Attch__3-Drawings_S-101B_and_S-101C.pdf

PDF 13 MB Posted

Attached to
Repair-Replace Steam Pipe Stanchions Federal contract opportunity
Solicitation number
FA8601-15-R-0030
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

Attch 3-Drawings S-101B and S-101C

View the file

Other files for this federal contract opportunity

Other files attached to Repair-Replace Steam Pipe Stanchions, newest first.
File Type Posted
Attch_42_Addend_03_Colored_S-102A-updated.pdf PDF
Attch_43_Addend_03_Colored_S-102B-updated.pdf PDF
Attch_62_Addend_03_Colored_S-105E.pdf PDF
Attch_33_Addend_03_Colored_G-001.pdf PDF
Attch_54_Addend_03_Colored_S-104B.pdf PDF
Attch_63Addend_03_Colored_S-105F.pdf PDF
Attch_56_Addend_03_Colored_S-104D.pdf PDF
Attch_55_Addend_03_Colored_S-104C.pdf PDF
Attch_59_Addend_03_Colored_S-105B.pdf PDF
Attch_46_Addend_03_Colored_S-102E.pdf PDF
Attch_36_Addend_03_Colored_S-101C.pdf PDF
Attch_43_Addend_03_Colored_S-102B.pdf PDF
Attch_42_Addend_03_Colored_S-102A.pdf PDF
Attch_58_Addend_03_Colored_S-105A.pdf PDF
Attch_38_Addend_03_Colored_S-101E.pdf PDF
Attch_57_Addend_03_Colored_S-104E.pdf PDF
Attch_47_Addend_03_Colored_S-102F.pdf PDF
Attch_49_Addend_03_Colored_S-102H.pdf PDF
Attch_52_Addend_03_Colored_S-103C.pdf PDF
Attch_40_Addend_03_Colored_S-101G.pdf PDF
Attch_50_Addend_03_Colored_S-103A.pdf PDF
Attch_51_Addend_03_Colored_S-103B.pdf PDF
Attch_53_Addend_03_Colored_S-104A.pdf PDF
Attch_35_Addend_03_Colored_S-101B.pdf PDF
Attch_60_Addend_03_Colored_S-105C.pdf PDF
Attch_34_Addend_03_Colored_S-101A.pdf PDF
Attch_64_Addend_03_Colored_S-105G.pdf PDF
Attch_44_Addend_03_Colored_S-102C.pdf PDF
RFI_0002.pdf PDF
FA8601-15-R-0030_Addendum_Number_02.pdf PDF
FFPAddendum(w_Modifications).pdf PDF
Attch__18-Drawings_S-105D_and_S-105E.pdf PDF
Attch__17-Drawings_S-105B_and_S-105C.pdf PDF
Attch_19-Drawings_S-105F_and_S-105G.pdf PDF
Attch_23-Addendum_Number_01.pdf PDF
Attch__12-Drawings_S-103B_and_S-103C.pdf PDF
Attch__14-Drawings_S-104B_and_S-104C.pdf PDF
Attch_1-Specifications.pdf PDF
Attch_8-Drawings_S-102C_and_S-102D.pdf PDF
Attch__5-Drawings_S-101F_and_S-101G.pdf PDF
Attch_28-Addend_01_Cover_Page.pdf PDF
Attch_25-_Addend_01_DWG_S-301.pdf PDF
Attch_24-_Addend_01_DWG_S-101.pdf PDF
Attch__15-Drawings_S-104D_and_S-104E.pdf PDF
Attch_26-Addend_01_Section_01_01_00.pdf PDF
Attch__9-Drawings_S-102E_and_S-102F.pdf PDF
Attch__10-Drawings_S-102G_and_S-102H.pdf PDF
Attch_27-Addend_01_Section_01_02_50.pdf PDF
Attch__7-Drawings_S-102A_and_S-102B.pdf PDF
Attch__11-Drawings_S-103_and_S-103A.pdf PDF
Show all 50

Repair-Replace Steam Pipe Stanchions has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S-101B

BULL HEAD TUNNEL PHOTOS/DESCRIPTIONS

101B-a

EXISTING CONDITION REPAIR PROCEDURE

101B-b

EXISTING CONDITION REPAIR PROCEDURE

101B-c

EXISTING CONDITION REPAIR PROCEDURE

101B-d

EXISTING CONDITION REPAIR PROCEDURE

WALL AT STANCHION 29.

INTRUSION EVIDENT AT INSIDE FACE OF

CONCRETE CEILING & WALLS. WATER

DETERIORATION & CRACKING THROUGHOUT

101B-e

EXISTING CONDITION REPAIR PROCEDURE

101B-f

EXISTING CONDITION REPAIR PROCEDURE

EXISTING CONDITION REPAIR PROCEDURE

101B-g

EXISTING CONDITION REPAIR PROCEDURE

101B-h

CRACKS IN CEILING & WALL AT STANCHION 28.

