCTURAL WELDING CODE-STEEL", 5.
THE CONTRACTING OFFICER FOR REVIEW BEFORE ANY WELDING IS PERMITTED TO BEGIN.
"STRUCTURAL WELDING CODE-STEEL". PROOF OF CERTIFICATION SHALL BE SUBMITTED TO
BEEN PREVIOUSLY QUALIFIED BY TESTS AS PRESCRIBED IN THE CURRENT AWS D1.1
WELDS SHALL BE MADE ONLY BY CERTIFIED WELDERS AND WELDING OPERATORS WHO HAVE 6.
THE FOLLOWING SUPPLEMENTAL REQUIREMENTS:
AND "CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES", WITH
FOR THE DESIGN, FABRICATION AND ERECTION OF STRUCTURAL STEEL BUILDINGS",
REQUIREMENTS OF THE CURRENT, BUILDING CODE ADOPTED, AISC "SPECIFICATION
THE FABRICATIONS AND ERECTION OF STRUTURAL STEEL SHALL CONFORM TO ALL
ABV
ACI
ACM
ALTERNATE
WT
HORIZONTAL
ABOVE
AFF ABOVE FINISHED FLOOR
ALT
APPROX
ASTM
APPROXIMATE
BUILDING LINE
BUILDING
BASEMENT
BETWEEN
BOTTOM
BL
BLDG
BOT
BSMT
BTWN
CONC
CONN
CONTR CONTRACT(OR)
CONNECTION
CONCRETE
DEMOLISHDEMO
DR DRAIN
EA
EL
ENTR
EQ
EQUIP
EXIST
EQUIPMENT
EXISTING
EQUAL
ENTRANCE
ELEVATION
EACH
FOUNDATION
FLOOR
FACE OF CONCRETE
FOOTINGFTG
FOC
FL
FDN
WEIGHT
W/O
W/ WITH
WITHOUT
VERTICALVERT
UNO UNLESS NOTED OTHERWISE
THICK(NESS)
TYPICALTYP
THK
STL
SYS
STEEL
SYSTEM
REINFORCED CONCRETE
REQUIREDREQD
RC
POUNDS PER CUBIC FOOT
PERIMETERPERIM
PCF
OH OVERHEAD
NOT TO SCALENTS
MTL
MISC
MIN
MECH
MAX MAXIMUM
MECHANIC(AL)
MINIMUM
METAL
MISCELLANEOUS
HORIZ
GOVT
GD GRADE, GRADING
GOVERNMENT
ABBREVIATIONS
COL COLUMN
MANUF MANUFACTURER
INSTITUTE
AMERICAN CONCRETE
MATERIAL
ASBESTOS CONTAINING
TESTING AND MATERIALS
AMERICAN SOCIETY FOR
ENGINEER DETERMINES OTHERWISE
IMMEDIATELY. THE STRICTEST PROVISION SHALL GOVERN UNLESS THE STRUCTURAL
DRAWINGS SHALL BE BROUGHT TO THE ATTENTION OF THE STRUCTURAL ENGINEER
OR CONFLICTS FOUND BETWEEN THE PROJECT SPECIFICATIONS AND THE STRUCTURAL
DRAWINGS TO DETERMINE THE COMPLETE PROJECT REQUIREMENTS. ANY DISCREPANCIES
THE PROJECT SPECIFICATIONS SHALL BE USED IN CONJUNCTION WITH THE STRUCTURAL3.
CAST-IN-PLACE CONCRETEGENERAL NOTES
ALL WELDED WIRE FABRIC SHALL CONFORM TO ASTM A185.
ALL REINFORCING STEEL SHALL BE DEFORMED AND CONFORM TO ASTM A615 GRADE 60 KSI. 7.
6.
CONCRETE COVER ON REINFORCING STEEL SHALL BE PER ACI, UNLESS NOTED OTHERWISE.8.
IF PROPERLY DESIGNED.
CONTINUOUS THROUGH THE CONSTRUCTION JOINT. OTHER LOCATIONS MAY BE ACCEPTABLE
ADEQUATE DOWELS (SMOOTH) TO TRANSFER THE SHEAR AND EXTEND ALL REINFORCING
SHALL OCCUR WITHIN THE MIDDLE THIRD OF THE SPAN OF THE MEMBER. PROVIDE
APPROVAL FROM THE STRUCTURAL ENGINEER. CONSTRUCTION JOINTS IN SLABS
JOINTS NOT INDICATED ON STRUCTURAL DRAWINGS ARE NOT PERMITTED WITHOUT11.
