FA8601-12-B-0011 - Amendment 4.pdf

PDF 90 KB Posted

Attached to
Replace Fire Alarm System Federal contract opportunity
Solicitation number
FA8601-12-B-0011
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

View the file

Other files for this federal contract opportunity

Other files attached to Replace Fire Alarm System, newest first.
File Type Posted
FA8601-12-B-0011 - Amendment 5.pdf PDF
General Decision Number - OH29 - 3 AUG 12.pdf PDF
General Decision Number - OH29 - 27 JUL 12.pdf PDF
RFI 4 Response.pdf PDF
RFI 3 Response.pdf PDF
RFI 1 Response.pdf PDF
RFI 5 Response.pdf PDF
RFI 2 Response.pdf PDF
RFI 6 Response.pdf PDF
Addendum 2 Drawing A-001.pdf PDF
Addendum 2 Drawing E-221A.pdf PDF
FA8601-12-B-0011 - Amendment 3.pdf PDF
Addendum 2 Drawing T-000.pdf PDF
Site Visit Sign-in Sheet.pdf PDF
Addendum 2 Drawing E-222A.pdf PDF
Addendum 2 Drawing E-223A.pdf PDF
Addendum 2.pdf PDF
Addendum 2 Drawing A-102.pdf PDF
FA8601-12-B-0011 - Addendum 1 Specification.pdf PDF
FA8601-12-B-0011 - Amendment 2.pdf PDF
FA8601-12-B-0011 - Addendum 1.pdf PDF
FA8601-12-B-0011 - Amendment 1 Site Visit Date.pdf PDF
DBA Wage Decision - Bldg Mod 23 6 Jul 12.pdf PDF
Final_FA_20676_Drawings 1 .pdf PDF
FA8601-12-B-0011 Replace Fire Alarm Sys.pdf PDF
Final_FA_20676_Specifications.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

060014

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to update the Wage Determination and WAWF clause.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 27-Jul-2012

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X

FA8601-12-B-0011

X

9B. DATED (SEE ITEM 11)

06-Jul-2012

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

27-Jul-2012

CODE

AFLCMC/PKOC - CONSTRUCTION BRANCH

POC: LAKEISHA SANDFORD

1940 ALLBROOK DRIVE, ROOM 109

WRIGHT-PATTERSON AFB OH 45433-5309

FA8601 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA8601-12-B-0011

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION G - CONTRACT ADMINISTRATION DATA

The following have been added by full text:

WAWF PAYMENT INSTRUCTIONS

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JUN 2012)

(a) Definitions. As used in this clause--

Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.

Document type means the type of payment request or receiving report available for creation in Wide Area

WorkFlow (WAWF).

Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.

(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall--

(1) Have a designated electronic business point of contact in the Central Contractor Registration at https://www.acquisition.gov;and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training

Course and use the Practice Training Site before submitting payment requests through

WAWF. Both can be accessed by selecting the ``Web Based Training'' link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data

Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

“Construction Payment Invoice”

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in

WAWF, as specified by the contracting officer.

https://www.acquisition.gov/ https://wawf.eb.mil/ https://wawf.eb.mil/

FOB: D

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC F03000

Issue By DoDAAC FA8601

Admin DoDAAC FA8601

Inspect By DoDAAC F4F2AA

Ship To Code F4F2AA

Ship From Code

Mark For Code

Service Approver (DoDAAC)

Service Acceptor (DoDAAC) FA8601

Accept at Other DoDAAC

LPO DoDAAC

DCAA Auditor DoDAAC

Other DoDAAC(s)

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the email address identified below in the ``Send

Additional Email Notifications'' field of WAWF once a document is submitted in the system.

Contract Administrator: Joshua.Kena@wpafb.af.mil

Contracting Officer/Acceptor: James.Bane@wpafb.af.mil

Inspector: TBD

Additional Contact: Michael.Burns@wpafb.af.mil

(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

Contract Administrator: Joshua.Kena@wpafb.af.mil

Contracting Officer: James.Bane@wpafb.af.mil mailto:Joshua.Kena@wpafb.af.mil mailto:James.Bane@wpafb.af.mil mailto:Michael.Burns@wpafb.af.mil mailto:Joshua.Kena@wpafb.af.mil mailto:James.Bane@wpafb.af.mil

(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.

(End of clause)

The following have been deleted:

ASC/PKO G-001 WAWF ELECTRONIC INVOICING INSTRUCTIONS FEB 2006

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 01 Specifications 308 07-JUN-2012

Attachment 02 Drawings 41 07-JUN-2012

Attachment 03 General Decision

OH120029

63 20-JUL-2012

Attachment 04 Addendum 1 1 18-JUL-2012

Attachment 05 Addendum 1

Specification

1 18-JUL-2012

Attachment 06 Addendum 2 1 25-JUL-2012

Attachment 07 Addendum 2 Drawing A-

1 25-JUL-2012

Attachment 08 Addendum 2 Drawing A-

1 25-JUL-2012

Attachment 09 Addendum 2 Drawing E-

221A

1 25-JUL-2012

Attachment 10 Addendum 2 Drawing E-

222A

1 25-JUL-2012

Attachment 11 Addendum 2 Drawing E-

223A

1 25-JUL-2012

Attachment 12 Addendum 2 Drawing T-

1 25-JUL-2012

to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 01 Specifications 308 07-JUN-2012

Attachment 02 Drawings 41 07-JUN-2012

Attachment 03 General Decision 63 27-JUL-2012

OH120029

Attachment 04 Addendum 1 1 18-JUL-2012

Attachment 05 Addendum 1

Specification

1 18-JUL-2012

Attachment 06 Addendum 2 1 25-JUL-2012

Attachment 07 Addendum 2 Drawing A-

1 25-JUL-2012

Attachment 08 Addendum 2 Drawing A-

1 25-JUL-2012

Attachment 09 Addendum 2 Drawing E-

221A

1 25-JUL-2012

Attachment 10 Addendum 2 Drawing E-

222A

1 25-JUL-2012

Attachment 11 Addendum 2 Drawing E-

223A

1 25-JUL-2012

Attachment 12 Addendum 2 Drawing T-

1 25-JUL-2012

(End of Summary of Changes)

File details come from the government source that posted it. Updated .