Attch__15-Drawings_S-104D_and_S-104E.pdf
PDF 9 MB Posted
- Attached to
- Repair-Replace Steam Pipe Stanchions Federal contract opportunity
- Solicitation number
- FA8601-15-R-0030
About this file
Attch 15-Drawings S-104D and S-104E
View the file
Other files for this federal contract opportunity
Show all 50
Repair-Replace Steam Pipe Stanchions has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S-104D
PHOTOS/DESCRIPTIONS
32 CROSSOVER TUNNEL
EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE
EXISTING CONDITION REPAIR PROCEDUREEXISTING CONDITION REPAIR PROCEDUREEXISTING CONDITION REPAIR PROCEDURE
EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE
104D-h104D-g
104D-d 104D-e 104D-f
104D-c104D-b104D-a
UNINSULATED PIPE AT STANCHION 38. UNINSULATED PIPE AT STANCHION 30. UNINSULATED PIPE AT STANCHION 31.
CEILING AT STANCHION 21.
PRESENT AROUND PENETRATION & ALONG
WALL. CRACKING & WATER INTRUSION
ABANDONED PIPE PENETRATING THROUGH
BETWEEN STANCHIONS 22 & 23.
INTRUSION PRESENT AT PENETRATION
w/ CALCIUM BUILDUP & WATER
WALL. CONCRETE SPALL & CRACKING
ABANDONED PIPE PENETRATING THROUGH
CEILING BETWEEN STANCHIONS 22 & 23.
INTRUSION PRESENT ALONG WALL &
CRACKING w/ CALCIUM BUILDUP & WATER
THROUGH WALL. CONCRETE SPALL &
ABANDONED PIPES PENETRATING
TO SPECS FOR PROPER DISPOSAL.
PIPING FROM STANCHIONS. REFER
TO SPECS FOR PROPER DISPOSAL.
PIPING FROM STANCHIONS. REFER
TO SPECS FOR PROPER DISPOSAL.
PIPING FROM STANCHIONS. REFER
CEILING BETWEEN STANCHIONS 22 & 23.
INTRUSION PRESENT ALONG WALL &
CRACKING w/ CALCIUM BUILDUP & WATER
WALL. EXISTING CONCRETE PATCH WORK &
ABANDONED PIPES PENETRATING THROUGH
CONCRETE AT OPENING NEAR STANCHION 34.
WATER INTRUSION PRESENT THROUGHOUT
& HORIZONTAL FACES OF ACCESS OPENING.
EXPOSED AROUND & THROUGHOUT VERTICAL
CONCRETE SPALL & CORRODED REBAR
OF THE STANCHION.
THE BASE OF THE WALL & AROUND THE BASE
2. CLEAN ALL LOOSE PIECES OF DEBRIS FROM
COATING.
APPLICATION OF A CORROSION RESISTANT
STEEL SHALL BE CLEANED TO ALLOW FOR
STANCHIONS (TO REMAIN) SHALL BE REMOVED.
1. ALL CORROSION PRESENT ON EXISTING STEEL
NOTES:
INTERNAL WATERPROOFING APPLICATION.
INCLUDING CRACK INJECTION, SURFACE REPAIR, AND
SEE SHEET S-301 FOR CONCRETE REPAIR METHODS
WALL. REFER TO SPECS FOR PROPER DISPOSAL.
DEMOLISH ALL EXISTING PIPE PENETRATING THROUGH
INTERNAL WATERPROOFING APPLICATION.
INCLUDING CRACK INJECTION, SURFACE REPAIR, AND
SEE SHEET S-301 FOR CONCRETE REPAIR METHODS
WALL. REFER TO SPECS FOR PROPER DISPOSAL.
DEMOLISH ALL EXISTING PIPE PENETRATING THROUGH
INTERNAL WATERPROOFING APPLICATION.
INCLUDING CRACK INJECTION, SURFACE REPAIR, AND
SEE SHEET S-301 FOR CONCRETE REPAIR METHODS
WALL. REFER TO SPECS FOR PROPER DISPOSAL.
DEMOLISH ALL EXISTING PIPE PENETRATING THROUGH
INTERNAL WATERPROOFING APPLICATION.
INCLUDING CRACK INJECTION, SURFACE REPAIR, AND
SEE SHEET S-301 FOR CONCRETE REPAIR METHODS
WALL. REFER TO SPECS FOR PROPER DISPOSAL.
DEMOLISH ALL EXISTING PIPE PENETRATING THROUGH
APPLICATION DETAIL.
REPAIR, & 2/S-301 FOR INTERNAL WATERPROOFING
REPAIR PROCEDURE, 2/S-301 FOR CRACK INJECTION
SEE DETAIL 3B & 3C/S-301 FOR SURFACE SPALL
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
RPR/RPL STEAM STANCHIONS
PROJECT NUMBER ZHTV 090018
SUBMITTAL - 100% GOVT. SUBMITTAL
SPR SPR MSS JUNE 2015
S-104E
PHOTOS/DESCRIPTIONS
32 CROSSOVER TUNNEL
EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE
EXISTING CONDITION REPAIR PROCEDURE
EXISTING CONDITION REPAIR PROCEDURE
104E-d
104E-c104E-b104E-a
STANCHION 34.
EXPOSED THROUGHOUT CEILING AT
CONCRETE SPALL & CORRODED REBAR
STANCHIONS 31 & 32.
THROUGHOUT WALL & CEILING BETWEEN
BUILDUP & WATER INTRUSION PRESENT
CORRODED REBAR EXPOSED. CALCIUM
CONCRETE SPALL & CRACKING w/
STANCHION 14.
WORK THROUGHOUT CEILING AT
EXPOSED w/ EXISTING CONCRETE PATCH
CONCRETE SPALL & CORRODED REBAR
OF THE STANCHION.
THE BASE OF THE WALL & AROUND THE BASE
2. CLEAN ALL LOOSE PIECES OF DEBRIS FROM
COATING.
APPLICATION OF A CORROSION RESISTANT
STEEL SHALL BE CLEANED TO ALLOW FOR
STANCHIONS (TO REMAIN) SHALL BE REMOVED.
1. ALL CORROSION PRESENT ON EXISTING STEEL
NOTES:
AT BASE OF VERTICAL SUPPORTS.
STANCHION REPAIR DETAIL FOR CORROSION
SEE SHEET S-302 FOR APPLICABLE
SUPPORT LEGS AT STANCHION 30.
MINOR CORROSION AT BASE OF VERTICAL
WATERPROOFING APPLICATION DETAIL.
SPALL REPAIR DETAIL & 2/S-301 FOR INTERNAL
SEE 3B & 3C/S-301 FOR CONCRETE SURFACE
WATERPROOFING APPLICATION DETAIL.
SPALL REPAIR DETAIL & 2/S-301 FOR INTERNAL
SEE 3B & 3C/S-301 FOR CONCRETE SURFACE
WATERPROOFING APPLICATION DETAIL.
SPALL REPAIR DETAIL & 2/S-301 FOR INTERNAL
SEE 3B & 3C/S-301 FOR CONCRETE SURFACE
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
RPR/RPL STEAM STANCHIONS
PROJECT NUMBER ZHTV 090018
SUBMITTAL - 100% GOVT. SUBMITTAL
SPR SPR MSS JUNE 2015
File details come from the government source that posted it. Updated .