Attch__13-Drawings_S-104_and_S-104A.pdf
PDF 5 MB Posted
- Attached to
- Repair-Replace Steam Pipe Stanchions Federal contract opportunity
- Solicitation number
- FA8601-15-R-0030
About this file
Attch 13-Drawings S-104 and S-104A
View the file
Other files for this federal contract opportunity
Show all 50
Repair-Replace Steam Pipe Stanchions has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S-104
REPAIR LOCATION PLAN
32 CROSSOVER TUNNEL
S-104 SCALE: N.T.S.
REPAIR LOCATION PLAN
32 CROSSOVER STEAM TUNNEL NORTH
MATERIALS PRESENT.
THAT MAY HAVE ASBESTOS CONTAINING
CERTAIN ADJOINING HALF ROUND TUNNELS
AREAS OF THE TUNNELS, THERE ARE
BEEN ACCOMPLISHED. HOWEVER, IN FEW
ASBESTOS SURVEY/REMEDIATION HAS
IN MAIN TUNNELS IDENTIFIED IN PROJECT,
NOTE TO CONTRACTOR:
EXISTING STANCHION ASSESSMENT
LOCATION
STANCHION
(EXISTING)
REPAIR
CLEAN
30, 32, 37, 38
34, 35, 36, 27, 28, 29, 31, 33, 23, 24, 25, 26, 18, 19, 20, 21, 22, 13, 14, 15, 16, 17, 7, 8, 9, 10, 11, 12, 1, 2, 3, 4, 5, 6, (w/ NEW)
REPLACEMENT
REMAIN.
EXISTING PIPE ROLLER SUPPORTS AT THESE STANCHIONS SHALL
REPAIR ONLY, SHALL NOT NEED NEW PIPE ROLLER SUPPORTS.
3. EXISTING STANCHIONS (WITHIN 32 CROSSOVER TUNNEL) REQUIRING
EXISTING STANCHIONS THAT SHALL REMAIN.
2. SEE SHEET S-302 FOR REPAIRS METHOD REQUIREMENTS TO
EXISTING STANCHION) DETAIL.
1. SEE DETAIL 1/S-303 FOR NEW STANCHION (REPLACEMENT OF
NOTES:
IN ORIGINAL LOCATION.
3. RE-SECURE THE CONDUIT AND FIXTURES
FIXTURES AS REQUIRED FOR WORK.
2. REMOVE CONDUIT CLAMPS AND LIGHTING
FIXTURES TO MAINTAIN CIRCUITRY.
1. TEMPORARILY SUPPORT THE CONDUIT AND
(NOTE TO CONTRACTOR):
CONDUIT INTERFERENCE
EXISTING ELECTRICAL
FOR ADDITIONAL REQUIREMENTS PER WPAFB.
E. CONTRACTOR SHALL REFER TO GENERAL NOTES SHEET, S-001,
c. REPAIR METHODS
b. REPAIR MATERIALS
a. CONCRETE REMOVAL METHODS
SCHEDULE OF WORK SHALL FOLLOW INFORMATION IN TABLES:
PERFORMED DURING TUNNEL REPAIR. THE SEQUENCE AND
WORK, THE SEQUENCING AND SCHEDULING OF WORK TO BE
ALL MATERIALS (PROPERTIES) TO BE USED FOR TUNNEL REPAIR
FOR CIVIL WORKS", SECTION 1.4 "SYSTEM DESCRIPTION", FOR
D. REFER TO SPECIFICATION 03 01 32 "CONCRETE REHABILITATION
TO ANY DEMOLITION/NEW WORK THROUGHOUT THE TUNNEL.
C. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR
TUNNEL.
B. INDICATES EVERY 5th STANCHION ALONG LENGTH OF
A. EXTENTS OF 32 CROSSOVER TUNNEL REPAIR ASSESSMENT.
SHEET GENERAL NOTES:
PER SHEET S-301.
