Attch__21-Drawings_S-303.pdf

PDF 176 KB Posted

Attached to
Repair-Replace Steam Pipe Stanchions Federal contract opportunity
Solicitation number
FA8601-15-R-0030
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

Attch 21-Drawings S-303

View the file

Other files for this federal contract opportunity

Other files attached to Repair-Replace Steam Pipe Stanchions, newest first.
File Type Posted
Attch_42_Addend_03_Colored_S-102A-updated.pdf PDF
Attch_43_Addend_03_Colored_S-102B-updated.pdf PDF
Attch_40_Addend_03_Colored_S-101G.pdf PDF
Attch_50_Addend_03_Colored_S-103A.pdf PDF
Attch_51_Addend_03_Colored_S-103B.pdf PDF
Attch_53_Addend_03_Colored_S-104A.pdf PDF
Attch_35_Addend_03_Colored_S-101B.pdf PDF
Attch_60_Addend_03_Colored_S-105C.pdf PDF
Attch_34_Addend_03_Colored_S-101A.pdf PDF
Attch_64_Addend_03_Colored_S-105G.pdf PDF
Attch_44_Addend_03_Colored_S-102C.pdf PDF
Attch_59_Addend_03_Colored_S-105B.pdf PDF
Attch_46_Addend_03_Colored_S-102E.pdf PDF
Attch_36_Addend_03_Colored_S-101C.pdf PDF
Attch_43_Addend_03_Colored_S-102B.pdf PDF
Attch_42_Addend_03_Colored_S-102A.pdf PDF
Attch_58_Addend_03_Colored_S-105A.pdf PDF
Attch_38_Addend_03_Colored_S-101E.pdf PDF
Attch_57_Addend_03_Colored_S-104E.pdf PDF
Attch_47_Addend_03_Colored_S-102F.pdf PDF
Attch_49_Addend_03_Colored_S-102H.pdf PDF
Attch_52_Addend_03_Colored_S-103C.pdf PDF
Attch_62_Addend_03_Colored_S-105E.pdf PDF
Attch_33_Addend_03_Colored_G-001.pdf PDF
Attch_54_Addend_03_Colored_S-104B.pdf PDF
Attch_63Addend_03_Colored_S-105F.pdf PDF
Attch_56_Addend_03_Colored_S-104D.pdf PDF
RFI_0002.pdf PDF
FFPAddendum(w_Modifications).pdf PDF
FA8601-15-R-0030_Addendum_Number_02.pdf PDF
Attch_26-Addend_01_Section_01_01_00.pdf PDF
Attch__9-Drawings_S-102E_and_S-102F.pdf PDF
Attch__10-Drawings_S-102G_and_S-102H.pdf PDF
Attch__3-Drawings_S-101B_and_S-101C.pdf PDF
Attch_27-Addend_01_Section_01_02_50.pdf PDF
Attch__7-Drawings_S-102A_and_S-102B.pdf PDF
Attch__11-Drawings_S-103_and_S-103A.pdf PDF
Attch__14-Drawings_S-104B_and_S-104C.pdf PDF
Attch_1-Specifications.pdf PDF
Attch_8-Drawings_S-102C_and_S-102D.pdf PDF
Attch__5-Drawings_S-101F_and_S-101G.pdf PDF
Attch_28-Addend_01_Cover_Page.pdf PDF
Attch_25-_Addend_01_DWG_S-301.pdf PDF
Attch_24-_Addend_01_DWG_S-101.pdf PDF
Attch__15-Drawings_S-104D_and_S-104E.pdf PDF
Attch__18-Drawings_S-105D_and_S-105E.pdf PDF
Attch__17-Drawings_S-105B_and_S-105C.pdf PDF
Attch_19-Drawings_S-105F_and_S-105G.pdf PDF
Attch_23-Addendum_Number_01.pdf PDF
Attch__12-Drawings_S-103B_and_S-103C.pdf PDF
Show all 50

Repair-Replace Steam Pipe Stanchions has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S-303

STANCHION REPLACEMENT DETAILS

CONCRETE TUNNEL ELEMENT & STEAM

S-303

2A

SCALE: 3/4" = 1’-0"

REPLACEMENT OF CONCRETE CEILING DETAIL

S-303

SCALE: 3/4" = 1’-0"

REPLACEMENT OF STEEL STANCHION DETAIL

STANCHION.

CLEAR OF DEBIRS AND MOISTURE PRIOR TO INSTALL OF NEW

6. AREA AROUND NEW STANCHION LOCATION SHALL BE FREE AND

UP ANY WELDS.

