Attch__5-Drawings_S-101F_and_S-101G.pdf

PDF 12 MB Posted

Attached to
Repair-Replace Steam Pipe Stanchions Federal contract opportunity
Solicitation number
FA8601-15-R-0030
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

Attch 5-Drawings S-101F and S-101G

View the file

Other files for this federal contract opportunity

Other files attached to Repair-Replace Steam Pipe Stanchions, newest first.
File Type Posted
Attch_42_Addend_03_Colored_S-102A-updated.pdf PDF
Attch_43_Addend_03_Colored_S-102B-updated.pdf PDF
Attch_62_Addend_03_Colored_S-105E.pdf PDF
Attch_33_Addend_03_Colored_G-001.pdf PDF
Attch_54_Addend_03_Colored_S-104B.pdf PDF
Attch_63Addend_03_Colored_S-105F.pdf PDF
Attch_56_Addend_03_Colored_S-104D.pdf PDF
Attch_55_Addend_03_Colored_S-104C.pdf PDF
Attch_59_Addend_03_Colored_S-105B.pdf PDF
Attch_46_Addend_03_Colored_S-102E.pdf PDF
Attch_36_Addend_03_Colored_S-101C.pdf PDF
Attch_43_Addend_03_Colored_S-102B.pdf PDF
Attch_42_Addend_03_Colored_S-102A.pdf PDF
Attch_58_Addend_03_Colored_S-105A.pdf PDF
Attch_38_Addend_03_Colored_S-101E.pdf PDF
Attch_57_Addend_03_Colored_S-104E.pdf PDF
Attch_47_Addend_03_Colored_S-102F.pdf PDF
Attch_49_Addend_03_Colored_S-102H.pdf PDF
Attch_52_Addend_03_Colored_S-103C.pdf PDF
Attch_40_Addend_03_Colored_S-101G.pdf PDF
Attch_50_Addend_03_Colored_S-103A.pdf PDF
Attch_51_Addend_03_Colored_S-103B.pdf PDF
Attch_53_Addend_03_Colored_S-104A.pdf PDF
Attch_35_Addend_03_Colored_S-101B.pdf PDF
Attch_60_Addend_03_Colored_S-105C.pdf PDF
Attch_34_Addend_03_Colored_S-101A.pdf PDF
Attch_64_Addend_03_Colored_S-105G.pdf PDF
Attch_44_Addend_03_Colored_S-102C.pdf PDF
RFI_0002.pdf PDF
FA8601-15-R-0030_Addendum_Number_02.pdf PDF
FFPAddendum(w_Modifications).pdf PDF
Attch__18-Drawings_S-105D_and_S-105E.pdf PDF
Attch__17-Drawings_S-105B_and_S-105C.pdf PDF
Attch_19-Drawings_S-105F_and_S-105G.pdf PDF
Attch_23-Addendum_Number_01.pdf PDF
Attch__12-Drawings_S-103B_and_S-103C.pdf PDF
Attch__14-Drawings_S-104B_and_S-104C.pdf PDF
Attch_1-Specifications.pdf PDF
Attch_8-Drawings_S-102C_and_S-102D.pdf PDF
Attch_28-Addend_01_Cover_Page.pdf PDF
Attch_25-_Addend_01_DWG_S-301.pdf PDF
Attch_24-_Addend_01_DWG_S-101.pdf PDF
Attch__15-Drawings_S-104D_and_S-104E.pdf PDF
Attch_26-Addend_01_Section_01_01_00.pdf PDF
Attch__9-Drawings_S-102E_and_S-102F.pdf PDF
Attch__10-Drawings_S-102G_and_S-102H.pdf PDF
Attch__3-Drawings_S-101B_and_S-101C.pdf PDF
Attch_27-Addend_01_Section_01_02_50.pdf PDF
Attch__7-Drawings_S-102A_and_S-102B.pdf PDF
Attch__11-Drawings_S-103_and_S-103A.pdf PDF
Show all 50

Repair-Replace Steam Pipe Stanchions has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S-101F

BULL HEAD TUNNEL PHOTOS/DESCRIPTIONS

REPAIR PROCEDUREEXISTING CONDITION REPAIR PROCEDUREEXISTING CONDITION REPAIR PROCEDUREEXISTING CONDITION

REPAIR PROCEDUREEXISTING CONDITION REPAIR PROCEDUREEXISTING CONDITION REPAIR PROCEDUREEXISTING CONDITION

REPAIR PROCEDUREEXISTING CONDITION REPAIR PROCEDUREEXISTING CONDITION

101F-a 101F-b 101F-c

101F-f101F-e101F-d

101F-g 101F-h

STANCHION 39.