THROUGH WALL w/ APPLICABLE CONCRETE REPAIR METHODS
OF PIPES THROUGH TUNNEL WALLS. PATCH PENETRATION
SEE S-104D FOR DEPICTION AND LOCATION OF PENETRATION
WALL AND DISPOSE OF PER WPAFB DISPOSAL PROCEDURES.
D. DEMOLISH ABANDONED PIPES PENETRATING THRU TUNNEL
DISPOSE OF PER WPAFB DISPOSAL PROCEDURES.
C. ABANDONED PIPE (ALONG STANCHIONS) REMOVAL REQUIRED.
WATERPROOFING (BEYOND TYPICAL 1’-0" BASE APPLICATION).
ON S-104 FOR LOCATIONS OF REQUIRED INTERNAL
3C/S-301 FOR APPLICABLE REPAIR METHOD). SEE CHART
REINFORCING BARS WITH CORROSION (SEE DETAILS 3B &
SPALLING CONCRETE AND CLEANING/REPLACING EXISTING
WATER INTRUSION (SEE DETAIL 3A/S-301), PATCH FOR
2/S-301), INJECTION OF CRACKS ALONG CONCRETE FOR
WATERPROOFING THE FACE OF THE TUNNEL (SEE DETAIL
AND SLAB REQUIRED. REPAIRS SHALL INCLUDE INTERNAL
B. CONCRETE REPAIR ALONG THE TUNNEL WALLS, CEILING,
INFORMATION.
SEE SPECIFICATION 23 05 15 FOR APPLICABLE PIPE ROLLER
PIPE ROLLER SUPPORT AT THE NECESSARY PIPE LOCATIONS.
STANCHIONS. NEW STANCHIONS SHALL REQUIRE NEW
REQUIRED ACTION BASED ON ASSESSMENT OF EXISTING
ON S-104 INDICATING STANCHIONS WITHIN TUNNEL AND
REQUIRED. SEE "EXISTING STANCHON ASSESSMENT" CHART
A. EXISTING PIPE STANCHION REPAIR OR FULL REPLACEMENT
DRAWING NOTES:
APPLICATIONS ARE REQUIRED.
WHERE ADDITIONAL INTERNAL WATERPROOFING
1. LOCATIONS DEPICTED IN CHART ARE LOCATIONS
NOTES:
APPLICATION LOCATION
INTERNAL WATERPROOFING
CEILING/TOP WALL
TUNNEL SURFACE
(STANCHION)
LOCATIONS
BETWEEN 11 & 12 CEILING/WALL
14 CEILING/WALL
26 CEILING/WALL
BETWEEN 33 & 34 CEILING/OPENING
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
RPR/RPL STEAM STANCHIONS
PROJECT NUMBER ZHTV 090018
SUBMITTAL - 100% GOVT. SUBMITTAL
SPR SPR MSS JUNE 2015
385 353025201510
A
B
AAAA
B
D
A
C
A
B
C
A
C
S-104A
PHOTOS/DESCRIPTIONS
32 CROSSOVER TUNNEL
EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE
EXISTING CONDITION REPAIR PROCEDUREEXISTING CONDITION REPAIR PROCEDUREEXISTING CONDITION REPAIR PROCEDURE
EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE
104A-h104A-g
104A-d 104A-e 104A-f
104A-c104A-b104A-a
STEEL SUPPORT AT STANCHION 15.
CORROSION PRESENT THROUGHOUT
STANCHION 4.
OF VERTICAL SUPPORT LEG AT
EMPTY PIPE HANGAR ON FACE
ALONG BASE AT STANCHION 4.
SECTION. WATER INTRUSION PRESENT
CORROSION & LOSS OF STEEL
BASE OF VERTICAL SUPPORT LEG HAS
INTRUSION PRESENT ALONG BASE AT STANCHION 8.
AT BOTTOM & CENTER SUPPORTS. WATER
LOSS OF STEEL SECTION. PIPE ROLLERS MISSING
HORIZONTAL PIPE SUPPORT HAVE CORROSION &
BASE OF VERTICAL SUPPORT LEG & BOTTOM
PRESENT ALONG BASE AT STANCHION 9.