STRUCTURAL STEEL
GOVERNING DESIGN SPECIFICATION
STRUCTURAL DESIGN DATA
ADDITION OF PLASTICIZERS), AS DETERMINED IN ACCORDANCE WITH ASTM C143
MAXIMUM SLUMP SHALL BE 4" (BEFORE ADDITION OF PLASTICIZERS) & 8" (AFTER 5.
4,500 PSI A. ALL CONCRETE WORK INDICATED
CONCRETE SHALL DEVELOP THE FOLLOWING 28-DAY COMPRESSIVE STRENGTH (F’c):2.
WITH ANY ADDITIONAL WORK.
CONTRACTING OFFICER AND STRUCTURAL ENGINEER FOR RESOLUTION BEFORE PROCEEDING
FIELD OBSERVATION. THE CONTRACTOR SHALL REPORT ANY DISCREPANCIES TO THE
INTENDED TO CONFORM WITH THE INFORMATION PROVIDED ON EXISTING DRAWINGS, AND BY
OTHERWISE. ALL DIMENSIONS AND ELEVATIONS SHOWN ON STRUCTURAL DRAWINGS WERE
TO BE TYPICAL FOR SIMILAR SITUATIONS ELSEWHERE, UNLESS SPECIFICALLY NOTED
ALL DETAILS SECTIONS, AND NOTES PROVIDED ON STRUCTURAL DRAWINGS ARE INTENDED6.
ON PLANS.
AFTER COMPLETION OF NEW WORK. FIELD VERIFY LOCATIONS OF ALL OBSTRUCTIONS SHOWN
REMOVED AND RE-INSTALLED (INCLUDING NECESSARY MODIFICATIONS) BY THE CONTRACTOR
EXISTING UTILITIES AND ALL OTHER OBSTRUCTIONS TO WORK SHALL BE TEMPORARILY 7.
BE MODIFIED OR REMOVED WITHOUT PRIOR WRITTEN CONSENT OF STRUCTURAL ENGINEER.
ANY STEEL FABRICATION OR CONCRETE PLACEMENT. NO EXISTING STRUCTURAL MEMBERS MAY
COORDINATE ALL REQUIRED DIMENSIONS WITH APPLICABLE TRADE CONTRACTORS PRIOR TO 8.
TUNNEL EXCAVATION
NOTED.
ACI STANDARD REQUIREMENTS. CLASS B LAPS SHALL BE USED UNLESS OTHERWISE
AND LAPS, WHEN NOT SPECIFICLLY DIMENSIONED ON DRAWINGS, SHALL BE AS PER
OTHERWISE. HOOKS MAY BE ROTATED TO MAINTAIN CLEARANCES. ALL BAR SPLICES
ALL HOOK BARS SHALL CONTAIN 90 DEGREE ACI STANDARD HOOKS UNLESS NOTED 9.
A MINIMUM YIELD STRESS (Fy) OF 42 KSI FOR ROUND SHAPES.
A MINIMUM YIELD STRESS (Fy) OF 46 KSI FOR SQUARE AND RECTANGULAR SHAPES, AND
HOLLOW STRUCTURAL SECTIONS (HSS) SHALL CONFORM TO ASTM A500 GRADE B, WITH
ALL PLATES, BARS, CHANNELS, AND ANGLES SHALL CONFORM TO ASTM A36, Fy=36 KSI.1.
UFC 3-301-01, STRUCTURAL ENGINEERING (WITH CHANGE 1, 15 MAY 2014)
AWS, STRUCTURAL WELDING CODE D1.1
OR OTHERWISE APPLICABLE
OTHER UFC’s, EXECTUVIE ORDERS, DESIGN GUIDES, AS REFERENCE
AISC, STEEL CONSTRUCTION MANUAL, LATEST EIDTION
ACI 318, BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE
ASCE 7, MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES
THE FOLLOWING DOCUMENTS:
APPLICABLE PROVISIONS OF THE CURRENT ACCEPTED EDITION OF
ON PROVEN TECHNIQUES THAT ARE DONE IN ACCORDANCE WITH
ALL WORK FOR THE STRUCTURAL REPAIRS WAS DEVELOPED BASED
BRG BEARING
G. NO ASBESTOS-CONTAINING MATERIAL SHALL BE INSTALLED DURING THIS PROJECT.
WPAFB SPECIFICATION SECTION 02 09 00.
F. ANY LEAD CONTAINING PAINT CONTROL MEASURES SHALL BE PERFORMED IN ACCORDANCE WITH
SPECIFICATION SECTION 02 08 10.
