Attch_8-Drawings_S-102C_and_S-102D.pdf

PDF 12 MB Posted

Attached to
Repair-Replace Steam Pipe Stanchions Federal contract opportunity
Solicitation number
FA8601-15-R-0030
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

Attch 8-Drawings S-102C and S-102D

View the file

Other files for this federal contract opportunity

Other files attached to Repair-Replace Steam Pipe Stanchions, newest first.
File Type Posted
Attch_42_Addend_03_Colored_S-102A-updated.pdf PDF
Attch_43_Addend_03_Colored_S-102B-updated.pdf PDF
Attch_59_Addend_03_Colored_S-105B.pdf PDF
Attch_46_Addend_03_Colored_S-102E.pdf PDF
Attch_36_Addend_03_Colored_S-101C.pdf PDF
Attch_43_Addend_03_Colored_S-102B.pdf PDF
Attch_42_Addend_03_Colored_S-102A.pdf PDF
Attch_58_Addend_03_Colored_S-105A.pdf PDF
Attch_38_Addend_03_Colored_S-101E.pdf PDF
Attch_57_Addend_03_Colored_S-104E.pdf PDF
Attch_47_Addend_03_Colored_S-102F.pdf PDF
Attch_49_Addend_03_Colored_S-102H.pdf PDF
Attch_52_Addend_03_Colored_S-103C.pdf PDF
Attch_40_Addend_03_Colored_S-101G.pdf PDF
Attch_50_Addend_03_Colored_S-103A.pdf PDF
Attch_51_Addend_03_Colored_S-103B.pdf PDF
Attch_53_Addend_03_Colored_S-104A.pdf PDF
Attch_35_Addend_03_Colored_S-101B.pdf PDF
Attch_60_Addend_03_Colored_S-105C.pdf PDF
Attch_34_Addend_03_Colored_S-101A.pdf PDF
Attch_64_Addend_03_Colored_S-105G.pdf PDF
Attch_44_Addend_03_Colored_S-102C.pdf PDF
Attch_62_Addend_03_Colored_S-105E.pdf PDF
Attch_33_Addend_03_Colored_G-001.pdf PDF
Attch_54_Addend_03_Colored_S-104B.pdf PDF
Attch_63Addend_03_Colored_S-105F.pdf PDF
Attch_56_Addend_03_Colored_S-104D.pdf PDF
Attch_55_Addend_03_Colored_S-104C.pdf PDF
RFI_0002.pdf PDF
FA8601-15-R-0030_Addendum_Number_02.pdf PDF
FFPAddendum(w_Modifications).pdf PDF
Attch__14-Drawings_S-104B_and_S-104C.pdf PDF
Attch_1-Specifications.pdf PDF
Attch__5-Drawings_S-101F_and_S-101G.pdf PDF
Attch_28-Addend_01_Cover_Page.pdf PDF
Attch_25-_Addend_01_DWG_S-301.pdf PDF
Attch_24-_Addend_01_DWG_S-101.pdf PDF
Attch__15-Drawings_S-104D_and_S-104E.pdf PDF
Attch_26-Addend_01_Section_01_01_00.pdf PDF
Attch__9-Drawings_S-102E_and_S-102F.pdf PDF
Attch__10-Drawings_S-102G_and_S-102H.pdf PDF
Attch__3-Drawings_S-101B_and_S-101C.pdf PDF
Attch_27-Addend_01_Section_01_02_50.pdf PDF
Attch__7-Drawings_S-102A_and_S-102B.pdf PDF
Attch__11-Drawings_S-103_and_S-103A.pdf PDF
Attch__18-Drawings_S-105D_and_S-105E.pdf PDF
Attch__17-Drawings_S-105B_and_S-105C.pdf PDF
Attch_19-Drawings_S-105F_and_S-105G.pdf PDF
Attch_23-Addendum_Number_01.pdf PDF
Attch__12-Drawings_S-103B_and_S-103C.pdf PDF
Show all 50

Repair-Replace Steam Pipe Stanchions has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S-102C

56 TUNNEL PHOTOS/DESCRIPTIONS

EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE

EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE

EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE

ACCESS AT STANCHION 76.

BASE OF TUNNEL NEAR MANHOLE

STANDING WATER PRESENT ALONG

102C-a 102C-b 102C-c

102C-f102C-e102C-d

102C-g 102C-h

SECTION AT STANCHION 66.

CORROSION & LOSS OF STEEL

HORIZONTAL SUPPORT HAVE

CONNECTION CHANNEL, & BOTTOM

BASE OF VERTICAL CHANNEL LEG,

STANCHION 68.

