Attch_26-Addend_01_Section_01_01_00.pdf

PDF 13 KB Posted

Attached to
Repair-Replace Steam Pipe Stanchions Federal contract opportunity
Solicitation number
FA8601-15-R-0030
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

Attch 26-Addend 01 Section 01 01 00

View the file

Other files for this federal contract opportunity

Other files attached to Repair-Replace Steam Pipe Stanchions, newest first.
File Type Posted
Attch_42_Addend_03_Colored_S-102A-updated.pdf PDF
Attch_43_Addend_03_Colored_S-102B-updated.pdf PDF
Attch_40_Addend_03_Colored_S-101G.pdf PDF
Attch_50_Addend_03_Colored_S-103A.pdf PDF
Attch_51_Addend_03_Colored_S-103B.pdf PDF
Attch_53_Addend_03_Colored_S-104A.pdf PDF
Attch_35_Addend_03_Colored_S-101B.pdf PDF
Attch_60_Addend_03_Colored_S-105C.pdf PDF
Attch_34_Addend_03_Colored_S-101A.pdf PDF
Attch_64_Addend_03_Colored_S-105G.pdf PDF
Attch_44_Addend_03_Colored_S-102C.pdf PDF
Attch_59_Addend_03_Colored_S-105B.pdf PDF
Attch_46_Addend_03_Colored_S-102E.pdf PDF
Attch_36_Addend_03_Colored_S-101C.pdf PDF
Attch_43_Addend_03_Colored_S-102B.pdf PDF
Attch_42_Addend_03_Colored_S-102A.pdf PDF
Attch_58_Addend_03_Colored_S-105A.pdf PDF
Attch_38_Addend_03_Colored_S-101E.pdf PDF
Attch_57_Addend_03_Colored_S-104E.pdf PDF
Attch_47_Addend_03_Colored_S-102F.pdf PDF
Attch_49_Addend_03_Colored_S-102H.pdf PDF
Attch_52_Addend_03_Colored_S-103C.pdf PDF
Attch_62_Addend_03_Colored_S-105E.pdf PDF
Attch_33_Addend_03_Colored_G-001.pdf PDF
Attch_54_Addend_03_Colored_S-104B.pdf PDF
Attch_63Addend_03_Colored_S-105F.pdf PDF
Attch_56_Addend_03_Colored_S-104D.pdf PDF
Attch_55_Addend_03_Colored_S-104C.pdf PDF
RFI_0002.pdf PDF
FFPAddendum(w_Modifications).pdf PDF
FA8601-15-R-0030_Addendum_Number_02.pdf PDF
Attch__9-Drawings_S-102E_and_S-102F.pdf PDF
Attch__10-Drawings_S-102G_and_S-102H.pdf PDF
Attch__3-Drawings_S-101B_and_S-101C.pdf PDF
Attch_27-Addend_01_Section_01_02_50.pdf PDF
Attch__7-Drawings_S-102A_and_S-102B.pdf PDF
Attch__11-Drawings_S-103_and_S-103A.pdf PDF
Attch__14-Drawings_S-104B_and_S-104C.pdf PDF
Attch_1-Specifications.pdf PDF
Attch_8-Drawings_S-102C_and_S-102D.pdf PDF
Attch__5-Drawings_S-101F_and_S-101G.pdf PDF
Attch_28-Addend_01_Cover_Page.pdf PDF
Attch_25-_Addend_01_DWG_S-301.pdf PDF
Attch_24-_Addend_01_DWG_S-101.pdf PDF
Attch__15-Drawings_S-104D_and_S-104E.pdf PDF
Attch__18-Drawings_S-105D_and_S-105E.pdf PDF
Attch__17-Drawings_S-105B_and_S-105C.pdf PDF
Attch_19-Drawings_S-105F_and_S-105G.pdf PDF
Attch_23-Addendum_Number_01.pdf PDF
Attch__12-Drawings_S-103B_and_S-103C.pdf PDF
Show all 50

Repair-Replace Steam Pipe Stanchions has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WPAFB Steam Stanchions 108001

SECTION 01 01 00

SUMMARY (WPAFB)

3/15

PART 1 - GENERAL

1.01 SCOPE OF WORK

A. The work covered by these specifications consists of furnishing all labor, equipment, appliances, devices and materials, and performing all operations necessary in connection with repair/replace steam stanchions including removals and miscellaneous work as herein specified and as shown, indicated, or noted on the drawings.

