FA8601-15-R-0030_Addendum_Number_02.pdf
PDF 44 KB Posted
- Attached to
- Repair-Replace Steam Pipe Stanchions Federal contract opportunity
- Solicitation number
- FA8601-15-R-0030
About this file
Amendment 01
View the file
Other files for this federal contract opportunity
Show all 50
Repair-Replace Steam Pipe Stanchions has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
090018
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The reason for this addendum is to incorporate addendum number 02 into the solicitaion
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 09-Jul-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA8601-15-R-0030
X 9B. DATED (SEE ITEM 11)
24-Jun-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
09-Jul-2015
CODE
AFLCMC/PZIOCB - CONSTRUCTION SECTION B
POC: JONATHAN L HERD
1940 ALLBROOK DRIVE, ROOM 111
WRIGHT-PATTERSON AFB OH 45433-5344
FA8601 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA8601-15-R-0030
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION I - CONTRACT CLAUSES
The following have been modified:
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Drawing Number Title Date G-001 Drawing Index and Location Maps Jun 2015 S-001 Structural General Notes Jun 2015 S-101 Bull Head Steam Tunnel Repair Location Plan 22 Jun 2015 S-101A Bull Head Tunnel Photos/Descriptions Jun 2015 S-101B Bull Head Tunnel Photos/Descriptions Jun 2015 S-101C Bull Head Tunnel Photos/Descriptions Jun 2015 S-101D Bull Head Tunnel Photos/Descriptions Jun 2015 S-101E Bull Head Tunnel Photos/Descriptions Jun 2015 S-101F Bull Head Tunnel Photos/Descriptions Jun 2015 S-101G Bull Head Tunnel Photos/Descriptions Jun 2015 S-101H Bull Head Tunnel Photos/Descriptions Jun 2015
S-102 56 Steam Tunnel Repair Location Plan Jun 2015 S-102A 56 Tunnel Photos/Descriptions Jun 2015 S-102B 56 Tunnel Photos/Descriptions Jun 2015 S-102C 56 Tunnel Photos/Descriptions Jun 2015 S-102D 56 Tunnel Photos/Descriptions Jun 2015 S-102E 56 Tunnel Photos/Descriptions Jun 2015 S-102F 56 Tunnel Photos/Descriptions Jun 2015 S-102G 56 Tunnel Photos/Descriptions Jun 2015 S-102H 56 Tunnel Photos/Descriptions Jun 2015 S-103 52 Steam Tunnel Repair Location Plan Jun 2015 S-103A 52 Steam Tunnel Photos/Descriptions Jun 2015 S-103B 52 Steam Tunnel Photos/Descriptions Jun 2015 S-103C 52 Steam Tunnel Photos/Descriptions Jun 2015 S-104 32 Crossover Tunnel Repair Location Plan Jun 2015 S-104A 32 Crossover Tunnel Photos/Descriptions Jun 2015 S-104B 32 Crossover Tunnel Photos/Descriptions Jun 2015 S-104C 32 Crossover Tunnel Photos/Descriptions Jun 2015 S-104D 32 Crossover Tunnel Photos/Descriptions Jun 2015 S-104E 32 Crossover Tunnel Photos/Descriptions Jun 2015 S-105 5th Street Tunnel Repair Location Plan Jun 2015 S-105A 5th Street Tunnel Photos/Descriptions Jun 2015 S-105B 5th Street Tunnel Photos/Descriptions Jun 2015 S-105C 5th Street Tunnel Photos/Descriptions Jun 2015 S-105D 5th Street Tunnel Photos/Descriptions Jun 2015 S-105E 5th Street Tunnel Photos/Descriptions Jun 2015 S-105F 5th Street Tunnel Photos/Descriptions Jun 2015 S-105G 5th Street Tunnel Photos/Descriptions Jun 2015 S-301 Structural Concrete Repair Details & Sections 22 Jun 2015 S-302 Steel Stanchion Repair Details & Sections Jun 2015 S-303 Concrete Tunnel Element & Steam Stanchion 6 Jul 2015 Replacement Details
(End of clause)