STANCHION. WATER INTRUSION EVIDENT ALONG

SYSTEM HAS NO CONNECTION AT TOP OF

VERTICAL TIE RODS DAMAGED. VERTICAL TIE ROD

TOP HORIZONTAL ROD SUPPORT MISSING &

STEEL SECTION AT STANCHION 29.

SUPPORT LEGS HAVE CORROSION & LOSS OF

TOP HORIZONTAL ROD SUPPORT & VERTICAL

ALONG CRACKS IN CEILING AT STANCHION 31.

SECTION OF STEEL. WATER INTRUSION EVIDENT

SUPPORT LEG HAVE CORROSION & LOSS

TOP HORIZONTAL ROD SUPPORT & VERTICAL

OF WALL AT STANCHION 31.

WATER INTRUSION EVIDENT AT BASE

CORROSION & LOSS OF STEEL SECTION.

BASE OF VERTICAL SUPPORT LEG HAS

CEILING AT STANCHION 31.

INTRUSION EVIDENT ALONG CRACKS IN

& LOSS SECTION OF STEEL. WATER

VERTICAL SUPPORT LEG HAVE CORROSION

TOP HORIZONTAL ROD SUPPORT &

SUPPORT AT STANCHION 32.

PIPE ROLLER MISSING AT BOTTOM CHANNEL

CORROSION & LOSS OF STEEL SECTION.

BASE OF VERTICAL SUPPORT LEGS HAVE

AT STANCHION 28.

MAKING CONTACT w/ PIPE

LOCATION & ROLLER NOT

w/ PIPE ROLLER IN WRONG

HORIZONTAL CHANNEL SUPPORT

DETAIL

SEE 1/S-303 FOR REPLACEMENT OF STANCHION

CLEAN AREA ADJACENT TO EXISTING STANCHION.

WATERPROOFING APPLICATION

INJECTION REPAIR, & 2/S-301 FOR INTERNAL

DETAIL, 3A/S-301 FOR CONCRETE CRACK

SEE 1/S-303 FOR REPLACEMENT OF STANCHION

CLEAN AREA ADJACENT TO EXISTING STANCHION.

DETAIL

SEE 1/S-303 FOR REPLACEMENT OF STANCHION

CLEAN AREA ADJACENT TO EXISTING STANCHION.

CRACK INJECTION REPAIR.

APPLICATION AND 3A/S-301 FOR CONCRETE

SEE 2/S-301 FOR INTERNAL WATERPROOFING

WATERPROOFING APPLICATION

INJECTION REPAIR, & 2/S-301 FOR INTERNAL

DETAIL, 3A/S-301 FOR CONCRETE CRACK

SEE 1/S-303 FOR REPLACEMENT OF STANCHION

CLEAN AREA ADJACENT TO EXISTING STANCHION.

APPLICATION

DETAIL & 2/S-301 FOR INTERNAL WATERPROOFING

SEE 1/S-303 FOR REPLACEMENT OF STANCHION

CLEAN AREA ADJACENT TO EXISTING STANCHION.

OF THE STANCHION.

THE BASE OF THE WALL & AROUND THE BASE

2. CLEAN ALL LOOSE PIECES OF DEBRIS FROM

COATING.

APPLICATION OF A CORROSION RESISTANT

STEEL SHALL BE CLEANED TO ALLOW FOR

STANCHIONS (TO REMAIN) SHALL BE REMOVED.

1. ALL CORROSION PRESENT ON EXISTING STEEL

NOTES:

WATERPROOFING APPLICATION

INJECTION REPAIR, & 2/S-301 FOR INTERNAL

DETAIL, 3A/S-301 FOR CONCRETE CRACK

SEE 1/S-303 FOR REPLACEMENT OF STANCHION

CLEAN AREA ADJACENT TO EXISTING STANCHION.

DETAIL

SEE 1/S-303 FOR REPLACEMENT OF STANCHION

CLEAN AREA ADJACENT TO EXISTING STANCHION.

COORDINATOR ENGINEERING CHIEF

DATE REVISION BYNO. DATE NO. REVISION BY

C I

V

IL

ENGI

N

E E

R

US AF

WRIGHT-PATTERSON AIR FORCE BASE

88TH ABW

OF

DESIGN CHIEF

DATEDRAWNDESIGNED CHECKED

RPR/RPL STEAM STANCHIONS

PROJECT NUMBER ZHTV 090018

SUBMITTAL - 100% GOVT. SUBMITTAL

SPR SPR MSS JUNE 2015

S-101C

BULL HEAD TUNNEL PHOTOS/DESCRIPTIONS

101C-a

EXISTING CONDITION REPAIR PROCEDURE

101C-b

EXISTING CONDITION REPAIR PROCEDURE

101C-c

EXISTING CONDITION REPAIR PROCEDURE

EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE EXISTING CONDITION REPAIR PROCEDURE

EXISTING CONDITION REPAIR PROCEDUREEXISTING CONDITION REPAIR PROCEDURE

101C-d 101C-e 101C-f

101C-h101C-g

PRESENT ALONG BASE OF TUNNEL.