CONCRETE WALL & CEILING AT

SECTION. CRACKING PRESENT IN

HAS CORROSION & LOSS OF STEEL

TOP PORTION OF VERTICAL SUPPORT

SUPPORT AT STANCHION 72.

PIPE AND MISSING PIPE ROLLER

IN CORRECT LOCATION BELOW

BOTTOM HORIZONTAL SUPPORT NOT

PIPE ROLLER SUPPORT AT STANCHION 72.

CENTER HORIZONATL SUPPORT MISSING

AT STANCHION 76.

HORIZONTAL SUPPORT & PIPE ROLLER

SECTION. EXISTING PIPE MISSING

CORROSION & LOSS OF STEEL

& CONNECTION CHANNELS HAVE

BASE OF VERTICAL SUPPORT LEGS

& LOSS OF STEEL SECTION AT STANCHION 78.

LEGS & CONNECTION CHANNELS HAVE CORROSION

AROUND STANCHION. BASE OF VERTICAL SUPPORT

CONCRETE DEBRIS FROM WALL FACE PRESENT

STANDING WATER PRESENT ALONG BASE OF TUNNEL.

SUPPORT HAS ROTATION AT STANCHION 79.

LOSS OF STEEL SECTION. BOTTOM HORIZONTAL

CONNECTION CHANNELS HAVE CORROSION &

TUNNEL. BASE OF VERTICAL SUPPORT LEGS &

STANDING WATER PRESENT ALONG BASE OF

DETAIL.

SEE 1/S-303 FOR REPLACEMENT OF STANCHION

CLEAN AREA ADJACENT TO EXISTING STANCHION.

INJECTION REPAIR DETAIL.

DETAIL AND 3A/S-301 FOR CONCRETE CRACK

SEE 1/S-303 FOR REPLACEMENT OF STANCHION

CLEAN AREA ADJACENT TO EXISTING STANCHION.

DETAIL.

SEE 1/S-303 FOR REPLACEMENT OF STANCHION

CLEAN AREA ADJACENT TO EXISTING STANCHION.

DETAIL.

SEE 1/S-303 FOR REPLACEMENT OF STANCHION

CLEAN AREA ADJACENT TO EXISTING STANCHION.

EFFICIENCY.

OBSERVATION TO SUMP PUMP FOR PERFORMACE

REPLACED. WPAFB MAINTENANCE TO PROVIDE ROUTINE

SUMP PUMP FUNCTIONS PROPERLY & DOES NOT NEED

PER CONVERSATION w/ WPAFB TUNNEL MAINTENANCE, 1/S-303 FOR REPLACEMENT OF STANCHION DETAIL.

CLEAN AREA ADJACENT TO EXISTING STANCHION. SEE

REMOVE ANY STANDING WATER PRIOR TO NEW WORK.

OF THE STANCHION.

THE BASE OF THE WALL & AROUND THE BASE

2. CLEAN ALL LOOSE PIECES OF DEBRIS FROM

COATING.

APPLICATION OF A CORROSION RESISTANT

STEEL SHALL BE CLEANED TO ALLOW FOR

STANCHIONS (TO REMAIN) SHALL BE REMOVED.

1. ALL CORROSION PRESENT ON EXISTING STEEL

NOTES:

REPLACEMENT OF STANCHION DETAIL.

EXISTING STANCHION. SEE 1/S-303 FOR

NEW WORK. CLEAN AREA ADJACENT TO

REMOVE ANY STANDING WATER PRIOR TO

REPLACEMENT OF STANCHION DETAIL.

EXISTING STANCHION. SEE 1/S-303 FOR

NEW WORK. CLEAN AREA ADJACENT TO

REMOVE ANY STANDING WATER PRIOR TO

COORDINATOR ENGINEERING CHIEF

DATE REVISION BYNO. DATE NO. REVISION BY

C I

V

IL

ENGI

N

E E

R

US AF

WRIGHT-PATTERSON AIR FORCE BASE

88TH ABW

OF

DESIGN CHIEF

DATEDRAWNDESIGNED CHECKED

RPR/RPL STEAM STANCHIONS

PROJECT NUMBER ZHTV 090018

SUBMITTAL - 100% GOVT. SUBMITTAL

SPR SPR MSS JUNE 2015

S-102D

56 TUNNEL PHOTOS/DESCRIPTIONS

EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE

EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE

EXISTING CONDITION REPAIR PROCEDUREEXISTING CONDITION REPAIR PROCEDURE

102D-a 102D-b 102D-c

102D-f102D-e102D-d

102D-g 102D-h

SECTION AT STANCHION 83.

CORROSION & LOSS OF STEEL

DUCT BANK SUPPORT STEEL HAS

AT STANCHION 80.

