Attch_24-_Addend_01_DWG_S-101.pdf
PDF 203 KB Posted
- Attached to
- Repair-Replace Steam Pipe Stanchions Federal contract opportunity
- Solicitation number
- FA8601-15-R-0030
About this file
Attch 24- Addend 01 DWG S-101
View the file
Other files for this federal contract opportunity
Show all 50
Repair-Replace Steam Pipe Stanchions has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S-101
REPAIR LOCATION PLAN
BULL HEAD TUNNEL
S-101
REPAIR LOCATION PLAN
BULL HEAD STEAM TUNNEL NORTH
TUNNEL CONCRETE REPLACEMENT
(STANCHION)
LOCATION
SURFACE
TUNNEL
(APPROXIMATE)
LENGTH
30’-0"
1/S-301 EXTERNAL WATERPROOFING APPLICATION DETAIL.
ON S-101 FOR APPLICATION LOCATIONS AND DETAIL
2. FOR EXTERNAL WATERPROOFING APPLICATION, SEE CHART
ALONG TUNNEL CEILING & WALLS.
1. SEE DETAIL 2/S-303 FOR REPLACEMENT OF CONCRETE
NOTES:
EXISTING STANCHION ASSESSMENT
LOCATION
STANCHION
(EXISTING)
REPAIR
CLEAN
(w/ NEW)
REPLACEMENT
(STANCHION)
LOCATIONS
(ALONG TUNNEL LENGTH)
UTILITIES AFFECTED BY EXCAVATIONS
UTILITY TYPE (LINES)
BETWEEN 28 & 36
DWGS.
5. UTILITIES HAVE BEEN IDENTIFITED PER WPFAB EXISTING UTILITY
ELECTRICAL AND COMMUNICATION (COMM) UTILITIES.
EXTRA PRECAUTION MUST BE TAKEN TO AVOID DAMAGE TO
(PARTICULARLY ELECTRIC AND COMM UTILITIES) IS CRITICAL.
SHORING OF UTILITIES, IF EXCAVATING AROUND UTILITIES
01 01 01, BEFORE EXCAVATION AROUND UTILITIES. PROPER
4. REFERENCE WPAFB SPEC 01 01 50, SECTION 1.4, AND SPEC
EXCAVATION AND REPAIR MEANS AND METHODS.
CONTRACTING OFFICER’S REPRESENTATIVE TO REVIEW PLANNED
C. A "PRE-DIG" CONFERENCE SHALL BE CONDUCTED WITH THE
WITH FORM AF103.
B. THE GOVT. WILL CONDUCT A SURVEY OF UTILITIES COMPLETE
AREAS OF EXCAVATION AND SUBMIT FINDINGS TO THE GOVT.
A. THE CONTRACTOR SHALL CONDUCT A UTILITY SURVEY IN ALL
COMMENCEMENT OF EXCAVATION:
3. THE FOLLOWING ITEMS SHALL BE COMPLETED PRIOR TO
UTILITIES TO PREVENT DAMAGE AND DISRUPTION TO SERVICE
2. WHERE NECESSARY, THE CONTRACTOR SHALL HAND DIG AROUND
AS WELL.
NOTED, HOWEVER UTILITIES MAY BE PRESENT IN OTHER AREAS
FOR TUNNEL REPAIRS. AREAS OF SIGNIFICANT CONGESTION ARE
1. EXISTING UTILITIES MAY BE PRESENT IN AREAS OF EXCAVATION
NOTES:
BETWEEN 28 & 36
APPLICATION LOCATIONS
EXTERNAL/INTERNAL WATERPROOFING
WATERPROOFING
EXTERNAL
-BETWEEN 28 & 36
APPLICATION.
2. SEE DETAIL 1/S-301 FOR EXTERNAL WATERPROOFING
WATERPROOFING APPLICATION.
REQUIRED. SEE DETAIL 2/S-301 FOR INTERNAL
ADDITIONAL INTERNAL WATERPROOFING APPLICATIONS ARE
1. LOCATIONS DEPICTED IN CHART ARE LOCATIONS WHERE
NOTES:
(STANCHION)
LOCATIONS -BETWEEN 18 & 19
WATERPROOFING
INTERNAL
52, 53, 54, 55
48, 49, 50, 51, 43, 44, 45, 46, 39, 40, 41, 42, 34, 36, 37, 38, 30, 31, 32, 33, 22, 24, 28, 29, 18, 19, 20, 21, 14, 15, 16, 17, 3, 6, 8, 10, 26, 27, 35, 47
12, 13, 23, 25, 4, 5, 7, 9, 11, SCALE: N.T.S.
STORM WATER
ELECTRIC MANHOLE, ELECTRIC SWITCH,
CEILING/WALL
PER WPAFB PROCEDURES/SPECIFICATIONS.
PROFILES REMOVED. ANY SEEDING RESTORATIONS SHALL BE
CONCRETE (SIDEWALK, CURBS) TO MATCH THE EXISTING
G. CONTRACTOR SHALL REPLACE ANY DEMOLISHED ASPHALT AND
REQUIREMENTS.
GENERAL NOTES SECTION, "EARTHWORK", FOR ADDITIONAL
SHALE ROCK PRESENCE FOR ALL AREAS OF EXCAVATION. SEE
F. CONTRACTOR SHALL INCLUDE EXCAVATION COSTS FOR 20%
FOR ADDITIONAL REQUIREMENTS PER WPAFB.
