Attch__17-Drawings_S-105B_and_S-105C.pdf

PDF 12 MB Posted

Attached to
Repair-Replace Steam Pipe Stanchions Federal contract opportunity
Solicitation number
FA8601-15-R-0030
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

Attch 17-Drawings S-105B and S-105C

View the file

Other files for this federal contract opportunity

Other files attached to Repair-Replace Steam Pipe Stanchions, newest first.
File Type Posted
Attch_63Addend_03_Colored_S-105F-updated.pdf PDF
Attch_62_Addend_03_Colored_S-105E.pdf PDF
Attch_33_Addend_03_Colored_G-001.pdf PDF
Attch_54_Addend_03_Colored_S-104B.pdf PDF
Attch_63Addend_03_Colored_S-105F.pdf PDF
Attch_56_Addend_03_Colored_S-104D.pdf PDF
Attch_55_Addend_03_Colored_S-104C.pdf PDF
Attch_59_Addend_03_Colored_S-105B.pdf PDF
Attch_46_Addend_03_Colored_S-102E.pdf PDF
Attch_36_Addend_03_Colored_S-101C.pdf PDF
Attch_43_Addend_03_Colored_S-102B.pdf PDF
Attch_42_Addend_03_Colored_S-102A.pdf PDF
Attch_58_Addend_03_Colored_S-105A.pdf PDF
Attch_38_Addend_03_Colored_S-101E.pdf PDF
Attch_57_Addend_03_Colored_S-104E.pdf PDF
Attch_47_Addend_03_Colored_S-102F.pdf PDF
Attch_49_Addend_03_Colored_S-102H.pdf PDF
Attch_52_Addend_03_Colored_S-103C.pdf PDF
Attch_45_Addend_03_Colored_S-102D.pdf PDF
FA8601-15-R-0030-0002_Amendment_2.pdf PDF
Attch_39_Addend_03_Colored_S-101F.pdf PDF
Attch_61_Addend_03_Colored_S-105D.pdf PDF
Attch_41_Addend_03_Colored_S-101H.pdf PDF
Attch_37_Addend_03_Colored_S-101D.pdf PDF
Attch_48_Addend_03_Colored_S-102G.pdf PDF
RFI_0002.pdf PDF
RFI_0001.pdf PDF
FA8601-15-R-0030_Addendum_Number_02.pdf PDF
108001-00181-S-303.pdf PDF
Sign_In_Sheet_FA8601-15-R-0030.pdf PDF
Attch__18-Drawings_S-105D_and_S-105E.pdf PDF
Attch_19-Drawings_S-105F_and_S-105G.pdf PDF
Attch_23-Addendum_Number_01.pdf PDF
Attch__12-Drawings_S-103B_and_S-103C.pdf PDF
Attch__14-Drawings_S-104B_and_S-104C.pdf PDF
Attch_1-Specifications.pdf PDF
Attch_8-Drawings_S-102C_and_S-102D.pdf PDF
Attch__5-Drawings_S-101F_and_S-101G.pdf PDF
Attch_28-Addend_01_Cover_Page.pdf PDF
Attch_25-_Addend_01_DWG_S-301.pdf PDF
Attch_24-_Addend_01_DWG_S-101.pdf PDF
Attch__15-Drawings_S-104D_and_S-104E.pdf PDF
Attch__16-Drawings_S-105_and_S-105A.pdf PDF
Attch__22-General_Decision_Number_OH150002_OH2_12-Jun-15.pdf PDF
Attch_2-Drawings_G-001_S-001_S-101_and_S-101A.pdf PDF
Attch__13-Drawings_S-104_and_S-104A.pdf PDF
Attch_29_Addend_01_Table_of_Contents.pdf PDF
FA8601-15-R-0030.pdf PDF
Attch__20-Drawings_S-301_and_S-302.pdf PDF
Attch__6-Drawings_S-101H_and_S-102.pdf PDF
Show all 50

Repair-Replace Steam Pipe Stanchions has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S-105B 5th STREET TUNNEL PHOTOS/DESCRIPTIONS

EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE

EXISTING CONDITION REPAIR PROCEDUREEXISTING CONDITION REPAIR PROCEDUREEXISTING CONDITION REPAIR PROCEDURE

EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE

105B-c105B-b

105B-d 105B-e 105B-f

105B-h105B-g

44 & 46.