E. REMOVE AND DISPOSE OF ANY ASBESTOS CONTAINING MATERIAL IN ACCORDANCE WITH WPAFB
RECYCLING PM, DAVE DALTON, AT (937) 257-5060 OR david.dalton.2@wpafb.af.mil.
JANUARY 7, COVERING THE THREE MONTHS PRIOR. FOR ADDITIONAL INFORMATION, CONTACT THE
THE QUARTERLY SUMMARY REPORTS SHALL BE RECEIVED ON APRIL 7, JULY 7, OCTOBER 7, AND
d. EXPLANATION OF THE DIVERSION RATE IF LESS THAN 50%.
c. THE DOLLAR AMOUNT EARNED BY RECYCLING.
DISPOSED OF.
b. THE TONNAGE OF CONSTRUCTION AND DEMOLITION MATERIALS LAND-FILLED OR OTHERWISE
WEIGHT SLIPS (I.E. RECYCLED, REUSED).
a. THE TONNAGE DIVERTED CONSTRUCTION AND DEMOLITION MATERIALS AND CORRESPONDING
SPECIFICATION SECTION 01 02 20, STATING:
SUMMARY REPORT TO THE GOVERNMENT CONTRACT REPRESENTATIVE IN ACCORDANCE WITH WPAFB
ARE RECYCLABLE AND TO COORDINATE TURN-IN. THE CONTRACTOR SHALL SUBMIT A QUARTERLY
CONTACT WPAFB RECYCLING PROGRAM MANAGER AT (937) 257-5060 TO CONFIRM WHAT MATERIALS
THE WPAFB RECYCLING CENTER IN ACCORDANCE WITH WPAFB SPECIFICATION SECTION 01 02 20.
DEMOLITION DEBRIS AND ARE NOT SCHEDULED FOR OFF-SITE RECYCLING, CAN BE TURN INTO
CENTER. OTHER RECYCLABLE MATERIALS THAT ARE COST EFFECTIVELY SEGREGATED FROM
DISPOSAL. ALL RECYCLABLE METAL IS TO BE RECYCLED THROUGH THE BASE RECYCLING
D. THE WPAFB RECYCLING CENTER IS AVAILABLE FOR CONTRACTOR USE TO REDUCE WASTE
01 02 20.
C. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH WPAFB SPECIFICATION SECTION
AN EROSION CONTROL PLAN IS REQUIRED PRIOR TO SOIL DISTURBANCE.
EROSION CONTROL MEASURES. FOR PROJECTS THAT DISTURB LESS THAN AN ACRE OF SOIL,
B. SOIL DISTURBANCE DURING THIS PROJECT, INCLUDING EQUIPMENT STAGING AREA, WILL REQUIRE
INFORMATION.
CONTACT DAVE DALTON AT (937) 257-5060 OR david.dalton.2@wpafb.af.mil FOR ADDITIONAL
A. ALL METAL AND WIRING NEEDS TO BE RECYCLED AT THE WPAFB BASE RECYCLING CENTER.
PER WRIGHT PATTERSON AIR FORCE BASE ENVIRONMENTAL PROCEDURES:9.
VIF VERIFY IN FIELD
SS STAINLESS STEEL
WITH THE FOLLOWING SUPPLEMENTAL REQUIREMENTS:
CODE ADOPTED, ACI 301, "SPECIFICATIONS FOR STRUCTURAL CONCRETE FOR BUILDINGS",
ALL CONCRETE WORK SHALL CONFORM TO ALL REQUIREMENTS OF THE CURRENT, BUILDING
UTILITIES AND EXISTING FOUNDATIONS.
ALL EXCAVATION WORK SHALL PROCEED WITH CAUTION TO AVOID DAMAGE TO UNKNOWN UNDERGROUND 1.
EARTHWORK
10. BLASTING SHALL NOT BE AN ACCEPTABLE METHOD FOR ROCK EXCAVATION.
EQUIPMENT.
STEEL-WHEELED ROLLERS, VIBRATORY COMPACTORS, OR OTHER APPROVED
CONHESIONLESS MATERIALS. FINISH COMPACTION BY SHEEPSFOOT ROLLERS,
COHESIVE MATERIALS OR 95% LABORATORY MAXIMUM DENSITY FOR
AND COMPACT TO AT LEAST 90% LABORATORY MAXIMUM DENSITY FOR
9. PLACE BACKFILL ADJACENT TO ANY AND ALL TYPES OF STRUCTURES,
CONSTRUCTION TO ASSESS SITE CONDITIONS.