AT STANCHION 33. WATER INTRUSION

CORROSION & LOSS OF STEEL SECTION

BASE OF VERTICAL CHANNEL LEGS HAVE

EVIDENT ALONG WALL.

STANCHION 34. CALCIUM & WATER INTRUSION

OR SUPPORTING HORIZ. SUPPORTS AT

VERTICAL TIE RODS NO LONGER SUPPORTED

CONNECTED TO VERTICAL SUPPORTS.

TOP HORIZONTAL ROD SUPPORT NOT

CORRECT SUPPORT LOCATION AT STANCHION 34.

HORIZONTAL SUPPORT & ROLLER NOT IN

& LOSS OF STEEL SECTION. INTERMEDIATE

HORIZONTAL CHANNEL SUPPORT HAVE CORROSION

BASE OF VERTICAL SUPPORT LEGS & BOTTOM

BASE AT STANCHION 36.

WATER INTRUSION PRESENT AT ALONG

CORROSION & LOSS OF STEEL SECTION.

BASE OF VERTICAL CHANNEL LEG HAS

STEEL SECTION AT STANCHION 37.

HAVE CORROSION & LOSS OF

BASE OF VERTICAL SUPPORT LEGS

SECTION AT STANCHION 38.

HAVE CORROSION LOSS OF STEEL

BASE OF VERTICAL SUPPORT LEGS

STEEL SECTION AT STANCHION 39.

HAVE CORROSION & LOSS OF

BASE OF VERTICAL SUPPORT LEGS

FOR CRACK IN CONCRETE DESCRIPTION)

AT STANCHION 40. (SEE PHOTO ON S-101G

CORROSION & LOSS OF STEEL SECTION

BASE OF VERTICAL SUPPORT LEG HAS

APPLICATION

DETAIL & 2/S-301 FOR INTERNAL WATERPROOFING

SEE 1/S-303 FOR REPLACEMENT OF STANCHION

CLEAN AREA ADJACENT TO EXISTING STANCHION.

APPLICATION

DETAIL & 2/S-301 FOR INTERNAL WATERPROOFING

SEE 1/S-303 FOR REPLACEMENT OF STANCHION

CLEAN AREA ADJACENT TO EXISTING STANCHION.

DETAIL

SEE 1/S-303 FOR REPLACEMENT OF STANCHION

CLEAN AREA ADJACENT TO EXISTING STANCHION.

APPLICATION

DETAIL & 2/S-301 FOR INTERNAL WATERPROOFING

SEE 1/S-303 FOR REPLACEMENT OF STANCHION

CLEAN AREA ADJACENT TO EXISTING STANCHION.

DETAIL

SEE 1/S-303 FOR REPLACEMENT OF STANCHION

CLEAN AREA ADJACENT TO EXISTING STANCHION.

DETAIL

SEE 1/S-303 FOR REPLACEMENT OF STANCHION

CLEAN AREA ADJACENT TO EXISTING STANCHION.

DETAIL

SEE 1/S-303 FOR REPLACEMENT OF STANCHION

CLEAN AREA ADJACENT TO EXISTING STANCHION.

DETAIL

SEE 1/S-303 FOR REPLACEMENT OF STANCHION

CLEAN AREA ADJACENT TO EXISTING STANCHION.

OF THE STANCHION.

THE BASE OF THE WALL & AROUND THE BASE

2. CLEAN ALL LOOSE PIECES OF DEBRIS FROM

COATING.

APPLICATION OF A CORROSION RESISTANT

STEEL SHALL BE CLEANED TO ALLOW FOR

STANCHIONS (TO REMAIN) SHALL BE REMOVED.

1. ALL CORROSION PRESENT ON EXISTING STEEL

NOTES:

COORDINATOR ENGINEERING CHIEF

DATE REVISION BYNO. DATE NO. REVISION BY

C I

V

IL

ENGI

N

E E

R

US AF

WRIGHT-PATTERSON AIR FORCE BASE

88TH ABW

OF

DESIGN CHIEF

DATEDRAWNDESIGNED CHECKED

RPR/RPL STEAM STANCHIONS

PROJECT NUMBER ZHTV 090018

SUBMITTAL - 100% GOVT. SUBMITTAL

SPR SPR MSS JUNE 2015

File details come from the government source that posted it. Updated .