Addendum 2.pdf

PDF 52 KB Posted

Attached to
Replace Fire Alarm System Federal contract opportunity
Solicitation number
FA8601-12-B-0011
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

Addendum 2

View the file

Other files for this federal contract opportunity

Other files attached to Replace Fire Alarm System, newest first.
File Type Posted
FA8601-12-B-0011 - Amendment 5.pdf PDF
General Decision Number - OH29 - 3 AUG 12.pdf PDF
FA8601-12-B-0011 - Amendment 4.pdf PDF
General Decision Number - OH29 - 27 JUL 12.pdf PDF
RFI 4 Response.pdf PDF
RFI 3 Response.pdf PDF
RFI 1 Response.pdf PDF
RFI 5 Response.pdf PDF
RFI 2 Response.pdf PDF
RFI 6 Response.pdf PDF
Addendum 2 Drawing A-001.pdf PDF
Addendum 2 Drawing E-221A.pdf PDF
FA8601-12-B-0011 - Amendment 3.pdf PDF
Addendum 2 Drawing T-000.pdf PDF
Site Visit Sign-in Sheet.pdf PDF
Addendum 2 Drawing E-222A.pdf PDF
Addendum 2 Drawing E-223A.pdf PDF
Addendum 2 Drawing A-102.pdf PDF
FA8601-12-B-0011 - Addendum 1 Specification.pdf PDF
FA8601-12-B-0011 - Amendment 2.pdf PDF
FA8601-12-B-0011 - Addendum 1.pdf PDF
FA8601-12-B-0011 - Amendment 1 Site Visit Date.pdf PDF
DBA Wage Decision - Bldg Mod 23 6 Jul 12.pdf PDF
Final_FA_20676_Drawings 1 .pdf PDF
FA8601-12-B-0011 Replace Fire Alarm Sys.pdf PDF
Final_FA_20676_Specifications.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Template Version 19 Aug 2011

ADDENDUM NUMBER 2

TO

DRAWINGS AND SPECIFICATIONS

FOR

Replace Fire Alarm System

WRIGHT-PATTERSON AIR FORCE BASE, OHIO

PROJECT NUMBER: ZHTV 060014

1. The contract Drawings and Specifications are hereby amended in part as follows:

A. Drawing A-001 General Note I revised to “Not Used”.

B. Drawing A-102 Revised coded note reference associated with Door 209A.

C. Drawing T-000 the following was changed:

1. Project general note #16 was revised to clarify that the contractor will be impacting asbestos containing material on the project.

2. Project general note #23 was added to clarify that the drywall joint compound in the facility is known to be asbestos containing material, and to provide direction for the contractor for penetrations in drywall.

3. Project general note #24 was added to clarify that door frames identified for demolition on the project will impact drywall with joint compound that is known to be asbestos containing material, and to provide direction for the contractor for dealing with demolition at these door locations.

4. Project general note #25 was added to clarify that floor tile mastic in the facility is known to be asbestos containing material.

5. Project general note #26 was added to notify the contractor that pipe insulation contains asbestos material.

D. Drawing E-221A the following was changed:

1. Revised general note „B‟ to „Not Used‟.

2. Revised Vesda Smoke Detection Zones schedule to include the hatching pattern associated with the compartment identified on the schedule.

E. Drawing E-222A the following was changed:

1. Revised general note „B‟ to „Not Used‟.

2. Revised Vesda Smoke Detection Zones schedule to include the hatching pattern associated with the compartments identified on the schedule.

F. Drawing E-223A the following was changed:

1. Revised general note „B‟ to „Not Used‟.

2. Revised Vesda Smoke Detection Zones schedule to include the hatching pattern associated with the compartments identified on the schedule.

2. This Addendum Number 2 hereby forms and is made a part of the above named project drawings and specifications.

Date: 25 July 2012