PERFORMING PRE-CONSTRUCTION AND PERIODIC SITE VISITS THROUGHOUT
CONSTRUCTION. THE GEOTECHNICAL ENGINEER IS RESPONSIBLE FOR
OF EXCAVATIONS AND SOIL/GROUNDWATER CONDITIONS THROUGHOUT
HIRE A PROFESSIONAL GEOTECHNICAL ENGINEER TO PROVIDE INSPECTION8.
ROOF UNTIL THE CONCRETE HAS ATTAINED FULL DESIGN (28 DAY COMPRESSIVE) STRENGTH.
UNBALANCED SOIL LOADS AGAINST THE STRUCTURE. DO NOT PLACE BACKFILL AGAINST WALLS AND
ALL EXCAVATIONS SHALL BE PROPERLY BACKFILLED. BACKFILL EVENLY ON ALL SIDES TO PREVENT 2.
APPLIES CONTINUOUSLY AND IS NOT LIMITED TO NORMAL WORKING HOURS.
THE PROPERTY OF THE CONTRACTOR. THIS CONSTRUCTION STABILITY REQUIREMENT
APPLIED THEY SHALL BE REMOVED AS CONDITIONS PERMIT, AND SHALL REMAIN
NECESSARY DURING ERECTION ARE NOT SHOWN ON STRUCTURAL DRAWINGS. IF
ANY TEMPORARY BRACING, CONNECTIONS, GUYS, OR TIE-DOWNS THAT MAY BE
SAFETY OF THE STRUCTURE AND ITS COMPONENT PARTS DURING CONSTRUCTION.
THE ERECTION PROCEDURES AND SEQUENCES REQUIRED TO ENSURE STABILITY AND
FULLY COMPLETED. HOWEVER, THE CONTRACTOR IS RESPONSIBLE TO DETERMINE
THIS STRUCTURE IS DESIGNED TO BE SELF-SUPPORTING AND STABLE AFTER IT IS2.
LOCAL REGULATIONS.
SHALL REMOVE ALL DEBRIS FROM THE OWNER’S PROPERTY AND DISCARD ACCORDING TO
ALL APPLICABLE SAFETY CODES AND REGULATIONS GOVERNING THIS WORK. THE CONTRACTOR
30 NOV 14), AND OSHA. IT IS SOLELY THE CONTRACTOR’S RESPONSIBILITY TO FOLLOW
SAFETY REQUIREMENTS IMPOSED BY THE CONTRACTING OFFICER, EM 385-1-1 (DATED
THE CONTRACTOR SHALL CONDUCT ALL OPERATIONS IN STRICT ACCORDANCE WITH THE 1.
AND COMMUNICATION (COMM) UTILITIES.
AND COMM UTILITIES) IS CRITICAL. EXTRA PRECAUTION MUST BE TAKEN TO AVOID DAMAGE TO ELECTRICAL
UTILITIES. PROPER SHORING OF UTILITIES, IF EXCAVATING AROUND UTILITIES (PARTICULARLY ELECTRIC
13. REFERENCE WPAFB SPEC 01 01 50, SECTION 1.4, AND SPEC 01 01 01, BEFORE EXCAVATION AROUND
PRIOR TO ENTERING THE TUNNELS. WPAFB FIRE DEPARTMENT (937) 257-3033.
EXITING THE TUNNELS. CONTRACTOR MUST PROVIDE THEIR LOCATION TO THE BASE FIRE DEPARTMENT
12. CONTRACTOR MUST ALERT WPAFB FIRE DEPARTMENT BY PHONE, PRIOR TO ENTERING AND UPON
A SAFETY BRIEFING PRIOR TO COMMENCEMENT OF SITE OPERATIONS. 72 HOUR NOTICE IS REQUIRED.
11. CONTRACTOR SAFETY POC MUST CONTACT WPAFB CE PROJECT MANAGER WHO WILL COORDINATE
OSHA REQUIREMENTS, AS WELL AS, EM 385-1-1.
10. ALL TUNNELS ARE PERMIT-REQUIRED CONFINED SPACE. CONTRACTOR MUST FOLLOW AFOSH AND
FREE OF RUST, SCALE, ETC., AND SHALL BE HOT-DIPPED GALVANIZED
STRUCTURAL STEEL SHALL BE NEW UNLESS NOTED OTHERWISE, AND SHALL BE MADE 3.