LOCATION BETWEEN STANCHIONS

CRACKING PRESENT NEAR SPALL

REBAR EXPOSED WITHIN CEILING.

CONCRETE SPALL & CORRODED

STANCHIONS 49 & 50.

MEMBER WITHIN CEILING BETWEEN

CONCRETE SPALL & CORRODED

CEILING & WALL AT STANCHION 55.

WITHIN CEILING. CRACKING PRESENT WITHIN

EXPOSED NEAR ABANDONED PIPE SLEEVE

CONCRETE SPALL & CORRODED REBAR

LOCATION BETWEEN STANCHIONS 60 & 63.

WITHIN CEILING PRESENT ACROSS SPALL

EXPOSED WITHIN CEILING. CRACKING

CONCRETE SPALL & CORRODED REBAR

BETWEEN STANCHIONS 60 & 63.

REBAR EXPOSED WITHIN CEILING

CONCRETE SPALL & CORRODED

60 & 63.

CEILING BETWEEN STANCHIONS

CORROSION VISIBLE THROUGHOUT

CONCRETE SPALL & CRACKING w/

STANCHIONS 60 & 63.

ALONG WIDTH OF TUNNEL BETWEEN

OR CRACK REPAIR MATERIAL PRESENT

EXPOSED WITHIN CEILING. JOINT FILLER

CONCRETE SPALL & CORRODED REBAR

105B-a

WITHIN CEILING BETWEEN STANCHIONS 49 & 50.

STEEL SECTION. WATER INSTRUSION PRESENT

SUPPORT LEGS HAVE CORROSION & LOSS OF

REBAR EXPOSED WITHIN CEILING. TOP OF VERTICAL

CONCRETE SPALL & CRACKING w/ CORRODED

OF CONCRETE TUNNEL DETAIL.

APPLICATION, & 2/S-303 FOR REPLACEMENT

DETAIL, 1/S-301 FOR EXTERNAL WATERPROOFING

SEE 1/S-303 FOR REPLACEMENT OF STANCHION

CLEAN AREA ADJACENT TO EXISTING STANCHION.

OF CONCRETE TUNNEL DETAIL.

APPLICATION AND 2/S-303 FOR REPLACEMENT

SEE 1/S-301 FOR EXTERNAL WATERPROOFING

OF CONCRETE TUNNEL DETAIL.

APPLICATION AND 2/S-303 FOR REPLACEMENT

SEE 1/S-301 FOR EXTERNAL WATERPROOFING

OF CONCRETE TUNNEL DETAIL.

APPLICATION, & 2/S-303 FOR REPLACEMENT

DETAIL, 1/S-301 FOR EXTERNAL WATERPROOFING

SEE 1/S-303 FOR REPLACEMENT OF STANCHION

CLEAN AREA ADJACENT TO EXISTING STANCHION.

OF CONCRETE TUNNEL DETAIL.

APPLICATION AND 2/S-303 FOR REPLACEMENT

SEE 1/S-301 FOR EXTERNAL WATERPROOFING

OF CONCRETE TUNNEL DETAIL.

APPLICATION AND 2/S-303 FOR REPLACEMENT

SEE 1/S-301 FOR EXTERNAL WATERPROOFING

OF THE STANCHION.

THE BASE OF THE WALL & AROUND THE BASE

2. CLEAN ALL LOOSE PIECES OF DEBRIS FROM

COATING.

APPLICATION OF A CORROSION RESISTANT

STEEL SHALL BE CLEANED TO ALLOW FOR

STANCHIONS (TO REMAIN) SHALL BE REMOVED.

1. ALL CORROSION PRESENT ON EXISTING STEEL

NOTES:

OF CONCRETE TUNNEL DETAIL.

APPLICATION AND 2/S-303 FOR REPLACEMENT

SEE 1/S-301 FOR EXTERNAL WATERPROOFING

OF CONCRETE TUNNEL DETAIL.

APPLICATION AND 2/S-303 FOR REPLACEMENT

SEE 1/S-301 FOR EXTERNAL WATERPROOFING

COORDINATOR ENGINEERING CHIEF

DATE REVISION BYNO. DATE NO. REVISION BY

C I

V

IL

ENGI

N

E E

R

US AF

WRIGHT-PATTERSON AIR FORCE BASE

88TH ABW

OF

DESIGN CHIEF

DATEDRAWNDESIGNED CHECKED

RPR/RPL STEAM STANCHIONS

PROJECT NUMBER ZHTV 090018

SUBMITTAL - 100% GOVT. SUBMITTAL

SPR SPR MSS JUNE 2015

S-105C 5th STREET TUNNEL PHOTOS/DESCRIPTIONS

EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE

EXISTING CONDITION REPAIR PROCEDUREEXISTING CONDITION REPAIR PROCEDUREEXISTING CONDITION REPAIR PROCEDURE

EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE

105C-c105C-b105C-a

105C-d 105C-e

105C-h105C-g

BETWEEN STANCHIONS 60 & 63.

