Attch__9-Drawings_S-102E_and_S-102F.pdf

PDF 11 MB Posted

Attached to
Repair-Replace Steam Pipe Stanchions Federal contract opportunity
Solicitation number
FA8601-15-R-0030
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

Attch 9-Drawings S-102E and S-102F

View the file

Other files for this federal contract opportunity

Other files attached to Repair-Replace Steam Pipe Stanchions, newest first.
File Type Posted
Attch_63Addend_03_Colored_S-105F-updated.pdf PDF
Attch_61_Addend_03_Colored_S-105D-updated.pdf PDF
Attch_42_Addend_03_Colored_S-102A-updated.pdf PDF
Attch_43_Addend_03_Colored_S-102B-updated.pdf PDF
Attch_45_Addend_03_Colored_S-102D.pdf PDF
FA8601-15-R-0030-0002_Amendment_2.pdf PDF
Attch_39_Addend_03_Colored_S-101F.pdf PDF
Attch_61_Addend_03_Colored_S-105D.pdf PDF
Attch_41_Addend_03_Colored_S-101H.pdf PDF
Attch_37_Addend_03_Colored_S-101D.pdf PDF
Attch_48_Addend_03_Colored_S-102G.pdf PDF
Attch_59_Addend_03_Colored_S-105B.pdf PDF
Attch_46_Addend_03_Colored_S-102E.pdf PDF
Attch_36_Addend_03_Colored_S-101C.pdf PDF
Attch_43_Addend_03_Colored_S-102B.pdf PDF
Attch_42_Addend_03_Colored_S-102A.pdf PDF
Attch_58_Addend_03_Colored_S-105A.pdf PDF
Attch_38_Addend_03_Colored_S-101E.pdf PDF
Attch_57_Addend_03_Colored_S-104E.pdf PDF
Attch_47_Addend_03_Colored_S-102F.pdf PDF
Attch_49_Addend_03_Colored_S-102H.pdf PDF
Attch_52_Addend_03_Colored_S-103C.pdf PDF
Attch_40_Addend_03_Colored_S-101G.pdf PDF
Attch_50_Addend_03_Colored_S-103A.pdf PDF
Attch_51_Addend_03_Colored_S-103B.pdf PDF
Attch_53_Addend_03_Colored_S-104A.pdf PDF
RFI_0001.pdf PDF
RFI_0002.pdf PDF
108001-00181-S-303.pdf PDF
FA8601-15-R-0030_Addendum_Number_02.pdf PDF
Sign_In_Sheet_FA8601-15-R-0030.pdf PDF
Rules_of_Engagement.pdf PDF
Attch__16-Drawings_S-105_and_S-105A.pdf PDF
Attch__22-General_Decision_Number_OH150002_OH2_12-Jun-15.pdf PDF
Attch_2-Drawings_G-001_S-001_S-101_and_S-101A.pdf PDF
Attch__13-Drawings_S-104_and_S-104A.pdf PDF
Attch_29_Addend_01_Table_of_Contents.pdf PDF
FA8601-15-R-0030.pdf PDF
Attch__20-Drawings_S-301_and_S-302.pdf PDF
Attch__6-Drawings_S-101H_and_S-102.pdf PDF
Attch__21-Drawings_S-303.pdf PDF
Attch__14-Drawings_S-104B_and_S-104C.pdf PDF
Attch_1-Specifications.pdf PDF
Attch_8-Drawings_S-102C_and_S-102D.pdf PDF
Attch__5-Drawings_S-101F_and_S-101G.pdf PDF
Attch_28-Addend_01_Cover_Page.pdf PDF
Attch_25-_Addend_01_DWG_S-301.pdf PDF
Attch_24-_Addend_01_DWG_S-101.pdf PDF
Attch__15-Drawings_S-104D_and_S-104E.pdf PDF
Attch_26-Addend_01_Section_01_01_00.pdf PDF
Show all 50

Repair-Replace Steam Pipe Stanchions has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S-102E

56 TUNNEL PHOTOS/DESCRIPTIONS

COORDINATOR ENGINEERING CHIEF

DATE REVISION BYNO. DATE NO. REVISION BY

C I

V

IL

ENGI

N

E E

R

US AF

WRIGHT-PATTERSON AIR FORCE BASE

88TH ABW

OF

DESIGN CHIEF

DATEDRAWNDESIGNED CHECKED

RPR/RPL STEAM STANCHIONS

PROJECT NUMBER ZHTV 090018

SUBMITTAL - 100% GOVT. SUBMITTAL

SPR SPR MSS JUNE 2015

EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE

EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE

EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE

BASE OF TUNNEL

STANDING WATER PRESENT ALONG

TOWARDS STANCHION 90 &

VIEW DOWN LENGTH OF TUNNEL

102E-a 102E-b 102E-c

102E-f102E-e102E-d

102E-g 102E-h

AT STANCHION 85.