OTHER CONNECTION ELEMENTS SHALL BE HOT-DIPPED GALVANIZED.
AN ASTM F436 HARDENED STEEL WASHER UNDER THE TURNED ELEMENT. ALL BOLTS AND
NOTED OTHERWISE. BOLTS SHALL BE INSTALLED WITH ASTM A563 NUTS, AND SHALL HAVE
" DIAMETER MINIMUM UNLESS4
3ALL BOLTS SHALL CONFORM TO ASTM A325X AND SHALL BE 4.
ALL WELDS SHALL BE TOUCHED UP WITH GALVANIZIZING REPAIR PAINT.7.
OFFICER PRIOR TO CONCRETE PLACEMENT.
7. ENSURE THAT FOOTING SUBGRADES HAVE BEEN INSPECTED AND APPROVED BY THE CONTRACTING
TO KEEP SOIL MATERIALS SUFFICIENTLY DRY.
DURING CONSTRUCTION. COMPLETELY DRAIN CONSTRUCTION SITE DURING PERIODS OF CONSTRUCTION
6. PROVIDE FOR THE COLLECTION AND DISPOSAL OF SURFACE AND SUBSURFACE WATER ENCOUNTERED
DO NOT EXCAVATE TO FINAL GRADE LEVEL UNTIL JUST BEFORE CONCRETE IS TO BE PLACED.
5. DO NOT DISTURB THE BOTTOM OF THE EXCAVATION WHEN CONCRETE IS THE BE PLACED AND
PROVIDE PROPER DRAINAGE AT ALL TIMES.
CONSTRUCTION, PERFORM EXCAVATION AND FILL IN A MANNER AND SEQUENCE THAT WILL
PROJECT TO THE LINES, GRADES, AND ELEVATIONS INDICATED AND AS SPECIFIED. DURING
4. PERFORM EXCAVATION OF EVERY TYPE OF MATERIAL ENCOUNTERED WITHIN THE LIMITS OF THE
BURIED UTILITY LINES. WARNING AND IDENTIFICATION SHALL READ, "CAUTION, BURIED LINE BELOW"
3. CONTRACTOR SHALL USE WARNING TAPE SPECIFICALLY FOR WARNING AND IDENTIFICATION OF
3" OR LARGER IN ANY DIMENSION.
2. INITIAL BACKILL CONSISTS OF SELECT GRANULAR MATERIAL OR MATERIALS FREE FROM ROCKS
WHEN ANY CONTAMINATED MATERIALS ARE ENCOUNTERED DURING EXCAVATION.
ROOTS AND OTHER ORGANIC MATTER OR FROZEN MATERIAL. NOTIFY CONTRACTING OFFICER
FILLS, TRASH, REFUSE, BACKFILLS FROM PREVIOUS CONSTRUCTION, AND MATERIAL CONTAINING
(TYP.) UNSATISFACTORY MATERIALS TO NOT USE AS FILL MATERIALS SHALL INCLUDE MAN-MADE 1.
BY UFC 3-301-01
2012 INTERNATIONAL BUILDING CODE AND REFERENCED CODES AS MODIFIED
S-101
REPAIR LOCATION PLAN
BULL HEAD TUNNEL
S-101
REPAIR LOCATION PLAN
BULL HEAD STEAM TUNNEL NORTH
TUNNEL CONCRETE REPLACEMENT
(STANCHION)
LOCATION
SURFACE
TUNNEL
(APPROXIMATE)
LENGTH
30’-0"
1/S-301 EXTERNAL WATERPROOFING APPLICATION DETAIL.
ON S-101 FOR APPLICATION LOCATIONS AND DETAIL
2. FOR EXTERNAL WATERPROOFING APPLICATION, SEE CHART
ALONG TUNNEL CEILING & WALLS.
1. SEE DETAIL 2/S-303 FOR REPLACEMENT OF CONCRETE
NOTES:
EXISTING STANCHION ASSESSMENT
LOCATION
STANCHION
(EXISTING)
REPAIR
CLEAN
(w/ NEW)
REPLACEMENT
(STANCHION)
LOCATIONS
(ALONG TUNNEL LENGTH)
UTILITIES AFFECTED BY EXCAVATIONS
UTILITY TYPE (LINES)
BETWEEN 28 & 36
DWGS.
5. UTILITIES HAVE BEEN IDENTIFITED PER WPFAB EXISTING UTILITY
ELECTRICAL AND COMMUNICATION (COMM) UTILITIES.
EXTRA PRECAUTION MUST BE TAKEN TO AVOID DAMAGE TO
(PARTICULARLY ELECTRIC AND COMM UTILITIES) IS CRITICAL.