EXPANSION JOINT ANCHOR NEAR

STANCHION 54.

REPLACED w/ NEW ROLLER AT

PIPE ROLLER SUPPORT TO BE

HIGH PRESSURE CONDENSATE

OF WALL AT TUNNEL 56 INTERSECTION.

w/ WATER INTRUSION THROUGHOUT FACE

EXTENSIVE CONCRETE SPALL & CRACKING

BASE OF TUNNEL .

SHOWING WATER INTRUSION ALONG

INTERSECTION w/ TUNNEL 56

VIEW OF BULL HEAD TUNNEL AT

BOTTOM SUPPORT AT STANCHION 26.

BEARING CONTACT w/ PIPE AT

PIPE ROLLER SUPPORT NOT IN

56 INTERSECTION.

CORNER OF WALL AT TUNNEL

REPAIR w/ VISIBLE CRACKING AT

EXISTING CONCRETE PATCH WORK

NEAR STANCHION 29.

THROUGHOUT CONCRETE WALL

VERTICAL & HORIZONTAL CRACKING

ANCHOR STEEL.

CORROSION RESISTANT COMPOUND TO

JOINT ANCHOR STEEL AND PROVIDE A

CLEAN ALL CORROSION FROM EXPANSION

SECTION 23 05 15.

LOCATIONS PER CRITERIA WITHIN SPEC

PROVIDE NEW PIPE ROLLER AT REQUIRED

SECTION 23 05 15.

LOCATIONS PER CRITERIA WITHIN SPEC

PROVIDE NEW PIPE ROLLER AT REQUIRED

NEAR STANCHION 24.

BASE AT TUNNEL 56 INTERSECTION

INTRUSTION PRESENT AT VOID & ALONG

VOID AT BOTTOM OF WALL. WATER

ABANDONED PIPES PENETRATING THROUGH

FOR CONCRETE SURFACE PATCH REPAIR DETAIL.

WATERPROOFING APPLICATION & 3B & 3C/S-301

LOOSE CONCRETE. SEE 2/S-301 FOR INTERNAL

PENETRATING THROUGH WALL. SAWCUT AND REMOVE

GRIND AND DEMOLISH ALL EXISTING CORRODED STEEL

CRACK INJECTION REPAIR DETAIL.

APPLICATION & 3A/S-301 FOR CONCRETE

SEE 2/S-301 FOR INTERNAL WATERPROOFING

APPLICATION.

2/S-301 FOR INTERNAL WATERPROOFING

SURFACE SPALL REPAIR DETAIL &

SEE 3B & 3C/S-301 FOR CONCRETE

OF THE STANCHION.

THE BASE OF THE WALL & AROUND THE BASE

2. CLEAN ALL LOOSE PIECES OF DEBRIS FROM

COATING.

APPLICATION OF A CORROSION RESISTANT

STEEL SHALL BE CLEANED TO ALLOW FOR

STANCHIONS (TO REMAIN) SHALL BE REMOVED.

1. ALL CORROSION PRESENT ON EXISTING STEEL

NOTES:

WATERPROOFING APPLICATION

SEE 2/S-301 FOR INTERNAL

APPLICATION.

FOR EXTERNAL WATERPROOFING

REPLACEMENT DETAIL AND 1/S-301

SEE 2/S-303 FOR TUNNEL CONCRETE

COORDINATOR ENGINEERING CHIEF

DATE REVISION BYNO. DATE NO. REVISION BY

C I

V

IL

ENGI

N

E E

R

US AF

WRIGHT-PATTERSON AIR FORCE BASE

88TH ABW

OF

DESIGN CHIEF

DATEDRAWNDESIGNED CHECKED

RPR/RPL STEAM STANCHIONS

PROJECT NUMBER ZHTV 090018

SUBMITTAL - 100% GOVT. SUBMITTAL

SPR SPR MSS JUNE 2015

S-101G

BULL HEAD TUNNEL PHOTOS/DESCRIPTIONS

REPAIR PROCEDUREEXISTING CONDITION REPAIR PROCEDURE REPAIR PROCEDURE

REPAIR PROCEDURE REPAIR PROCEDURE REPAIR PROCEDURE

REPAIR PROCEDURE REPAIR PROCEDURE

101G-a 101G-b 101G-c

101G-f101G-e101G-d

101G-g 101G-h

STANCHION 29.

