Attch__15-Drawings_S-104D_and_S-104E.pdf

PDF 9 MB Posted

Attached to
Repair-Replace Steam Pipe Stanchions Federal contract opportunity
Solicitation number
FA8601-15-R-0030
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

Attch 15-Drawings S-104D and S-104E

View the file

Other files for this federal contract opportunity

Other files attached to Repair-Replace Steam Pipe Stanchions, newest first.
File Type Posted
Attch_63Addend_03_Colored_S-105F-updated.pdf PDF
Attch_61_Addend_03_Colored_S-105D-updated.pdf PDF
Attch_62_Addend_03_Colored_S-105E.pdf PDF
Attch_33_Addend_03_Colored_G-001.pdf PDF
Attch_54_Addend_03_Colored_S-104B.pdf PDF
Attch_63Addend_03_Colored_S-105F.pdf PDF
Attch_56_Addend_03_Colored_S-104D.pdf PDF
Attch_55_Addend_03_Colored_S-104C.pdf PDF
Attch_45_Addend_03_Colored_S-102D.pdf PDF
FA8601-15-R-0030-0002_Amendment_2.pdf PDF
Attch_39_Addend_03_Colored_S-101F.pdf PDF
Attch_61_Addend_03_Colored_S-105D.pdf PDF
Attch_41_Addend_03_Colored_S-101H.pdf PDF
Attch_37_Addend_03_Colored_S-101D.pdf PDF
Attch_48_Addend_03_Colored_S-102G.pdf PDF
Attch_59_Addend_03_Colored_S-105B.pdf PDF
Attch_46_Addend_03_Colored_S-102E.pdf PDF
Attch_36_Addend_03_Colored_S-101C.pdf PDF
Attch_43_Addend_03_Colored_S-102B.pdf PDF
Attch_42_Addend_03_Colored_S-102A.pdf PDF
Attch_58_Addend_03_Colored_S-105A.pdf PDF
Attch_38_Addend_03_Colored_S-101E.pdf PDF
Attch_57_Addend_03_Colored_S-104E.pdf PDF
RFI_0001.pdf PDF
RFI_0002.pdf PDF
108001-00181-S-303.pdf PDF
FA8601-15-R-0030_Addendum_Number_02.pdf PDF
Sign_In_Sheet_FA8601-15-R-0030.pdf PDF
Rules_of_Engagement.pdf PDF
Attch__18-Drawings_S-105D_and_S-105E.pdf PDF
Attch__17-Drawings_S-105B_and_S-105C.pdf PDF
Attch_19-Drawings_S-105F_and_S-105G.pdf PDF
Attch_23-Addendum_Number_01.pdf PDF
Attch__12-Drawings_S-103B_and_S-103C.pdf PDF
Attch__16-Drawings_S-105_and_S-105A.pdf PDF
Attch__22-General_Decision_Number_OH150002_OH2_12-Jun-15.pdf PDF
Attch_2-Drawings_G-001_S-001_S-101_and_S-101A.pdf PDF
Attch__13-Drawings_S-104_and_S-104A.pdf PDF
Attch_29_Addend_01_Table_of_Contents.pdf PDF
FA8601-15-R-0030.pdf PDF
Attch__20-Drawings_S-301_and_S-302.pdf PDF
Attch__6-Drawings_S-101H_and_S-102.pdf PDF
Attch__21-Drawings_S-303.pdf PDF
Attch__14-Drawings_S-104B_and_S-104C.pdf PDF
Attch_1-Specifications.pdf PDF
Attch_8-Drawings_S-102C_and_S-102D.pdf PDF
Attch__5-Drawings_S-101F_and_S-101G.pdf PDF
Attch_28-Addend_01_Cover_Page.pdf PDF
Attch_25-_Addend_01_DWG_S-301.pdf PDF
Attch_24-_Addend_01_DWG_S-101.pdf PDF
Show all 50

Repair-Replace Steam Pipe Stanchions has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S-104D

PHOTOS/DESCRIPTIONS

32 CROSSOVER TUNNEL

EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE

EXISTING CONDITION REPAIR PROCEDUREEXISTING CONDITION REPAIR PROCEDUREEXISTING CONDITION REPAIR PROCEDURE

EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE

104D-h104D-g

104D-d 104D-e 104D-f

104D-c104D-b104D-a

UNINSULATED PIPE AT STANCHION 38. UNINSULATED PIPE AT STANCHION 30. UNINSULATED PIPE AT STANCHION 31.

CEILING AT STANCHION 21.

PRESENT AROUND PENETRATION & ALONG

WALL. CRACKING & WATER INTRUSION

ABANDONED PIPE PENETRATING THROUGH

BETWEEN STANCHIONS 22 & 23.

INTRUSION PRESENT AT PENETRATION

w/ CALCIUM BUILDUP & WATER

WALL. CONCRETE SPALL & CRACKING

ABANDONED PIPE PENETRATING THROUGH

CEILING BETWEEN STANCHIONS 22 & 23.

INTRUSION PRESENT ALONG WALL &

CRACKING w/ CALCIUM BUILDUP & WATER

THROUGH WALL. CONCRETE SPALL &

ABANDONED PIPES PENETRATING

TO SPECS FOR PROPER DISPOSAL.

PIPING FROM STANCHIONS. REFER

TO SPECS FOR PROPER DISPOSAL.

PIPING FROM STANCHIONS. REFER

TO SPECS FOR PROPER DISPOSAL.

PIPING FROM STANCHIONS. REFER

CEILING BETWEEN STANCHIONS 22 & 23.

INTRUSION PRESENT ALONG WALL &

CRACKING w/ CALCIUM BUILDUP & WATER

WALL. EXISTING CONCRETE PATCH WORK &

ABANDONED PIPES PENETRATING THROUGH

CONCRETE AT OPENING NEAR STANCHION 34.

