Attch_8-Drawings_S-102C_and_S-102D.pdf
PDF 12 MB Posted
- Attached to
- Repair-Replace Steam Pipe Stanchions Federal contract opportunity
- Solicitation number
- FA8601-15-R-0030
About this file
Attch 8-Drawings S-102C and S-102D
View the file
Other files for this federal contract opportunity
Show all 50
Repair-Replace Steam Pipe Stanchions has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S-102C
56 TUNNEL PHOTOS/DESCRIPTIONS
EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE
EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE
EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE
ACCESS AT STANCHION 76.
BASE OF TUNNEL NEAR MANHOLE
STANDING WATER PRESENT ALONG
102C-a 102C-b 102C-c
102C-f102C-e102C-d
102C-g 102C-h
SECTION AT STANCHION 66.
CORROSION & LOSS OF STEEL
HORIZONTAL SUPPORT HAVE
CONNECTION CHANNEL, & BOTTOM
BASE OF VERTICAL CHANNEL LEG,
STANCHION 68.
CONCRETE WALL & CEILING AT
SECTION. CRACKING PRESENT IN
HAS CORROSION & LOSS OF STEEL
TOP PORTION OF VERTICAL SUPPORT
SUPPORT AT STANCHION 72.
PIPE AND MISSING PIPE ROLLER
IN CORRECT LOCATION BELOW
BOTTOM HORIZONTAL SUPPORT NOT
PIPE ROLLER SUPPORT AT STANCHION 72.
CENTER HORIZONATL SUPPORT MISSING
AT STANCHION 76.
HORIZONTAL SUPPORT & PIPE ROLLER
SECTION. EXISTING PIPE MISSING
CORROSION & LOSS OF STEEL
& CONNECTION CHANNELS HAVE
BASE OF VERTICAL SUPPORT LEGS
& LOSS OF STEEL SECTION AT STANCHION 78.
LEGS & CONNECTION CHANNELS HAVE CORROSION
AROUND STANCHION. BASE OF VERTICAL SUPPORT
CONCRETE DEBRIS FROM WALL FACE PRESENT
STANDING WATER PRESENT ALONG BASE OF TUNNEL.
SUPPORT HAS ROTATION AT STANCHION 79.
LOSS OF STEEL SECTION. BOTTOM HORIZONTAL
CONNECTION CHANNELS HAVE CORROSION &
TUNNEL. BASE OF VERTICAL SUPPORT LEGS &
STANDING WATER PRESENT ALONG BASE OF
DETAIL.
SEE 1/S-303 FOR REPLACEMENT OF STANCHION
CLEAN AREA ADJACENT TO EXISTING STANCHION.
INJECTION REPAIR DETAIL.
DETAIL AND 3A/S-301 FOR CONCRETE CRACK
SEE 1/S-303 FOR REPLACEMENT OF STANCHION
CLEAN AREA ADJACENT TO EXISTING STANCHION.
DETAIL.
SEE 1/S-303 FOR REPLACEMENT OF STANCHION
CLEAN AREA ADJACENT TO EXISTING STANCHION.
DETAIL.
SEE 1/S-303 FOR REPLACEMENT OF STANCHION
CLEAN AREA ADJACENT TO EXISTING STANCHION.
EFFICIENCY.
OBSERVATION TO SUMP PUMP FOR PERFORMACE
REPLACED. WPAFB MAINTENANCE TO PROVIDE ROUTINE
SUMP PUMP FUNCTIONS PROPERLY & DOES NOT NEED
PER CONVERSATION w/ WPAFB TUNNEL MAINTENANCE, 1/S-303 FOR REPLACEMENT OF STANCHION DETAIL.
CLEAN AREA ADJACENT TO EXISTING STANCHION. SEE
REMOVE ANY STANDING WATER PRIOR TO NEW WORK.
OF THE STANCHION.
THE BASE OF THE WALL & AROUND THE BASE
2. CLEAN ALL LOOSE PIECES OF DEBRIS FROM
COATING.
APPLICATION OF A CORROSION RESISTANT
STEEL SHALL BE CLEANED TO ALLOW FOR
STANCHIONS (TO REMAIN) SHALL BE REMOVED.
1. ALL CORROSION PRESENT ON EXISTING STEEL
NOTES:
REPLACEMENT OF STANCHION DETAIL.
EXISTING STANCHION. SEE 1/S-303 FOR
NEW WORK. CLEAN AREA ADJACENT TO
REMOVE ANY STANDING WATER PRIOR TO
REPLACEMENT OF STANCHION DETAIL.