CORROSION & LOSS OF STEEL SECTION

LEGS & CONNECTION CHANNELS HAVE

OF TUNNEL. BASE OF VERTICAL SUPPORT

STANDING WATER PRESENT ALONG BASE

WIDTH OF CEILING AT STANCHION 86.

& WATER INTRUSION PRESENT ALONG

& LOSS OF STEEL SECTION. CRACKING

HORIZONTAL ROD SUPPORT HAVE CORROSION

TOP OF VERTICAL SUPPORT LEGS &

SUPPORT AT STANCHION 87.

SUPPORT MISSING ON BOTTOM HORIZONTAL

LOSS OF STEEL SECTION. PIPE ROLLER

& CONNECTION PLATES HAVE CORROSION &

TUNNEL. BASE OF VERTICAL SUPPORT LEGS

STANDING WATER PRESENT ALONG BASE OF

ALONG WIDTH OF CEILING AT STANCHION 88.

LEGS. CRACKING & WATER INTRUSION PRESENT

SUPPORT NOT BEARING AT VERTICAL SUPPORT

& LOSS OF STEEL SECTION. TOP HORIZONTAL ROD

TOP PORTION OF SUPPORT LEGS HAVE CORROSION

STEEL SECTION AT STANCHION 88.

LEGS HAVE CORROSION & LOSS OF

OF TUNNEL. BASE OF VERTICAL SUPPORT

STANDING WATER PRESENT ALONG BASE

AT STANCHION 89.

CORROSION & LOSS OF STEEL SECTION

LEGS & CONNECTION CHANNELS HAVE

OF TUNNEL. BASE OF VERTICAL SUPPORT

STANDING WATER PRESENT ALONG BASE

SECTION AT STANCHION 89.

CORROSION & LOSS OF STEEL

& HORIZONTAL ROD SUPPORT HAVE

TOP OF VERTICAL SUPPORT LEGS

1/S-303 FOR REPLACEMENT OF STANCHION DETAIL.

CLEAN AREA ADJACENT TO EXISTING STANCHION. SEE

REMOVE ALL STANDING WATER PRIOR TO NEW WORK.

PERFORMACE EFFICIENCY.

ROUTINE OBSERVATION TO SUMP PUMP FOR

NEED REPLACED. WPAFB MAINTENANCE TO PROVIDE

SUMP PUMP FUNCTIONS PROPERLY & DOES NOT

PER CONVERSATION w/ WPAFB TUNNEL MAINTENANCE, INJECTION REPAIR DETAIL.

DETAIL & 3A/S-301 FOR CONCRETE CRACK

SEE 1/S-303 FOR REPLACEMENT OF STANCHION

CLEAN AREA ADJACENT TO EXISTING STANCHION.

DETAIL.

SEE 1/S-303 FOR REPLACEMENT OF STANCHION

CLEAN AREA ADJACENT TO EXISTING STANCHION.

REMOVE ALL STANDING WATER PRIOR TO NEW WORK.

WATERPROOFING APPLICATION.

INJECTION REPAIR, AND 2/S-301 FOR INTERNAL

DETAIL, 3A/S-301 FOR CONCRETE CRACK

SEE 1/S-303 FOR REPLACEMENT OF STANCHION

CLEAN AREA ADJACENT TO EXISTING STANCHION.

1/S-303 FOR REPLACEMENT OF STANCHION DETAIL.

CLEAN AREA ADJACENT TO EXISTING STANCHION. SEE

REMOVE ALL STANDING WATER PRIOR TO NEW WORK.

OF THE STANCHION.

THE BASE OF THE WALL & AROUND THE BASE

2. CLEAN ALL LOOSE PIECES OF DEBRIS FROM

COATING.