CORROSION & LOSS OF STEEL SECTION

LEGS & CONNECTION CHANNELS HAVE

OF TUNNEL. BASE OF VERTICAL SUPPORT

STANDING WATER PRESENT ALONG BASE

AT STANCHION 81.

CORROSION & LOSS OF STEEL SECTION

LEGS & CONNECTION CHANNELS HAVE

OF TUNNEL. BASE OF VERTICAL SUPPORT

STANDING WATER PRESENT ALONG BASE

HORIZONTAL SUPPORT AT STANCHION 82.

PIPE ROLLER SUPPORT MISSING AT BOTTOM

CORROSION & LOSS OF STEEL SECTION.

& CONNECTION CHANNELS HAVE

BASE TUNNEL. VERTICAL SUPPORT LEGS

STANDING WATER PRESENT ALONG

AT STANCHION 83.

CORROSION & LOSS OF STEEL SECTION

LEGS & CONNECTION CHANNELS HAVE

OF TUNNEL. BASE OF VERTICAL SUPPORT

STANDING WATER PRESENT ALONG BASE

CONCRETE HAS SEPARATION AT STANCHION 83.

ROD CONNECTION BETWEEN DUCT BANK STEEL &

HAVE CORROSION & LOSS OF STEEL SECTION.

ROD SUPPORT, & DUCT BANK SUPPORT STEEL

TOP OF VERTICAL SUPPORT LEGS, HORIZONTAL

STANCHION 84.

PROVIDING BEARING FOR PIPE AT

HORIZONTAL SUPPORT & ROLLER NO LONGER

NOT SUPPORTED BY VERTICAL TIE RODS.

ONE SIDE OF HORIZONTAL CHANNEL SUPPORT

AT STANCHION 84.

CORROSION & LOSS OF STEEL SECTION

LEGS & CONNECTION CHANNELS HAVE

OF TUNNEL. BASE OF VERTICAL SUPPORT

STANDING WATER PRESENT ALONG BASE

1/S-303 FOR REPLACEMENT OF STANCHION DETAIL.

CLEAN AREA ADJACENT TO EXISTING STANCHION. SEE

REMOVE ANY STANDING WATER PRIOR TO NEW WORK.

1/S-303 FOR REPLACEMENT OF STANCHION DETAIL.

CLEAN AREA ADJACENT TO EXISTING STANCHION. SEE

REMOVE ANY STANDING WATER PRIOR TO NEW WORK.

1/S-303 FOR REPLACEMENT OF STANCHION DETAIL.

CLEAN AREA ADJACENT TO EXISTING STANCHION. SEE

REMOVE ANY STANDING WATER PRIOR TO NEW WORK.

1/S-303 FOR REPLACEMENT OF STANCHION DETAIL

CLEAN AREA ADJACENT TO EXISTING STANCHION. SEE

REMOVE ALL STANDING WATER PRIOR TO NEW WORK.

OF STANCHION DETAIL

STANCHION. SEE 1/S-303 FOR REPLACEMENT

STEEL. CLEAN AREA ADJACENT TO EXISTING

REMOVE ALL LOOSE PIECES OF CORRODED

FROM EXISTING DUCT BANK SUPPORT.

REMOVE ALL PIECES OF CORRODED STEEL

1/S-303 FOR REPLACEMENT OF STANCHION DETAIL

CLEAN AREA ADJACENT TO EXISTING STANCHION. SEE

OF STANCHION DETAIL

STANCHION. SEE 1/S-303 FOR REPLACEMENT

WORK. CLEAN AREA ADJACENT TO EXISTING

REMOVE ALL STANDING WATER PRIOR TO NEW

OF THE STANCHION.

THE BASE OF THE WALL & AROUND THE BASE

2. CLEAN ALL LOOSE PIECES OF DEBRIS FROM

COATING.

APPLICATION OF A CORROSION RESISTANT

STEEL SHALL BE CLEANED TO ALLOW FOR

STANCHIONS (TO REMAIN) SHALL BE REMOVED.

1. ALL CORROSION PRESENT ON EXISTING STEEL

NOTES:

COORDINATOR ENGINEERING CHIEF

DATE REVISION BYNO. DATE NO. REVISION BY

C I

V

IL

ENGI

N

E E

R

US AF

WRIGHT-PATTERSON AIR FORCE BASE

88TH ABW

OF

DESIGN CHIEF

DATEDRAWNDESIGNED CHECKED

RPR/RPL STEAM STANCHIONS

PROJECT NUMBER ZHTV 090018

SUBMITTAL - 100% GOVT. SUBMITTAL

SPR SPR MSS JUNE 2015

File details come from the government source that posted it. Updated .