EXISTING STANCHION. SEE 1/S-303 FOR
NEW WORK. CLEAN AREA ADJACENT TO
REMOVE ANY STANDING WATER PRIOR TO
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
RPR/RPL STEAM STANCHIONS
PROJECT NUMBER ZHTV 090018
SUBMITTAL - 100% GOVT. SUBMITTAL
SPR SPR MSS JUNE 2015
S-102D
56 TUNNEL PHOTOS/DESCRIPTIONS
EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE
EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE
EXISTING CONDITION REPAIR PROCEDUREEXISTING CONDITION REPAIR PROCEDURE
102D-a 102D-b 102D-c
102D-f102D-e102D-d
102D-g 102D-h
SECTION AT STANCHION 83.
CORROSION & LOSS OF STEEL
DUCT BANK SUPPORT STEEL HAS
AT STANCHION 80.
CORROSION & LOSS OF STEEL SECTION
LEGS & CONNECTION CHANNELS HAVE
OF TUNNEL. BASE OF VERTICAL SUPPORT
STANDING WATER PRESENT ALONG BASE
AT STANCHION 81.
CORROSION & LOSS OF STEEL SECTION
LEGS & CONNECTION CHANNELS HAVE
OF TUNNEL. BASE OF VERTICAL SUPPORT
STANDING WATER PRESENT ALONG BASE
HORIZONTAL SUPPORT AT STANCHION 82.
PIPE ROLLER SUPPORT MISSING AT BOTTOM
CORROSION & LOSS OF STEEL SECTION.
& CONNECTION CHANNELS HAVE
BASE TUNNEL. VERTICAL SUPPORT LEGS
STANDING WATER PRESENT ALONG
AT STANCHION 83.
CORROSION & LOSS OF STEEL SECTION
LEGS & CONNECTION CHANNELS HAVE
OF TUNNEL. BASE OF VERTICAL SUPPORT
STANDING WATER PRESENT ALONG BASE
CONCRETE HAS SEPARATION AT STANCHION 83.
ROD CONNECTION BETWEEN DUCT BANK STEEL &
HAVE CORROSION & LOSS OF STEEL SECTION.
ROD SUPPORT, & DUCT BANK SUPPORT STEEL
TOP OF VERTICAL SUPPORT LEGS, HORIZONTAL
STANCHION 84.
PROVIDING BEARING FOR PIPE AT
HORIZONTAL SUPPORT & ROLLER NO LONGER
NOT SUPPORTED BY VERTICAL TIE RODS.
ONE SIDE OF HORIZONTAL CHANNEL SUPPORT
AT STANCHION 84.
CORROSION & LOSS OF STEEL SECTION
LEGS & CONNECTION CHANNELS HAVE
OF TUNNEL. BASE OF VERTICAL SUPPORT
STANDING WATER PRESENT ALONG BASE
1/S-303 FOR REPLACEMENT OF STANCHION DETAIL.
CLEAN AREA ADJACENT TO EXISTING STANCHION. SEE
REMOVE ANY STANDING WATER PRIOR TO NEW WORK.
1/S-303 FOR REPLACEMENT OF STANCHION DETAIL.
CLEAN AREA ADJACENT TO EXISTING STANCHION. SEE
REMOVE ANY STANDING WATER PRIOR TO NEW WORK.
1/S-303 FOR REPLACEMENT OF STANCHION DETAIL.
CLEAN AREA ADJACENT TO EXISTING STANCHION. SEE
REMOVE ANY STANDING WATER PRIOR TO NEW WORK.
1/S-303 FOR REPLACEMENT OF STANCHION DETAIL
CLEAN AREA ADJACENT TO EXISTING STANCHION. SEE
REMOVE ALL STANDING WATER PRIOR TO NEW WORK.
OF STANCHION DETAIL
STANCHION. SEE 1/S-303 FOR REPLACEMENT
STEEL. CLEAN AREA ADJACENT TO EXISTING
REMOVE ALL LOOSE PIECES OF CORRODED
FROM EXISTING DUCT BANK SUPPORT.
REMOVE ALL PIECES OF CORRODED STEEL
1/S-303 FOR REPLACEMENT OF STANCHION DETAIL
CLEAN AREA ADJACENT TO EXISTING STANCHION. SEE
OF STANCHION DETAIL
STANCHION. SEE 1/S-303 FOR REPLACEMENT
WORK. CLEAN AREA ADJACENT TO EXISTING
REMOVE ALL STANDING WATER PRIOR TO NEW
OF THE STANCHION.
THE BASE OF THE WALL & AROUND THE BASE
2. CLEAN ALL LOOSE PIECES OF DEBRIS FROM
COATING.
APPLICATION OF A CORROSION RESISTANT
STEEL SHALL BE CLEANED TO ALLOW FOR
STANCHIONS (TO REMAIN) SHALL BE REMOVED.
1. ALL CORROSION PRESENT ON EXISTING STEEL
NOTES:
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
RPR/RPL STEAM STANCHIONS
PROJECT NUMBER ZHTV 090018
SUBMITTAL - 100% GOVT. SUBMITTAL
SPR SPR MSS JUNE 2015