REBAR EXPOSED WITHIN CEILING

CONCRETE SPALL & CORRODED

AT STANCHION 65.

REBAR EXPOSED WITHIN CEILING

CONCRETE SPALL & CORRODED

79.

ADJACENT TO JOINT AT STANCHION

REBAR EXPOSED WITHIN CEILING

CONCRETE SPALL & CORRODED

IN CEILING AT STANCHION 65.

REBAR EXPOSED AROUND VOID

CONCRETE SPALL & CORRODED

WITHIN CEILING AT STANCHION 81.

REBAR EXPOSED AROUND VOID

CONCRETE SPALL & CORRODED

WITHIN CEILING AT STANCHION 83.

CORRODED STEEL SUPPORTS PRESENT

PRESENT WITHIN WALL & CEILING.

EXPOSED WITHIN CEILING. CRACKING

CONCRETE SPALL & CORRODED REBAR

BETWEEN STANCHIONS 60 & 61.

EXIST STEAM PIPE EXPANSION JOINT

105C-f

STANCHION 3.

& LOSS OF STEEL SECTION AT

SUPPORT LEG HAS CORROSION

REBAR EXPOSED. TOP OF VERTICAL

CONCRETE SPALL & CORRODED

OF CONCRETE TUNNEL DETAIL.

APPLICATION AND 2/S-303 FOR REPLACEMENT

SEE 1/S-301 FOR EXTERNAL WATERPROOFING

OF CONCRETE TUNNEL DETAIL.

APPLICATION AND 2/S-303 FOR REPLACEMENT

SEE 1/S-301 FOR EXTERNAL WATERPROOFING

OF CONCRETE TUNNEL DETAIL.

APPLICATION AND 2/S-303 FOR REPLACEMENT

SEE 1/S-301 FOR EXTERNAL WATERPROOFING

OF CONCRETE TUNNEL DETAIL.

APPLICATION AND 2/S-303 FOR REPLACEMENT

SEE 1/S-301 FOR EXTERNAL WATERPROOFING

OF CONCRETE TUNNEL DETAIL.

APPLICATION AND 2/S-303 FOR REPLACEMENT

SEE 1/S-301 FOR EXTERNAL WATERPROOFING

OF CONCRETE TUNNEL DETAIL.

APPLICATION AND 2/S-303 FOR REPLACEMENT

SEE 1/S-301 FOR EXTERNAL WATERPROOFING

WATERPROOFING APPLICATION

SPALL REPAIR DETAIL, & 2/S-301 FOR INTERNAL

DETAIL, 3B & 3C/S-301 FOR CONCRETE SURFACE

SEE 1/S-303 FOR REPLACEMENT OF STANCHION

CLEAN AREA ADJACENT TO EXISTING STANCHION.

TO STEEL AT EXPANSION JOINT.

CORROSION RESISTANT COATING

CLEAN CORROSION AND APPLY A

OF THE STANCHION.

THE BASE OF THE WALL & AROUND THE BASE

2. CLEAN ALL LOOSE PIECES OF DEBRIS FROM

COATING.

APPLICATION OF A CORROSION RESISTANT

STEEL SHALL BE CLEANED TO ALLOW FOR

STANCHIONS (TO REMAIN) SHALL BE REMOVED.

1. ALL CORROSION PRESENT ON EXISTING STEEL

NOTES: COORDINATOR ENGINEERING CHIEF

DATE REVISION BYNO. DATE NO. REVISION BY

C I

V

IL

ENGI

N

E E

R

US AF

WRIGHT-PATTERSON AIR FORCE BASE

88TH ABW

OF

DESIGN CHIEF

DATEDRAWNDESIGNED CHECKED

RPR/RPL STEAM STANCHIONS

PROJECT NUMBER ZHTV 090018

SUBMITTAL - 100% GOVT. SUBMITTAL

SPR SPR MSS JUNE 2015