E. CONTRACTOR SHALL REFER TO GENERAL NOTES SHEET, S-001,
c. REPAIR METHODS
b. REPAIR MATERIALS
a. CONCRETE REMOVAL METHODS
SCHEDULE OF WORK SHALL FOLLOW INFORMATION IN TABLES:
PERFORMED DURING TUNNEL REPAIR. THE SEQUENCE AND
WORK, THE SEQUENCING AND SCHEDULING OF WORK TO BE
ALL MATERIALS (PROPERTIES) TO BE USED FOR TUNNEL REPAIR
FOR CIVIL WORKS", SECTION 1.4 "SYSTEM DESCRIPTION", FOR
D. REFER TO SPECIFICATION 03 01 32 "CONCRETE REHABILITATION
TO ANY DEMOLITION/NEW WORK THROUGHOUT THE TUNNEL.
C. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR
TUNNEL.
B. INDICATES EVERY 5th STANCHION ALONG LENGTH OF
A. EXTENTS OF BULL HEAD TUNNEL REPAIR ASSESSMENT.
SHEET GENERAL NOTES:
MATERIALS PRESENT.
HAVE ASBESTOS CONTAINING
HALF ROUND TUNNELS THAT MAY
THERE ARE CERTAIN ADJOINING
IN FEW AREAS OF THE TUNNELS,
BEEN ACCOMPLISHED. HOWEVER,
SURVEY/REMEDIATION HAS
IN PROJECT, ASBESTOS
IN MAIN TUNNELS IDENTIFIED
NOTE TO CONTRACTOR:
LOCATION.
AND FIXTURES IN ORIGINAL
3. RE-SECURE THE CONDUIT
REQUIRED FOR WORK.
AND LIGHTING FIXTURES AS
2. REMOVE CONDUIT CLAMPS
TO MAINTAIN CIRCUITRY.
THE CONDUIT AND FIXTURES
1. TEMPORARILY SUPPORT
(NOTE TO CONTRACTOR):
CONDUIT INTERFERENCE
EXISTING ELECTRICAL
-BETWEEN 23 & 24
PER SHEET S-301.
THROUGH WALL w/ APPLICABLE CONCRETE REPAIR METHODS
OF PIPES THROUGH TUNNEL WALLS. PATCH PENETRATION
SEE S-101F FOR DEPICTION AND LOCATION OF PENETRATION
WALL AND DISPOSE OF PER WPAFB DISPOSAL PROCEDURES.
C. DEMOLISH ABANDONED PIPES PENETRATING THRU TUNNEL
WATERPROOFING (BEYOND TYPICAL 1’-0" BASE APPLICATION).
ON S-101 FOR LOCATIONS OF REQUIRED INTERNAL
3C/S-301 FOR APPLICABLE REPAIR METHOD). SEE CHART
REINFORCING BARS WITH CORROSION (SEE DETAILS 3B &
SPALLING CONCRETE AND CLEANING/REPLACING EXISTING
WATER INTRUSION (SEE DETAIL 3A/S-301), PATCH FOR
2/S-301), INJECTION OF CRACKS ALONG CONCRETE FOR
WATERPROOFING THE FACE OF THE TUNNEL (SEE DETAIL
AND SLAB REQUIRED. REPAIRS SHALL INCLUDE INTERNAL
B. CONCRETE REPAIR ALONG THE TUNNEL WALLS, CEILING,
INFORMATION.
SEE SPECIFICATION 23 05 15 FOR APPLICABLE PIPE ROLLER
PIPE ROLLER SUPPORT AT THE NECESSARY PIPE LOCATIONS.
STANCHIONS. NEW STANCHIONS SHALL REQUIRE NEW
REQUIRED ACTION BASED ON ASSESSMENT OF EXISTING
ON S-101 INDICATING STANCHIONS WITHIN TUNNEL AND
REQUIRED. SEE "EXISTING STANCHON ASSESSMENT" CHART
A. EXISTING PIPE STANCHION REPAIR OR FULL REPLACEMENT
DRAWING NOTES:
REMAIN.
EXISTING PIPE ROLLER SUPPORTS AT THESE STANCHIONS SHALL
REPAIR ONLY, SHALL NOT NEED NEW PIPE ROLLER SUPPORTS.
3. EXISTING STANCHIONS (WITHIN BULL HEAD STEAM TUNNEL) REQUIRING
EXISTING STANCHIONS THAT SHALL REMAIN.
2. SEE SHEET S-302 FOR REPAIRS METHOD REQUIREMENTS TO
EXISTING STANCHION) DETAIL.
1. SEE DETAIL 1/S-303 FOR NEW STANCHION (REPLACEMENT OF
NOTES:
16/22/15 CRB
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
RPR/RPL STEAM STANCHIONS
PROJECT NUMBER ZHTV 090018
SUBMITTAL - 100% GOVT. SUBMITTAL
SPR SPR MSS JUNE 2015
1 555 10 15 20 25 30 35 40 45 50
A A A A A
B
A A
B
A A A
B
C
B B
A
B
& PARKING
ROADWAY
& PARKING
ROADWAY
& PARKING
ROADWAY
SIDEWALKSIDEWALK
File details come from the government source that posted it. Updated .