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 01 Specifications 213 01-JUN-2015 Attachment 02 Drawings G-001 S-001 S-
101 and S-101A
4 01-JUN-2015
Attachment 03 Drawings S-101B and S- 101C
2 01-JUN-2015
Attachment 04 Drawings S-101D and S- 101E
2 01-JUN-2015
Attachment 05 Drawings S-101F and S- 101G
2 01-JUN-2015
Attachment 06 Drawings S-101H and S-
2 01-JUN-2015
Attachment 07 Drawings S-102A and S- 2 01-JUN-2015
102B Attachment 08 Drawings S-102C and S-
102D
2 01-JUN-2015
Attachment 09 Drawings S-102E and S- 102F
2 01-JUN-2015
Attachment 10 Drawings S-102G and S- 102H
2 01-JUN-2015
Attachment 11 Drawings S-103 and S- 103A
2 01-JUN-2015
Attachment 12 Drawings S-103B and S- 103C
2 01-JUN-2015
Attachment 13 Drawings S-104 and S- 104A
2 01-JUN-2015
Attachment 14 Drawings S-104B and S- 104C
2 01-JUN-2015
Attachment 15 Drawings S-104D and S- 104E
2 01-JUN-2015
Attachment 16 Drawings S-105 and S- 105A
2 01-JUN-2015
Attachment 17 Drawings S-105B and S- 105C
2 01-JUN-2015
Attachment 18 Drawings S-105D and S- 105E
2 01-JUN-2015
Attachment 19 Drawings S-105F and S- 105G
2 01-JUN-2015
Attachment 20 Drawings S-301 and S-
2 01-JUN-2015
Attachment 21 Drawings S-303 1 01-JUN-2015 Attachment 22 General Decision Number
OH150002 OH02
44 12-JUN-2015
Attachment 23 Addendum Number 01 1 22-JUN-2015 Attachment 24 Addend 01 DWG S-101 1 22-JUN-2015 Attachment 25 Addend 01 DWG S-301 1 22-JUN-2015 Attachment 26 Addend 01 Section 01 01
4 22-JUN-2015
Attachment 27 Addend 01Section 01 01
21 22-JUN-2015
Attachment 28 Addend 01 Cover Page 1 22-JUN-2015 Attachment 29 Addend 01 Table of
Contents
1 22-JUN-2015
to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 01 Specifications 213 01-JUN-2015 Attachment 02 Drawings G-001 S-001 S-
101 and S-101A
4 01-JUN-2015
Attachment 03 Drawings S-101B and S- 101C
2 01-JUN-2015
Attachment 04 Drawings S-101D and S- 101E
2 01-JUN-2015
Attachment 05 Drawings S-101F and S- 2 01-JUN-2015
101G Attachment 06 Drawings S-101H and S-
2 01-JUN-2015
Attachment 07 Drawings S-102A and S- 102B
2 01-JUN-2015
Attachment 08 Drawings S-102C and S- 102D
2 01-JUN-2015
Attachment 09 Drawings S-102E and S- 102F
2 01-JUN-2015
Attachment 10 Drawings S-102G and S- 102H
2 01-JUN-2015
Attachment 11 Drawings S-103 and S- 103A
2 01-JUN-2015
Attachment 12 Drawings S-103B and S- 103C
2 01-JUN-2015
Attachment 13 Drawings S-104 and S- 104A
2 01-JUN-2015
Attachment 14 Drawings S-104B and S- 104C
2 01-JUN-2015
Attachment 15 Drawings S-104D and S- 104E
2 01-JUN-2015
Attachment 16 Drawings S-105 and S- 105A
2 01-JUN-2015
Attachment 17 Drawings S-105B and S- 105C
2 01-JUN-2015
Attachment 18 Drawings S-105D and S- 105E
2 01-JUN-2015
Attachment 19 Drawings S-105F and S- 105G
2 01-JUN-2015
Attachment 20 Drawings S-301 and S-
2 01-JUN-2015
Attachment 21 Drawings S-303 1 01-JUN-2015 Attachment 22 General Decision Number
OH150002 OH02
44 12-JUN-2015
Attachment 23 Addendum Number 01 1 22-JUN-2015 Attachment 24 Addend 01 DWG S-101 1 22-JUN-2015 Attachment 25 Addend 01 DWG S-301 1 22-JUN-2015 Attachment 26 Addend 01 Section 01 01
4 22-JUN-2015
Attachment 27 Addend 01Section 01 01
21 22-JUN-2015
Attachment 28 Addend 01 Cover Page 1 22-JUN-2015 Attachment 29 Addend 01 Table of
Contents
1 22-JUN-2015
Attachment 30 Addendum Number 02 1 06-JUL-2015 Attachment 31 Addendum 02 Drawing S-
1 06-JUL-2015
(End of Summary of Changes)
File details come from the government source that posted it. Updated .