SHORING OF UTILITIES, IF EXCAVATING AROUND UTILITIES
01 01 01, BEFORE EXCAVATION AROUND UTILITIES. PROPER
4. REFERENCE WPAFB SPEC 01 01 50, SECTION 1.4, AND SPEC
EXCAVATION AND REPAIR MEANS AND METHODS.
CONTRACTING OFFICER’S REPRESENTATIVE TO REVIEW PLANNED
C. A "PRE-DIG" CONFERENCE SHALL BE CONDUCTED WITH THE
WITH FORM AF103.
B. THE GOVT. WILL CONDUCT A SURVEY OF UTILITIES COMPLETE
AREAS OF EXCAVATION AND SUBMIT FINDINGS TO THE GOVT.
A. THE CONTRACTOR SHALL CONDUCT A UTILITY SURVEY IN ALL
COMMENCEMENT OF EXCAVATION:
3. THE FOLLOWING ITEMS SHALL BE COMPLETED PRIOR TO
UTILITIES TO PREVENT DAMAGE AND DISRUPTION TO SERVICE
2. WHERE NECESSARY, THE CONTRACTOR SHALL HAND DIG AROUND
AS WELL.
NOTED, HOWEVER UTILITIES MAY BE PRESENT IN OTHER AREAS
FOR TUNNEL REPAIRS. AREAS OF SIGNIFICANT CONGESTION ARE
1. EXISTING UTILITIES MAY BE PRESENT IN AREAS OF EXCAVATION
NOTES:
BETWEEN 74 & 76
APPLICATION LOCATIONS
EXTERNAL/INTERNAL WATERPROOFING
WATERPROOFING
EXTERNAL
-BETWEEN 28 & 36
APPLICATION.
2. SEE DETAIL 1/S-301 FOR EXTERNAL WATERPROOFING
WATERPROOFING APPLICATION.
REQUIRED. SEE DETAIL 2/S-301 FOR INTERNAL
ADDITIONAL INTERNAL WATERPROOFING APPLICATIONS ARE
1. LOCATIONS DEPICTED IN CHART ARE LOCATIONS WHERE
NOTES:
(STANCHION)
LOCATIONS -BETWEEN 18 & 19
WATERPROOFING
INTERNAL
52, 53, 54, 55
48, 49, 50, 51, 43, 44, 45, 46, 39, 40, 41, 42, 34, 36, 37, 38, 30, 31, 32, 33, 22, 24, 28, 29, 18, 19, 20, 21, 14, 15, 16, 17, 3, 6, 8, 10, 26, 27, 35, 47
12, 13, 23, 25, 4, 5, 7, 9, 11, SCALE: N.T.S.
STORM WATER
ELECTRIC MANHOLE, ELECTRIC SWITCH,
CEILING/WALL
PER WPAFB PROCEDURES/SPECIFICATIONS.
PROFILES REMOVED. ANY SEEDING RESTORATIONS SHALL BE
CONCRETE (SIDEWALK, CURBS) TO MATCH THE EXISTING
G. CONTRACTOR SHALL REPLACE ANY DEMOLISHED ASPHALT AND
REQUIREMENTS.
GENERAL NOTES SECTION, "EARTHWORK", FOR ADDITIONAL
SHALE ROCK PRESENCE FOR ALL AREAS OF EXCAVATION. SEE
F. CONTRACTOR SHALL INCLUDE EXCAVATION COSTS FOR 20%
FOR ADDITIONAL REQUIREMENTS PER WPAFB.
E. CONTRACTOR SHALL REFER TO GENERAL NOTES SHEET, S-001,
c. REPAIR METHODS
b. REPAIR MATERIALS
a. CONCRETE REMOVAL METHODS
SCHEDULE OF WORK SHALL FOLLOW INFORMATION IN TABLES:
PERFORMED DURING TUNNEL REPAIR. THE SEQUENCE AND
WORK, THE SEQUENCING AND SCHEDULING OF WORK TO BE
ALL MATERIALS (PROPERTIES) TO BE USED FOR TUNNEL REPAIR
FOR CIVIL WORKS", SECTION 1.4 "SYSTEM DESCRIPTION", FOR
D. REFER TO SPECIFICATION 03 01 32 "CONCRETE REHABILITATION
TO ANY DEMOLITION/NEW WORK THROUGHOUT THE TUNNEL.
C. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR
TUNNEL.