PRESENT AT TOP OF WALL NEAR

EXPOSED IN WALL. WATER INTRUSION

CONCRETE SPALL & CORRODED REBAR

STANCHION 35.

THROUGHOUT FACE OF WALL NEAR

EXPOSED IN WALL. WATER INTRUSION

CONCRETE SPALL & CORRODED REBAR

EXISTING CONDITION EXISTING CONDITION

EXISTING CONDITION EXISTING CONDITION EXISTING CONDITION

SUPPORT LEG AT STANCHION 40.

OF CONCRETE PLATFORM AT STANCHION

CRACKING OF CONCRETE WITHIN FACE

57 INTERSECTION.

OF MANHOLE ACCESS ROOM NEAR TUNNEL

ENDS EXPOSED WITHIN PERIMETER WALL

CONCRETE SPALL & CORRODED REBAR

INTERSECTION.

ACCESS ROOM NEAR TUNNEL 57

PERIMETER WALL OF MANHOLE

CORRODED REBAR EXPOSED WITHIN

EXISTING CONDITION EXISTING CONDITION

TUNNEL NEAR TUNNEL 57 INTERSECTION.

WATER INTRUSION PRESENT ALONG BASE OF

PIPES, & OTHER DEBRIS AT BASE OF TUNNEL.

CONCRETE PIECES FROM TUNNEL, CORRODED

WORK LOCATION NEAR STANCHION 35.

& CORRODED REBAR EXPOSED AT PATCH

AROUND PENETRATION. CONCRETE SPALL

EXISTING CONCRETE PATCH WORK REPAIR

PIPE PENETRATING THROUGH WALL w/

STANCHION 19.

CONCRETE BULKHEAD ON CEILING NEAR

EXPOSED ON VERTICAL FACE OF

CONCRETE SPALL & CORRODED REBAR

OF THE STANCHION.

THE BASE OF THE WALL & AROUND THE BASE

2. CLEAN ALL LOOSE PIECES OF DEBRIS FROM

COATING.

APPLICATION OF A CORROSION RESISTANT

STEEL SHALL BE CLEANED TO ALLOW FOR

STANCHIONS (TO REMAIN) SHALL BE REMOVED.

1. ALL CORROSION PRESENT ON EXISTING STEEL

NOTES:

APPLICATION.

FOR EXTERNAL WATERPROOFING

REPLACEMENT DETAIL AND 1/S-301

SEE 2/S-303 FOR TUNNEL CONCRETE

APPLICATION.

FOR EXTERNAL WATERPROOFING

REPLACEMENT DETAIL AND 1/S-301

SEE 2/S-303 FOR TUNNEL CONCRETE

APPLICATION.

FOR EXTERNAL WATERPROOFING

REPLACEMENT DETAIL AND 1/S-301

SEE 2/S-303 FOR TUNNEL CONCRETE

SURFACE SPALL REPAIR DETAIL.

SEE 3B & 3C/S-301 FOR CONCRETE

SURFACE SPALL REPAIR DETAIL.

SEE 3B & 3C/S-301 FOR CONCRETE

SURFACE SPALL REPAIR DETAIL.

SEE 3B & 3C/S-301 FOR CONCRETE

APPLICATION.

SEE 2/S-301 FOR INTERNAL WATERPROOFING

BASE SLAB & RAISED CONC. PLATFORM.

REMOVE ALL DEBRIS FROM TUNNEL

2/S-301 INTERNAL WATERPROOFING APPLICATION.

CONCRETE SURFACE SPALL REPAIR DETAIL &

SPALL SURFACE. SEE 3B & 3C/S-301 FOR

REMOVE ANY LOOSE CONCRETE PIECES ALONG

COORDINATOR ENGINEERING CHIEF

DATE REVISION BYNO. DATE NO. REVISION BY

C I

V

IL

ENGI

N

E E

R

US AF

WRIGHT-PATTERSON AIR FORCE BASE

88TH ABW

OF

DESIGN CHIEF

DATEDRAWNDESIGNED CHECKED

RPR/RPL STEAM STANCHIONS

PROJECT NUMBER ZHTV 090018

SUBMITTAL - 100% GOVT. SUBMITTAL

SPR SPR MSS JUNE 2015

File details come from the government source that posted it. Updated .