WATER INTRUSION PRESENT THROUGHOUT

& HORIZONTAL FACES OF ACCESS OPENING.

EXPOSED AROUND & THROUGHOUT VERTICAL

CONCRETE SPALL & CORRODED REBAR

OF THE STANCHION.

THE BASE OF THE WALL & AROUND THE BASE

2. CLEAN ALL LOOSE PIECES OF DEBRIS FROM

COATING.

APPLICATION OF A CORROSION RESISTANT

STEEL SHALL BE CLEANED TO ALLOW FOR

STANCHIONS (TO REMAIN) SHALL BE REMOVED.

1. ALL CORROSION PRESENT ON EXISTING STEEL

NOTES:

INTERNAL WATERPROOFING APPLICATION.

INCLUDING CRACK INJECTION, SURFACE REPAIR, AND

SEE SHEET S-301 FOR CONCRETE REPAIR METHODS

WALL. REFER TO SPECS FOR PROPER DISPOSAL.

DEMOLISH ALL EXISTING PIPE PENETRATING THROUGH

INTERNAL WATERPROOFING APPLICATION.

INCLUDING CRACK INJECTION, SURFACE REPAIR, AND

SEE SHEET S-301 FOR CONCRETE REPAIR METHODS

WALL. REFER TO SPECS FOR PROPER DISPOSAL.

DEMOLISH ALL EXISTING PIPE PENETRATING THROUGH

INTERNAL WATERPROOFING APPLICATION.

INCLUDING CRACK INJECTION, SURFACE REPAIR, AND

SEE SHEET S-301 FOR CONCRETE REPAIR METHODS

WALL. REFER TO SPECS FOR PROPER DISPOSAL.

DEMOLISH ALL EXISTING PIPE PENETRATING THROUGH

INTERNAL WATERPROOFING APPLICATION.

INCLUDING CRACK INJECTION, SURFACE REPAIR, AND

SEE SHEET S-301 FOR CONCRETE REPAIR METHODS

WALL. REFER TO SPECS FOR PROPER DISPOSAL.

DEMOLISH ALL EXISTING PIPE PENETRATING THROUGH

APPLICATION DETAIL.

REPAIR, & 2/S-301 FOR INTERNAL WATERPROOFING

REPAIR PROCEDURE, 2/S-301 FOR CRACK INJECTION

SEE DETAIL 3B & 3C/S-301 FOR SURFACE SPALL

COORDINATOR ENGINEERING CHIEF

DATE REVISION BYNO. DATE NO. REVISION BY

C I

V

IL

ENGI

N

E E

R

US AF

WRIGHT-PATTERSON AIR FORCE BASE

88TH ABW

OF

DESIGN CHIEF

DATEDRAWNDESIGNED CHECKED

RPR/RPL STEAM STANCHIONS

PROJECT NUMBER ZHTV 090018

SUBMITTAL - 100% GOVT. SUBMITTAL

SPR SPR MSS JUNE 2015

S-104E

PHOTOS/DESCRIPTIONS

32 CROSSOVER TUNNEL

EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE

EXISTING CONDITION REPAIR PROCEDURE

EXISTING CONDITION REPAIR PROCEDURE

104E-d

104E-c104E-b104E-a

STANCHION 34.

EXPOSED THROUGHOUT CEILING AT

CONCRETE SPALL & CORRODED REBAR

STANCHIONS 31 & 32.

THROUGHOUT WALL & CEILING BETWEEN

BUILDUP & WATER INTRUSION PRESENT

CORRODED REBAR EXPOSED. CALCIUM

CONCRETE SPALL & CRACKING w/

STANCHION 14.

WORK THROUGHOUT CEILING AT

EXPOSED w/ EXISTING CONCRETE PATCH

CONCRETE SPALL & CORRODED REBAR

OF THE STANCHION.

THE BASE OF THE WALL & AROUND THE BASE

2. CLEAN ALL LOOSE PIECES OF DEBRIS FROM

COATING.

APPLICATION OF A CORROSION RESISTANT

STEEL SHALL BE CLEANED TO ALLOW FOR

STANCHIONS (TO REMAIN) SHALL BE REMOVED.

1. ALL CORROSION PRESENT ON EXISTING STEEL

NOTES:

AT BASE OF VERTICAL SUPPORTS.

STANCHION REPAIR DETAIL FOR CORROSION

SEE SHEET S-302 FOR APPLICABLE

SUPPORT LEGS AT STANCHION 30.

MINOR CORROSION AT BASE OF VERTICAL

WATERPROOFING APPLICATION DETAIL.

SPALL REPAIR DETAIL & 2/S-301 FOR INTERNAL

SEE 3B & 3C/S-301 FOR CONCRETE SURFACE

WATERPROOFING APPLICATION DETAIL.

SPALL REPAIR DETAIL & 2/S-301 FOR INTERNAL

SEE 3B & 3C/S-301 FOR CONCRETE SURFACE

WATERPROOFING APPLICATION DETAIL.

SPALL REPAIR DETAIL & 2/S-301 FOR INTERNAL

SEE 3B & 3C/S-301 FOR CONCRETE SURFACE

COORDINATOR ENGINEERING CHIEF

DATE REVISION BYNO. DATE NO. REVISION BY

C I

V

IL

ENGI

N

E E

R

US AF

WRIGHT-PATTERSON AIR FORCE BASE

88TH ABW

OF

DESIGN CHIEF

DATEDRAWNDESIGNED CHECKED

RPR/RPL STEAM STANCHIONS

PROJECT NUMBER ZHTV 090018

SUBMITTAL - 100% GOVT. SUBMITTAL

SPR SPR MSS JUNE 2015