AT BOT. & CENTER SUPPORTS. WATER INTRUSION
LOSS OF STEEL SECTION. PIPE ROLLERS MISSING
HORIZONTAL PIPE SUPPORT HAVE CORROSION &
BASE OF VERTICAL SUPPORT LEG & BOTTOM
ALONG BASE AT STANCHION 10.
BOTTOM SUPPORTS. WATER INTRUSION PRESENT
SECTION. PIPE ROLLER MISSING AT CENTER &
SUPPORT HAVE CORROSION & LOSS OF STEEL
PLATE TO WALL, & BOTTOM HORIZONTAL PIPE
BASE OF VERTICAL SUPPORT LEGS, CONNECTION
PRESENT ALONG BASE AT STANCHION 11.
MISSING AT BOTTOM SUPPORT. WATER INSTRUSION
& LOSS OF STEEL SECTION. PIPE ROLLER
HORIZONTAL PIPE SUPPORT HAVE CORROSION
BASE OF VERTICAL SUPPORT LEG & BOTTOM
INTRUSION PRESENT ALONG BASE AT STANCHION 13.
SUPPORT AT CENTER & BOTTOM SUPPORTS. WATER
& LOSS OF STEEL SECTION. MISSING PIPE ROLLER
HORIZONTAL PIPE SUPPORT HAVE CORROSION
BASE OF VERTICAL SUPPORT LEG & BOTTOM
WPAFB DISPOSAL PROCEDURES.
ALL DEMOLISHED MATERIAL PER
ON SUPPORT LEG. DISPOSE OF
DEMOLISH EXISTING PIPE HANGAR
APPLICATION
DETAIL & 2/S-301 FOR INTERNAL WATERPROOFING
SEE 1/S-303 FOR REPLACEMENT OF STANCHION
CLEAN AREA ADJACENT TO EXISTING STANCHION.
APPLICATION
DETAIL & 2/S-301 FOR INTERNAL WATERPROOFING
SEE 1/S-303 FOR REPLACEMENT OF STANCHION
CLEAN AREA ADJACENT TO EXISTING STANCHION.
APPLICATION
DETAIL & 2/S-301 FOR INTERNAL WATERPROOFING
SEE 1/S-303 FOR REPLACEMENT OF STANCHION
CLEAN AREA ADJACENT TO EXISTING STANCHION.
APPLICATION
DETAIL & 2/S-301 FOR INTERNAL WATERPROOFING
SEE 1/S-303 FOR REPLACEMENT OF STANCHION
CLEAN AREA ADJACENT TO EXISTING STANCHION.
APPLICATION
DETAIL & 2/S-301 FOR INTERNAL WATERPROOFING
SEE 1/S-303 FOR REPLACEMENT OF STANCHION
CLEAN AREA ADJACENT TO EXISTING STANCHION.
APPLICATION
DETAIL & 2/S-301 FOR INTERNAL WATERPROOFING
SEE 1/S-303 FOR REPLACEMENT OF STANCHION
CLEAN AREA ADJACENT TO EXISTING STANCHION.
DETAIL.
SEE 1/S-303 FOR REPLACEMENT OF STANCHION
CLEAN AREA ADJACENT TO EXISTING STANCHION.
OF THE STANCHION.
THE BASE OF THE WALL & AROUND THE BASE
2. CLEAN ALL LOOSE PIECES OF DEBRIS FROM
COATING.
APPLICATION OF A CORROSION RESISTANT
STEEL SHALL BE CLEANED TO ALLOW FOR
STANCHIONS (TO REMAIN) SHALL BE REMOVED.
1. ALL CORROSION PRESENT ON EXISTING STEEL
NOTES:
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
RPR/RPL STEAM STANCHIONS
PROJECT NUMBER ZHTV 090018
SUBMITTAL - 100% GOVT. SUBMITTAL
SPR SPR MSS JUNE 2015
File details come from the government source that posted it. Updated .