Site Visit Minutes.doc

DOC document 24 KB Posted

Attached to
Industrial Water Treatment
Solicitation number
FA8601-12-R-0002
Issued by

About this file

Site Visit Minutes

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Industrial Water Treatment Site Visit Minutes

29 February 2012 1005 – Read Site Visit Briefing, Signed Attendance Sheet, and Left Hope Hotel 1010 – Arrive – Building 1240 – Kittyhawk Area

Walked by feeders for high-temperature (hot water) system

Softener room

Brine tank/salt storage outside

Building 1251 – Clarifier Building/ Clarifier pits/ Runoff building 1019 – Left Kittyhawk Area

1021 - Arrive – Building 170 Area A

Converter room in Building 170 – High temperature hot water to steam

Testing laboratory for samples

Building 53 – RO system

1032 – Leave Building 170/53 & Area A 1043 – Building 770 - Steam generation plant Walked through basement

Walk behind boilers/sample lab

Walked downstairs – RO system

Softener room

Brine tank outside

Attached feeding room

Separate clarifier building/pit seen, but not entered

1055 – Leave Building 770

1102 – Building 571 – Wright Field Fitness Center – Area B

Chiller room

Utility room

Walked to tower on roof

1111 – Leave Building 571

1115 – Building 51 – Area B

Chiller Room

Walk by tower behind Building 51, part of chiller system

1121 – Leave Building 51

1126 – Building 559 – Area B

Boiler room

Chiller room in basement

Cooling towers on roof

1136 – Leave Building 559

1142 – Arrive at Hope Hotel & Depart

Attachments:

Site Visit Briefing – 1 Page

Attendance List – 1 Page

File details come from the government source that posted it. Updated .