B. The work shall conform to the drawings listed in the following schedule.

SCHEDULE OF DRAWINGS

Number Sheet Designation Date Rev Date

GENERAL

01 G-001 DRAWING INDEX AND LOCATION MAPS 6/15

STRUCTURAL

02 S-001 STRUCTURAL GENERAL NOTES 6/15

03 S-101 BULL HEAD STEAM TUNNEL REPAIR LOCATION PLAN 6/15

04 S-101A BULL HEAD TUNNEL PHOTOS/DESCRIPTIONS 6/15

05 S-101B BULL HEAD TUNNEL PHOTOS/DESCRIPTIONS 6/15

06 S-101C BULL HEAD TUNNEL PHOTOS/DESCRIPTIONS 6/15

07 S-101D BULL HEAD TUNNEL PHOTOS/DESCRIPTIONS 6/15

08 S-101E BULL HEAD TUNNEL PHOTOS/DESCRIPTIONS 6/15

09 S-101F BULL HEAD TUNNEL PHOTOS/DESCRIPTIONS 6/15

10 S-101G BULL HEAD TUNNEL PHOTOS/DESCRIPTIONS 6/15

11 S-101H BULL HEAD TUNNEL PHOTOS/DESCRIPTIONS 6/15

12 S-102 56 STEAM TUNNEL REPAIR LOCATION PLAN 6/15

13 S-102A 56 TUNNEL PHOTOS/DESCRIPTIONS 6/15

14 S-102B 56 TUNNEL PHOTOS/DESCRIPTIONS 6/15

15 S-102C 56 TUNNEL PHOTOS/DESCRIPTIONS 6/15

16 S-102D 56 TUNNEL PHOTOS/DESCRIPTIONS 6/15

17 S-102E 56 TUNNEL PHOTOS/DESCRIPTIONS 6/15

18 S-102F 56 TUNNEL PHOTOS/DESCRIPTIONS 6/15

19 S-102G 56 TUNNEL PHOTOS/DESCRIPTIONS 6/15

20 S-102H 56 TUNNEL PHOTOS/DESCRIPTIONS 6/15

21 S-103 52 STEAM TUNNEL REPAIR LOCATION PLAN 6/15

22 S-103A 52 TUNNEL PHOTOS/DESCRIPTIONS 6/15

23 S-103B 52 TUNNEL PHOTOS/DESCRIPTIONS 6/15

24 S-103C 52 TUNNEL PHOTOS/DESCRIPTIONS 6/15

25 S-104 32 CROSSOVER STEAM TUNNEL REPAIR LOCATION PLAN 6/15

26 S-104A 32 CROSSOVER TUNNEL PHOTOS/DESCRIPTIONS 6/15

27 S-104B 32 CROSSOVER TUNNEL PHOTOS/DESCRIPTIONS 6/15

28 S-104C 32 CROSSOVER TUNNEL PHOTOS/DESCRIPTIONS 6/15

29 S-104D 32 CROSSOVER TUNNEL PHOTOS/DESCRIPTIONS 6/15

SECTION 01 01 00 Page 1

30 S-104E 32 CROSSOVER TUNNEL PHOTOS/DESCRIPTIONS 6/15

31 S-105 5th STREET STEAM TUNNEL REPAIR LOCATION PLAN 6/15 32 S-105A 5th STREET TUNNEL PHOTOS/DESCRIPTIONS 6/15 33 S-105B 5th STREET TUNNEL PHOTOS/DESCRIPTIONS 6/15 34 S-105C 5th STREET TUNNEL PHOTOS/DESCRIPTIONS 6/15 35 S-105D 5th STREET TUNNEL PHOTOS/DESCRIPTIONS 6/15 36 S-105E 5th STREET TUNNEL PHOTOS/DESCRIPTIONS 6/15 37 S-105F 5th STREET TUNNEL PHOTOS/DESCRIPTIONS 6/15 38 S-105G 5th STREET TUNNEL PHOTOS/DESCRIPTIONS 6/15

