RFI 1 Response.pdf

PDF 59 KB Posted

Attached to
Replace Fire Alarm System Federal contract opportunity
Solicitation number
FA8601-12-B-0011
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

RFI 1 Response

View the file

Other files for this federal contract opportunity

Other files attached to Replace Fire Alarm System, newest first.
File Type Posted
General Decision Number - OH29 - 3 AUG 12.pdf PDF
FA8601-12-B-0011 - Amendment 5.pdf PDF
FA8601-12-B-0011 - Amendment 4.pdf PDF
General Decision Number - OH29 - 27 JUL 12.pdf PDF
RFI 4 Response.pdf PDF
RFI 2 Response.pdf PDF
RFI 6 Response.pdf PDF
RFI 3 Response.pdf PDF
RFI 5 Response.pdf PDF
Addendum 2.pdf PDF
Addendum 2 Drawing A-102.pdf PDF
Addendum 2 Drawing A-001.pdf PDF
Addendum 2 Drawing E-221A.pdf PDF
Addendum 2 Drawing T-000.pdf PDF
Site Visit Sign-in Sheet.pdf PDF
Addendum 2 Drawing E-222A.pdf PDF
Addendum 2 Drawing E-223A.pdf PDF
FA8601-12-B-0011 - Amendment 3.pdf PDF
FA8601-12-B-0011 - Addendum 1.pdf PDF
FA8601-12-B-0011 - Addendum 1 Specification.pdf PDF
FA8601-12-B-0011 - Amendment 2.pdf PDF
FA8601-12-B-0011 - Amendment 1 Site Visit Date.pdf PDF
Final_FA_20676_Specifications.pdf PDF
DBA Wage Decision - Bldg Mod 23 6 Jul 12.pdf PDF
Final_FA_20676_Drawings 1 .pdf PDF
FA8601-12-B-0011 Replace Fire Alarm Sys.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI 1

Specification section 095100- Acoustical Ceilings is provided in the project manual but the project drawings make no reference to such work being required. Is this specification being provided for “information purposes” in case the existing ceilings are damaged or is it the government’s intent that the existing ACT ceilings are to be removed and replaced in their entirety?

Response

The specification has been included in the documentation to account for plan notes found on sheets A-001 General Note H and E-000 General Notes: Patching Sealing and Repair Note C.

The intent is to patch areas affected by all new construction.