SHALL BE USED AFTER INSTALL OF STANCHION AND TO TOUCH

GALVANIZED AND TOUCH UP PAINT FOR GALVANIZED STEEL

5. ALL STEEL USED FOR NEW STANCHIONS SHALL BE HOT-DIPPED

REQUIRE A FULL REPLACEMENT.

AND S-105) FOR STANCHIONS WITHIN TUNNELS THAT SHALL

4. SEE LOCATION PLAN SHEETS (S-101, S-102, S-103, S-104,

(ROLLERS NOT SHOWN FOR CLARITY).

SPECIFICATION 23 05 15 FOR APPLICABLE ROLLER CRITERIA

PRIOR TO PLACEMENT OF PIPE ROLLER. REFER TO

STEAM LINES. CONTRACTOR SHALL VERIFY PIPE SIZES

HORIZONTAL SUPPORT FOR PROPER PIPE BEARING OF

3. NEW PIPE ROLLERS SHALL BE PROVIDED @ EACH NEW

STANCHION SHALL BE DEMOLISHED.

IS SET AND PIPES ARE FULLY SUPPORTED, THE EXISTING

REMOVAL OF EXISTING STANCHION. AFTER NEW STANCHION

ADJACENT TO EXISTING STANCHION PRIOR TO ANY

2. CONTRACTOR SHALL INSTALL NEW STANCHION DIRECTLY

SHALL BE SIMILAR TO EXISTING STANCHION CONDITIONS.

SUPPORT LEGS AND HORIZONTAL SUPPORT ELEVATIONS,

1. DISTANCE (WIDTH) BETWEEN NEW STANCHION VERTICAL

NOTES:

S-303

2B

SCALE: 3/4" = 1’-0"

CEILING AND WALL DETAIL

REPLACEMENT OF CONCRETE

COORDINATOR ENGINEERING CHIEF

DATE REVISION BYNO. DATE NO. REVISION BY

C I

V

IL

ENGI

N

E E

R

US AF

WRIGHT-PATTERSON AIR FORCE BASE

88TH ABW

OF

DESIGN CHIEF

DATEDRAWNDESIGNED CHECKED

RPR/RPL STEAM STANCHIONS

PROJECT NUMBER ZHTV 090018

SUBMITTAL - 100% GOVT. SUBMITTAL

SPR SPR MSS JUNE 2015

SLAB.

CONC. WALLS & TOP

NEW CAST IN PLACE

SHEET S-301, AROUND

WATERPROOFING, SEE

PROVIDE EXTERNAL

DIFFERS FROM ASSUMED WIDTH)

w/ EOR IF TRUE WIDTH

DURING EXCAVATION. COORDINATE

SHALL FIELD VERIFY WIDTH

REPLACEMENT DETAIL.

SYSTEM THAT SHALL REQUIRE

CEILINGS AND WALLS OF TUNNEL

EXTENTS OF EXISTING CONCRETE

SEE LOCATION PLANS FOR

NOTE:

TO FACE OF WALL

EA. FACE, PARALLEL

#8 @ 14"oc (MAX), TO REMAIN.

TUNNEL WALL

EXIST. CONCRETE

WALLS TO REMAIN

WITHIN CONCRETE

EXIST. REINF. BARS

EA. SIDE OF WALL)

EXIST. BAR (TYP.

w/o DAMAGE TO

DEMO. AROUND BAR

CONTRACTOR SHALL

WALL TO REMAIN.

BAR FROM TOP OF

EXIST. REINF. BENT

C L

R

(MAX)

BAR @ 5"oc

#8 BAR BENT

BE STRAIGHT.

(MAX.). BAR SHALL

#8 BAR @ 10"oc

6"

(V.I.F.)

10’-5"

6"

C L

R

SLAB

TUNNEL CEILING

PAVEMENT ATOP

SIDEWALK OR

SEE 1/S-301 FOR

@ 10"oc (MAX.).

#8 BAR BENT BAR

(V.I.F.)

5’-4"

TO FABRICATION OF REINF. BARS.

VERIFY DIMENSION IN FIELD PRIOR

OF CONCRETE @ TUNNEL WALL,

INSIDE FACE OF INSIDE FACE

12" 12"

SLAB.

CONC. WALLS & TOP

NEW CAST IN PLACE

SHEET S-301, AROUND

WATERPROOFING, SEE

PROVIDE EXTERNAL

DIFFERS FROM ASSUMED WIDTH)

w/ EOR IF TRUE WIDTH

DURING EXCAVATION. COORDINATE

SHALL FIELD VERIFY WIDTH

REPLACEMENT DETAIL.