APPLICATION OF A CORROSION RESISTANT

STEEL SHALL BE CLEANED TO ALLOW FOR

STANCHIONS (TO REMAIN) SHALL BE REMOVED.

1. ALL CORROSION PRESENT ON EXISTING STEEL

NOTES:

1/S-303 FOR REPLACEMENT OF STANCHION DETAIL.

CLEAN AREA ADJACENT TO EXISTING STANCHION. SEE

REMOVE ALL STANDING WATER PRIOR TO NEW WORK.

1/S-303 FOR REPLACEMENT OF STANCHION DETAIL.

CLEAN AREA ADJACENT TO EXISTING STANCHION. SEE

S-102F

56 TUNNEL PHOTOS/DESCRIPTIONS

COORDINATOR ENGINEERING CHIEF

DATE REVISION BYNO. DATE NO. REVISION BY

C I

V

IL

ENGI

N

E E

R

US AF

WRIGHT-PATTERSON AIR FORCE BASE

88TH ABW

OF

DESIGN CHIEF

DATEDRAWNDESIGNED CHECKED

RPR/RPL STEAM STANCHIONS

PROJECT NUMBER ZHTV 090018

SUBMITTAL - 100% GOVT. SUBMITTAL

SPR SPR MSS JUNE 2015

EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE

EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE

EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE

102F-b 102F-c

102F-f102F-e102F-d

102F-g 102F-h

CEILING NEAR STANCHION 90.

CRACKING ALONG WALL &

CONCRETE HONEYCOMBING &

INSULATED PIPE AT STANCHION 58.

TUNNEL OF ABANDONED

VIEW DOWN LENGTH OF

STANCHION 72.

UNINSULATED PIPE AT

102F-a

SECTION NEAR STANCHION 83.

CORROSION & LOSS OF STEEL

DUCT BANK SUPPORT STEEL HAS

AT STANCHION 90.

CORROSION & LOSS OF STEEL SECTION

LEGS & CONNECTION CHANNELS HAVE

OF TUNNEL. BASE OF VERTICAL SUPPORT

STANDING WATER PRESENT ALONG BASE

SPECS FOR PROPER DISPOSAL.

PIPING FROM STANCHIONS. REFER TO

63.

& TURNS VERTICAL) AT STANCHION

INSULATED PIPE (PIPE BENDS

TO SPECS FOR PROPER DISPOSAL.

PIPING FROM STANCHIONS. REFER

TO SPECS FOR PROPER DISPOSAL.

PIPING FROM STANCHIONS. REFER

PIPING BELOW NEAR STANCHION 83.

STEEL FALLEN OFF & RESTING ON

THROUGH TUNNEL WALLS. CORRODED

CEILING BETWEEN & PENETRATING

EXISTING DUCT BANK ALONG BOTTOM OF

OF STANCHION DETAIL

STANCHION. SEE 1/S-303 FOR REPLACEMENT

WORK. CLEAN AREA ADJACENT TO EXISTING

REMOVE ALL STANDING WATER PRIOR TO NEW

CONCRETE SURFACE SPALL REPAIR DETAIL.

REPAIR DETAIL AND 3B & 3C/S-301 FOR

SEE 3A/S-301 FOR CONCRETE CRACK INJECTION

3C/S-301 FOR CONCRETE SURFACE SPALL REPAIR DETAIL.

INTERNAL WATERPROOFING APPLICATION AND 3B &

TO SPECS FOR PROPER DISPOSAL. SEE 2/S-301 FOR

REMOVE PIPING TO UNDERSIDE OF CEILING SLAB. REFER

EXISTING DUCT BANK SUPPORT.

REMOVE ALL PIECES OF CORRODED STEEL FROM

DETAIL.

REFERENCE TO STEEL STANCHION REPLACEMENT

EXISTING DUCT BANK SUPPORT. SEE 1/S-303 FOR

REMOVE ALL PIECES OF CORRODED STEEL FROM

OF THE STANCHION.

THE BASE OF THE WALL & AROUND THE BASE

2. CLEAN ALL LOOSE PIECES OF DEBRIS FROM

COATING.

APPLICATION OF A CORROSION RESISTANT

STEEL SHALL BE CLEANED TO ALLOW FOR

STANCHIONS (TO REMAIN) SHALL BE REMOVED.

1. ALL CORROSION PRESENT ON EXISTING STEEL