39 S-301 STRUCTURAL CONCRETE REPAIR DETAILS & SECTIONS 6/15

40 S-302 STEEL STANCHION REPAIR DETAILS & SECTIONS 6/15

41 S-303 CONCRETE TUNNEL ELEMENT&STEAM STANCHION REPLACEMENT DETAILS 6/15

1.02 LOCATION

A. The site of the work is Area B Wright-Patterson Air Force Base, Ohio.

1.03 GOVERNMENT FURNISHED PROPERTY

A. No Government furnished property will be included as part of this project.

1.04 REMOVALS AND SALVAGE

A. Remove and dismantle all items which are shown to be removed or which must be removed to complete the work.

B. All materials, equipment, and debris resulting from this work and not designated for reuse in new work, designated to be salvaged for the Government, nor recyclable in accordance with section 01 02 20, shall become the property of the contractor and shall be removed from the work site as it accumulates..

C. The contractor shall properly dispose of removed materials outside Wright-Patterson Air Force Base.

1.05 INSTRUCTIONS TO THE CONTRACTOR

A. The superintendent in charge of this work shall personally contact the contract Inspector 88CEG/CENMP and the Contracting Officer in the operational contracting construction office, a minimum of 72 hours before starting site operations of the contract, before resumption of seasonal work, before restarting work after a lengthy delay, and prior to moving men and equipment from one site of work to another.

B. Work areas to remain occupied by Government personnel are shown on the plans.

a) Bull Head Tunnel

- Electric manhole, electric swich, storm water lines

b) 56 tunnel

- Sanitary sewer junction, wastewater line, storm waer lines, water valve, water line mains, service water line, electric utility lines, electric manhole

c) 5th Street Tunnel

1) (Between Stansions 8&9) Water line, Storm Water Line(s)

2) (Between Stansions 14 & 15) COMM lines, COMM Manhole, Storm Water Line(s), water lines

SECTION 01 01 00 Page 2

3) (Between Stansions 18 & 20) Storm Water Line(s), water lines

4) (Between Stansions 40 & 41) COMM lines, water valve, water mains Electric Utility Lines, Electric Manholes

5) (Between Stansions 46 & 50) COMM lines, COMM Manhole, water line mains, water valves, water service line

6) (Between Stansions 54 & 56) COMM lines, COMM Manhole, electric line, electric manhole, Water Main(s)

7) (Between Stansions 60 & 62) COMM lines, water mains, storm water lines, wastewater line

8) (Between Stansions 65) COMM line

9) (Between Stansions 78 & 83) COMM lines, COMM Manhole, electric lines, electric manhole, storm water line, wastewater line

d) 52 Tunnel

1) (@ Stansion 100) COMM lines, water mains, water service

2) (Between Stansions 81 & 79) COMM lines, COMM Manhole, wastewater line

3) (@ Stansion 67) COMM lines, COMM Manhole, wastewater line

4) (Between Stansions 61 & 62) COMM lines, COMM Manhole, wastewater line, storm water line, electric line

5) (@ Stansion 31) wastewater line, electric manhole

C. The display of signs of a commercial nature within the boundaries of the installation will not be permitted. In no event will the contractor be permitted to use the government installation for the resale of surplus, structures, other improvements, or related equipment.

D. All work must be performed while steam lines are in service; i.e.

active. Steam lines shut downs and outages will not be permitted. The Contractor should plan work required accordingly. Steam lines will be taken out of service (shutdown) by the Government during the first two weeks of June.

E. Existing utilites may be present in areas of excavation for tunnel repairs. Areas of signifigant congestion are noted, however utilites may be present in other aras as well.

The following items shall be complted prior to commencement of excavation:

a) The contractor shall conduct a utility survey in all areas of excavation and submit findings to the Government.

b) the Government will conduct a survey of utilities complete with form

AF 103

c) A "pre-dig" conference shall be conducated with the Contracting Officer's Representative to review planned excavation and repair means and methods.

Where necessary the Contractor shall hand dig around utilities to prevent damage and disruption to service.

F. Construction may encounter rock in areas of excavation. Refer to bid schedule for quanities of rock to inclue in bid.

G. Blasting is expressly prohibited.

END OF SECTION

SECTION 01 01 00 Page 3

SECTION 01 01 00 Page 4