SYSTEM THAT SHALL REQUIRE

CEILINGS AND WALLS OF TUNNEL

EXTENTS OF EXISTING CONCRETE

SEE LOCATION PLANS FOR

NOTE:

TO FACE OF WALL

EA. FACE, PARALLEL

#8 @ 14"oc (MAX), C L

R

C

L

SLAB

TUNNEL CEILING

PAVEMENT ATOP

SIDEWALK OR

SEE 1/S-301 FOR

TO FABRICATION OF REINF. BARS.

VERIFY DIMENSION IN FIELD PRIOR

OF CONCRETE @ TUNNEL WALL,

INSIDE FACE OF INSIDE FACE

EA. SIDE OF WALL)

EXIST. BAR (TYP.

BAR w/o DAMAGE TO

SHALL DEMO. AROUND

REMAIN. CONTRACTOR

FOUNDATOIN TO

BAR FROM TUNNEL

EXIST. REINF. BENT

CLR.

1�"

CLR.

2"

CLR.

1�"

CLR.

2"

OF TUNNEL TO REMAIN.

EXIST. BASE SLAB

TUNNEL

EA. SIDE OF

CONCRETE WALL,

NEW 10" THK.

S P

L

IC

E

T

Y P

T E

N S

IO

N

L A

P

SPLICE (TYP.)

TENSION LAP

REINF. BARS.

OF WALL & CEILING

MATCH SIZE & SPA.

CORNER BARS TO

(MIN.)

6"

M

IN

WALL REINF.

& SPA. TO MATCH

BENT BAR, SIZE

TYP. EA. WALL)

FACE (MAX.,

7"oc, EA.

#8 BAR @

TYP. EA. WALL)

FACE (MAX.,

14"oc, EA.

#8 BAR @

EA. FACE

7"oc (MAX), #8 BAR @

SLAB OF TUNNEL

TOP OF BASE

P R

T O

E

W

S

E

L

F A

B R

IC

A T

IO

N

C O

O R

D

IN

A w

X

IS

T

IN

G

S

A N

C H

ALONG TUNNEL

CEILING SLAB

UNDERSIDE OF

TUNNEL WALL

INSIDE FACE OF

EXIST. STANCHION)

SIMILAR TO ADJACENT

SUPPORT. (SHALL BE

VERTICAL STANCHION

CONC. WALL TO

INTERIOR FACE OF

DISTANCE FROM

S

T E

S

T E

S

T E

FABRICATION)

PRIOR TO NEW STEEL

w/ EXISTING STANCHION

IN FIELD AND COORDINATE

CEILING SLAB (TYP.)

& UNDERSIDE OF

BETWEEN BASE SLAB

SUPPORT LEG. SPAN

CHANNEL STANCHION

NEW C8x11.5 VERT.

EA. SIDE OF C6x)

C8x VERT. (TYP.

C6x HORIZ. &

BETWEEN NEW

P A

D

T Y

P

G R

O U

C x

B

O T

P A

D

T Y

P

G R

O U

C x

B

O T

CONN.)

(TYP. EA.

& C8x VERT.

NEW L4x4

BETWEEN

(3) SIDES,

OF CEILING SLAB (TYP.)

BASE SLAB & UNDERSIDE

LEG. SPAN BETWEEN

STANCHION SUPPORT

VERT. CHANNEL

NEW C8x11.5 (GALV.)

NEW ROLLERS & PIPING.

PROPER BRG. BETWEEN

EXIST. STEAM PIPES FOR

NEW HORIZ. C6x BELOW

SUPPORTS. POSITION

BETWEEN VERT.

HORIZ. SUPPORT

NEW C6x10.5 (GALV.)

BELOW L4x4

GROUT PAD

NON-METALLIC

1" NON-SHRINK,

CONC. BASE SLAB (TYP.)

3" (MIN.) INTO EXIST.

ANCHOR (SS). EMBED.

VERT. SUPPORT LEGS

(GALV.) @ BASE OF

NEW L4x4x�x6" LG.

REPLACEMENT DETAIL.

STANCHIONS THAT REQUIRE

LOCATION PLANS FOR LIST OF

THE STEEL HAS OCCURRED. SEE

25% LOSS OF SECTION WITHIN

IS EVIDENT AND GREATER THAN

AT LOCATIONS WHERE CORROSION

REPLACEMENT DETAIL IS REQUIRED

NOTE: