Attch__11-Drawings_S-103_and_S-103A.pdf
PDF 6 MB Posted
- Attached to
- Repair-Replace Steam Pipe Stanchions Federal contract opportunity
- Solicitation number
- FA8601-15-R-0030
About this file
Attch 11-Drawings S-103 and S-103A
View the file
Other files for this federal contract opportunity
Show all 50
Repair-Replace Steam Pipe Stanchions has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S-103
LOCATION PLAN
52 TUNNEL REPAIR
S-103
REPAIR LOCATION PLAN
52 STEAM TUNNEL
NORTH
MATERIALS PRESENT.
THAT MAY HAVE ASBESTOS CONTAINING
CERTAIN ADJOINING HALF ROUND TUNNELS
AREAS OF THE TUNNELS, THERE ARE
BEEN ACCOMPLISHED. HOWEVER, IN FEW
ASBESTOS SURVEY/REMEDIATION HAS
IN MAIN TUNNELS IDENTIFIED IN PROJECT,
NOTE TO CONTRACTOR:
SCALE: 3/16"=1’-0"
PROCEDURES/SPECIFICATIONS.
REMOVED. ANY SEEDING RESTORATIONS SHALL BE PER WPAFB
CONCRETE (SIDEWALK, CURBS) TO MATCH THE EXISTING PROFILES
G. CONTRACTOR SHALL REPLACE ANY DEMOLISHED ASPHALT AND
REQUIREMENTS.
GENERAL NOTES SECTION, "EARTHWORK", FOR ADDITIONAL
SHALE ROCK PRESENCE FOR ALL AREAS OF EXCAVATION. SEE
F. CONTRACTOR SHALL INCLUDE EXCAVATION COSTS FOR 20%
FOR ADDITIONAL REQUIREMENTS PER WPAFB.
E. CONTRACTOR SHALL REFER TO GENERAL NOTES SHEET, S-001,
c. REPAIR METHODS
b. REPAIR MATERIALS
a. CONCRETE REMOVAL METHODS
SCHEDULE OF WORK SHALL FOLLOW INFORMATION IN TABLES:
PERFORMED DURING TUNNEL REPAIR. THE SEQUENCE AND
WORK, THE SEQUENCING AND SCHEDULING OF WORK TO BE
ALL MATERIALS (PROPERTIES) TO BE USED FOR TUNNEL REPAIR
FOR CIVIL WORKS", SECTION 1.4 "SYSTEM DESCRIPTION", FOR
D. REFER TO SPECIFICATION 03 01 32 "CONCRETE REHABILITATION
TO ANY DEMOLITION/NEW WORK THROUGHOUT THE TUNNEL.
C. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR
TUNNEL.
B. INDICATES EVERY 5th STANCHION ALONG LENGTH OF
A. EXTENTS OF 52 TUNNEL REPAIR ASSESSMENT.
SHEET GENERAL NOTES:
(STANCHION)
LOCATIONS
TUNNEL CONCRETE REPLACEMENT
(STANCHION)
LOCATION
SURFACE
TUNNEL
(APPROXIMATE)
LENGTH
CEILING 4’-0"
CEILING 14’-0"BETWEEN 61 & 62
CEILING 7’-0"
CEILING 4’-0"
CEILING 6’-0"
CEILING 10’-0"
APPLICATION LOCATIONS
EXTERNAL/INTERNAL WATERPROOFING
WATERPROOFING
EXTERNAL
WATERPROOFING
INTERNAL
APPLICATION.
2. SEE DETAIL 1/S-301 FOR EXTERNAL WATERPROOFING
WATERPROOFING APPLICATION.
REQUIRED. SEE DETAIL 2/S-301 FOR INTERNAL
ADDITIONAL INTERNAL WATERPROOFING APPLICATIONS ARE
1. LOCATIONS DEPICTED IN CHART ARE LOCATIONS WHERE
NOTES:
1/S-301 EXTERNAL WATERPROOFING APPLICATION DETAIL.
ON S-103 FOR APPLICATION LOCATIONS AND DETAIL
2. FOR EXTERNAL WATERPROOFING APPLICATION, SEE CHART
ALONG TUNNEL CEILING & WALLS.
1. SEE DETAIL 2/S-303 FOR REPLACEMENT OF CONCRETE
NOTES:
EXISTING STANCHION ASSESSMENT
LOCATION
STANCHION
(EXISTING)
REPAIR
CLEAN
(w/ NEW)
REPLACEMENT
(STANCHION)
LOCATIONS
(ALONG TUNNEL LENGTH)
UTILITIES AFFECTED BY EXCAVATIONS
UTILITY TYPE (LINES)
BETWEEN 61 & 62
BETWEEN 79 & 81
DWGS.
5. UTILITIES HAVE BEEN IDENTIFITED PER WPFAB EXISTING UTILITY
ELECTRICAL AND COMMUNICATION (COMM) UTILITIES.
EXTRA PRECAUTION MUST BE TAKEN TO AVOID DAMAGE TO
(PARTICULARLY ELECTRIC AND COMM UTILITIES) IS CRITICAL.
SHORING OF UTILITIES, IF EXCAVATING AROUND UTILITIES
01 01 01, BEFORE EXCAVATION AROUND UTILITIES. PROPER
4. REFERENCE WPAFB SPEC 01 01 50, SECTION 1.4, AND SPEC
EXCAVATION AND REPAIR MEANS AND METHODS.
CONTRACTING OFFICER’S REPRESENTATIVE TO REVIEW PLANNED
C. A "PRE-DIG" CONFERENCE SHALL BE CONDUCTED WITH THE
WITH FORM AF103.
B. THE GOVT. WILL CONDUCT A SURVEY OF UTILITIES COMPLETE
AREAS OF EXCAVATION AND SUBMIT FINDINGS TO THE GOVT.
A. THE CONTRACTOR SHALL CONDUCT A UTILITY SURVEY IN ALL
COMMENCEMENT OF EXCAVATION:
3. THE FOLLOWING ITEMS SHALL BE COMPLETED PRIOR TO
UTILITIES TO PREVENT DAMAGE AND DISRUPTION TO SERVICE
2. WHERE NECESSARY, THE CONTRACTOR SHALL HAND DIG AROUND
AS WELL.
NOTED, HOWEVER UTILITIES MAY BE PRESENT IN OTHER AREAS
FOR TUNNEL REPAIRS. AREAS OF SIGNIFICANT CONGESTION ARE
1. EXISTING UTILITIES MAY BE PRESENT IN AREAS OF EXCAVATION
NOTES:
IN ORIGINAL LOCATION.
3. RE-SECURE THE CONDUIT AND FIXTURES
FIXTURES AS REQUIRED FOR WORK.
2. REMOVE CONDUIT CLAMPS AND LIGHTING
FIXTURES TO MAINTAIN CIRCUITRY.
1. TEMPORARILY SUPPORT THE CONDUIT AND
(NOTE TO CONTRACTOR):
EXISTING ELECTRICAL CONDUIT INTERFERENCE
24, 31, 38, 61, 5, 12, 13, 15, 79, 81, 95
42, 62, 67, 77, 30, 35, 36, 41, 25, 26, 27, 28, 19, 20, 21, 22, 1, 16, 17, 18, 39, 46, 82
33, 34, 37, 23, 29, 32, 3, 7, 9, 14, REMAIN.
EXISTING PIPE ROLLER SUPPORTS AT THESE STANCHIONS SHALL
REPAIR ONLY, SHALL NOT NEED NEW PIPE ROLLER SUPPORTS.
3. EXISTING STANCHIONS (WITHIN 52 STEAM TUNNEL) REQUIRING
EXISTING STANCHIONS THAT SHALL REMAIN.
2. SEE SHEET S-302 FOR REPAIRS METHOD REQUIREMENTS TO
EXISTING STANCHION) DETAIL.
1. SEE DETAIL 1/S-303 FOR NEW STANCHION (REPLACEMENT OF
NOTES:
NEAR 31 WASTEWATER, ELECTRIC MANHOLE
STORM WATER, ELECTRIC
COMM, COMM MANHOLE, WASTEWATER,
NEAR 67 COMM, COMM MANHOLE, WASTEWATER
COMM, COMM MANHOLE, WASTEWATER
NEAR 100 COMM, WATER MAINS, WATER SERVICE
NEAR 31
NEAR 67
NEAR 79
NEAR 81
NEAR 100
-NEAR 100
-NEAR 8
-NEAR 79
-NEAR 67
-BETWEEN 61 & 62
-NEAR 31
-NEAR 100
-NEAR 99
-NEAR 84
-NEAR 82
-NEAR 78
-NEAR 74
-BETWEEN 61 & 62
-NEAR 57
-NEAR 42
-NEAR 7
REPLACEMENT DETAIL.
FOR NEW LADDER INFORMATION AND 5/S-302 FOR LADDER
LADDER. AS APPLICABLE. SEE SPECIFICATION SECTION 05 51 33
LADDERS/RUNGS ALONG VERTICAL FACE OF WALL w/ NEW
REQUIRED. REPAIRS SHALL INCLUDE REPLACING EXISTING
D. LADDER (AT MANHOLE/ACCESS POINTS INTO TUNNEL) REPAIR
PER SHEET S-301.
THROUGH WALL w/ APPLICABLE CONCRETE REPAIR METHODS
OF PIPES THROUGH TUNNEL WALLS. PATCH PENETRATION
SEE S-103A FOR DEPICTION AND LOCATION OF PENETRATION
WALL AND DISPOSE OF PER WPAFB DISPOSAL PROCEDURES.
C. DEMOLISH ABANDONED PIPES PENETRATING THRU TUNNEL
OF CONCRETE TUNNEL REPLACEMENT.
EXTERNAL WATERPROOFING APPLICATIONS AND LOCATIONS
INTERNAL (BEYOND TYPICAL 1’-0" BASE APPLICATION) AND
SEE CHARTS ON S-103 FOR LOCATIONS OF REQUIRED
PORTIONS OF CONCRETE TUNNEL (SEE DETAIL 1/S-301).
REPAIR METHOD), AND EXCAVATION AND REPLACEMENT OF
CORROSION (SEE DETAILS 3B & 3C/S-301 FOR APPLICABLE
CLEANING/REPLACING EXISTING REINFORCING BARS WITH
3A/S-301), PATCH FOR SPALLING CONCRETE AND
ALONG CONCRETE FOR WATER INTRUSION (SEE DETAIL
IS TO OCCUR (SEE DETAIL 1/S-301), INJECTION OF CRACKS
2/S-301), EXTERNAL WATERPROOFING WHERE EXCAVATION
WATERPROOFING THE FACE OF THE TUNNEL (SEE DETAIL
AND SLAB REQUIRED. REPAIRS SHALL INCLUDE INTERNAL
B. CONCRETE REPAIR ALONG THE TUNNEL WALLS, CEILING,
INFORMATION.
SEE SPECIFICATION 23 05 15 FOR APPLICABLE PIPE ROLLER
PIPE ROLLER SUPPORT AT THE NECESSARY PIPE LOCATIONS.
STANCHIONS. NEW STANCHIONS SHALL REQUIRE NEW
REQUIRED ACTION BASED ON ASSESSMENT OF EXISTING
ON S-103 INDICATING STANCHIONS WITHIN TUNNEL AND
REQUIRED. SEE "EXISTING STANCHON ASSESSMENT" CHART
A. EXISTING PIPE STANCHION REPAIR OR FULL REPLACEMENT
DRAWING NOTES:
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
RPR/RPL STEAM STANCHIONS
PROJECT NUMBER ZHTV 090018
SUBMITTAL - 100% GOVT. SUBMITTAL
SPR SPR MSS JUNE 2015
B C
A
A
B
D
D
B
A B D
B
A
B
A
A
A
A
A
B
B
D
(PARALLEL TO H STREET)
DIRECTLY BELOW SIDEWALK
PORTION OF TUNNEL
& PARKING
ROADWAY
SIDEWALK
SIDEWALK
& PARKING
ROADWAY
A
A
A
B
A
B
ASSESSMENT.
DETERMINED PER
OF TUNNEL AS
ALONG THIS PORTION
NO WORK REQUIRED
S-103A
52 TUNNEL PHOTOS/DESCRIPTIONS
EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE
EXISTING CONDITION REPAIR PROCEDUREEXISTING CONDITION REPAIR PROCEDUREEXISTING CONDITION REPAIR PROCEDURE
EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE
103A-c103A-b103A-a
103A-d 103A-e 103A-f
103A-h103A-g
VOID BETWEEN STANCHIONS 61 & 62.
CORRODED REBAR EXPOSED AROUND
VOID IN WALL. CONCRETE SPALL &
ABANDONED PIPES PENETRATING THROUGH
STANCHION 61 & 62.
PRESENT ON CEILING BETWEEN
CEILING. CRACKING & WATER INTRUSION
EXPOSED ALONG UNDERSIDE OF
CONCRETE SPALL & CORRODED REBAR
STANCHION 61 & 62.
PRESENT ON CEILING BETWEEN
CEILING. CRACKING & WATER INTRUSION
EXPOSED ALONG UNDERSIDE OF
CONCRETE SPALL & CORRODED REBAR
CEILING & WALL AT STANCHION 31.
EXPOSED ALONG JOINT & CRACK IN
CONCRETE SPALL & CORRODED REBAR
CEILING & WALL AT STANCHION 31.
EXPOSED ALONG JOINT & CRACK ALONG
CONCRETE SPALL & CORRODED REBAR
STANCHIONS 81 & 82.
PRESENT WITHIN CEILING BETWEEN
UNDERSIDE OF CEILING. WATER INTRUSION
& CORRODED REBAR EXPOSED ALONG
CONCRETE SPALL w/ CALCIUM BUILDUP
CEILING AT STANCHION 100.
& WATER INTRUSION PRESENT WITHIN
AROUND VOID IN CEILING. CORROSION
CONCRETE SPALL & CRACKING
STANCHION 61 & 62.
AT SPALL LOCATION BETWEEN
CEILING. EXISTING PATCH WORK PRESENT
EXPOSED ALONG UNDERSIDE OF
CONCRETE SPALL & CORRODED REBAR
WATERPROOFING APPLICATION.
DETAIL AND 1/S-301 FOR EXTERNAL
FOR REPLACEMENT OF CONCRETE TUNNEL
PENETRATING THROUGH WALL. SEE 2/S-303
DEMOLISH ALL EXISTING CORRODED STEEL
OF CONCRETE TUNNEL DETAIL.
APPLICATION AND 2/S-303 FOR REPLACEMENT
SEE 1/S-301 FOR EXTERNAL WATERPROOFING
OF CONCRETE TUNNEL DETAIL.
APPLICATION AND 2/S-303 FOR REPLACEMENT
SEE 1/S-301 FOR EXTERNAL WATERPROOFING
OF CONCRETE TUNNEL DETAIL.
APPLICATION AND 2/S-303 FOR REPLACEMENT
SEE 1/S-301 FOR EXTERNAL WATERPROOFING
OF CONCRETE TUNNEL DETAIL.
APPLICATION AND 2/S-303 FOR REPLACEMENT
SEE 1/S-301 FOR EXTERNAL WATERPROOFING
OF CONCRETE TUNNEL DETAIL.
APPLICATION AND 2/S-303 FOR REPLACEMENT
SEE 1/S-301 FOR EXTERNAL WATERPROOFING
OF THE STANCHION.
THE BASE OF THE WALL & AROUND THE BASE
2. CLEAN ALL LOOSE PIECES OF DEBRIS FROM
COATING.
APPLICATION OF A CORROSION RESISTANT
STEEL SHALL BE CLEANED TO ALLOW FOR
STANCHIONS (TO REMAIN) SHALL BE REMOVED.
1. ALL CORROSION PRESENT ON EXISTING STEEL
NOTES:
OF CONCRETE TUNNEL DETAIL.
APPLICATION AND 2/S-303 FOR REPLACEMENT
SEE 1/S-301 FOR EXTERNAL WATERPROOFING
OF CONCRETE TUNNEL DETAIL.
APPLICATION AND 2/S-303 FOR REPLACEMENT
SEE 1/S-301 FOR EXTERNAL WATERPROOFING
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
RPR/RPL STEAM STANCHIONS
PROJECT NUMBER ZHTV 090018
SUBMITTAL - 100% GOVT. SUBMITTAL