B. INDICATES EVERY 5th STANCHION ALONG LENGTH OF
A. EXTENTS OF BULL HEAD TUNNEL REPAIR ASSESSMENT.
SHEET GENERAL NOTES:
MATERIALS PRESENT.
HAVE ASBESTOS CONTAINING
HALF ROUND TUNNELS THAT MAY
THERE ARE CERTAIN ADJOINING
IN FEW AREAS OF THE TUNNELS,
BEEN ACCOMPLISHED. HOWEVER,
SURVEY/REMEDIATION HAS
IN PROJECT, ASBESTOS
IN MAIN TUNNELS IDENTIFIED
NOTE TO CONTRACTOR:
LOCATION.
AND FIXTURES IN ORIGINAL
3. RE-SECURE THE CONDUIT
REQUIRED FOR WORK.
AND LIGHTING FIXTURES AS
2. REMOVE CONDUIT CLAMPS
TO MAINTAIN CIRCUITRY.
THE CONDUIT AND FIXTURES
1. TEMPORARILY SUPPORT
(NOTE TO CONTRACTOR):
CONDUIT INTERFERENCE
EXISTING ELECTRICAL
-BETWEEN 23 & 24
PER SHEET S-301.
THROUGH WALL w/ APPLICABLE CONCRETE REPAIR METHODS
OF PIPES THROUGH TUNNEL WALLS. PATCH PENETRATION
SEE S-101F FOR DEPICTION AND LOCATION OF PENETRATION
WALL AND DISPOSE OF PER WPAFB DISPOSAL PROCEDURES.
C. DEMOLISH ABANDONED PIPES PENETRATING THRU TUNNEL
WATERPROOFING (BEYOND TYPICAL 1’-0" BASE APPLICATION).
ON S-101 FOR LOCATIONS OF REQUIRED INTERNAL
3C/S-301 FOR APPLICABLE REPAIR METHOD). SEE CHART
REINFORCING BARS WITH CORROSION (SEE DETAILS 3B &
SPALLING CONCRETE AND CLEANING/REPLACING EXISTING
WATER INTRUSION (SEE DETAIL 3A/S-301), PATCH FOR
2/S-301), INJECTION OF CRACKS ALONG CONCRETE FOR
WATERPROOFING THE FACE OF THE TUNNEL (SEE DETAIL
AND SLAB REQUIRED. REPAIRS SHALL INCLUDE INTERNAL
B. CONCRETE REPAIR ALONG THE TUNNEL WALLS, CEILING,
INFORMATION.
SEE SPECIFICATION 23 05 15 FOR APPLICABLE PIPE ROLLER
PIPE ROLLER SUPPORT AT THE NECESSARY PIPE LOCATIONS.
STANCHIONS. NEW STANCHIONS SHALL REQUIRE NEW
REQUIRED ACTION BASED ON ASSESSMENT OF EXISTING
ON S-101 INDICATING STANCHIONS WITHIN TUNNEL AND
REQUIRED. SEE "EXISTING STANCHON ASSESSMENT" CHART
A. EXISTING PIPE STANCHION REPAIR OR FULL REPLACEMENT
DRAWING NOTES:
REMAIN.
EXISTING PIPE ROLLER SUPPORTS AT THESE STANCHIONS SHALL
REPAIR ONLY, SHALL NOT NEED NEW PIPE ROLLER SUPPORTS.
3. EXISTING STANCHIONS (WITHIN BULL HEAD STEAM TUNNEL) REQUIRING
EXISTING STANCHIONS THAT SHALL REMAIN.
2. SEE SHEET S-302 FOR REPAIRS METHOD REQUIREMENTS TO
EXISTING STANCHION) DETAIL.
1. SEE DETAIL 1/S-303 FOR NEW STANCHION (REPLACEMENT OF
NOTES:
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
OF
PROJECT NUMBER ZHTV 090018
SUBMITTAL - 100% GOVT. SUBMITTAL
SPR SPR MSS JUNE 2015
1 555 10 15 20 25 30 35 40 45 50
A A A A A
B
A A
B
A A A
B
C
B B
A
B
& PARKING
ROADWAY
& PARKING
ROADWAY
& PARKING
ROADWAY
SIDEWALKSIDEWALK
1386670079C Sticky Note Incorrect stanchion locations for tunnel replacement. See utilities affected section for correct locations. It will be obvious because there is no such stanchions for this plan.
S-101A
BULL HEAD TUNNEL PHOTOS/DESCRIPTIONS
EXISTING CONDITION
101A-a
REPAIR PROCEDURE REPAIR PROCEDUREEXISTING CONDITION
101A-b
REPAIR PROCEDUREEXISTING CONDITION
101A-c
101A-d
EXISTING CONDITION REPAIR PROCEDURE
101A-e
EXISTING CONDITION REPAIR PROCEDURE
101A-f
EXISTING CONDITION REPAIR PROCEDURE
101A-g
EXISTING CONDITION REPAIR PROCEDURE
101A-h
EXISTING CONDITION REPAIR PROCEDURE
& CEILING SLAB).
VERTICAL LEGS SPANNING BETWEEN BASE
STANCHION 3. (TYPICAL STANCHION HAS
BETWEEN BASE & CEILING SLAB AT
VERTICAL SUPPORT LEGS NOT CONTINUOUS
GATHERED AROUND BASE OF STANCHION).
STANCHION 3. (MISCELLANEOUS. DEBRIS
CORROSION AND LOSE OF STEEL SECTION AT
HORIZONTAL PIPE SUPPORT CHANNEL HAVE
BASE OF VERTICAL SUPPORT LEG & BOTTOM
ALONG CRACKS & JOINT IN CEILING
STANCHION 6. WATER INTRUSION EVIDENT
CORROSION, & LOSS OF STEEL SECTION AT
SUPPORT LEGS HAVE CALCIUM BUILDUP,
TOP HORIZONTAL ROD SUPPORT & VERTICAL
6.
& LOSS OF STEEL SECTION AT STANCHION
CONNECTION CHANNEL HAVE CORROSION
BASE OF VERTICAL SUPPORT LEG &
STANCHION 10.
& LOSS OF STEEL SECTION AT
CONNECTION ANGLE HAVE CORROSION
BASE OF VERTICAL SUPPORT LEG &
STANCHION 18.
& LOSS OF STEEL SECTION AT
CONNECTION ANGLE HAVE CORROSION
BASE OF VERTICAL SUPPORT LEG &
STANCHION 19.
& LOSS OF STEEL SECTION AT
CONNECTION ANGLE HAVE CORROSION
BASE OF VERTICAL SUPPORT LEG &
CONNECTED AT ONE END AT STANCHION 24.
SUPPORT LEGS DEFLECTING AND NOT
HORIZONTAL BRACING ANGLE BETWEEN
CORROSION & LOSS OF STEEL SECTION.
BASE OF VERTICAL SUPPORT LEGS HAVE
DETAIL
SEE 1/S-303 FOR REPLACEMENT OF STANCHION
CLEAN AREA ADJACENT TO EXISTING STANCHION.
DETAIL
SEE 1/S-303 FOR REPLACEMENT OF STANCHION
CLEAN AREA ADJACENT TO EXISTING STANCHION.
WATERPROOFING APPLICATION.
REPAIR, AND 2/S-301 FOR INTERNAL
DETAIL, 3A/S-301 FOR CONCRETE CRACK INJECTION
SEE 1/S-303 FOR REPLACEMENT OF STANCHION
CLEAN AREA ADJACENT TO EXISTING STANCHION.
DETAIL
SEE 1/S-303 FOR REPLACEMENT OF STANCHION
CLEAN AREA ADJACENT TO EXISTING STANCHION.
DETAIL
SEE 1/S-303 FOR REPLACEMENT OF STANCHION
CLEAN AREA ADJACENT TO EXISTING STANCHION.
DETAIL
SEE 1/S-303 FOR REPLACEMENT OF STANCHION
CLEAN AREA ADJACENT TO EXISTING STANCHION.
DETAIL
SEE 1/S-303 FOR REPLACEMENT OF STANCHION
CLEAN AREA ADJACENT TO EXISTING STANCHION.
DETAIL
SEE 1/S-303 FOR REPLACEMENT OF STANCHION
CLEAN AREA ADJACENT TO EXISTING STANCHION.
OF THE STANCHION.
THE BASE OF THE WALL & AROUND THE BASE
2. CLEAN ALL LOOSE PIECES OF DEBRIS FROM
COATING.
APPLICATION OF A CORROSION RESISTANT
STEEL SHALL BE CLEANED TO ALLOW FOR
STANCHIONS (TO REMAIN) SHALL BE REMOVED.
1. ALL CORROSION PRESENT ON EXISTING STEEL
NOTES:
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
OF
PROJECT NUMBER ZHTV 090018
SUBMITTAL - 100% GOVT. SUBMITTAL
SPR SPR MSS JUNE 2015
File details come from the government source that posted it. Updated .