FA8601-12-B-0011 Replace Fire Alarm Sys.pdf

PDF 464 KB Posted

Attached to
Replace Fire Alarm System Federal contract opportunity
Solicitation number
FA8601-12-B-0011
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

Solicitation FA8601-12-B-0011

View the file

Other files for this federal contract opportunity

Other files attached to Replace Fire Alarm System, newest first.
File Type Posted
General Decision Number - OH29 - 3 AUG 12.pdf PDF
FA8601-12-B-0011 - Amendment 5.pdf PDF
FA8601-12-B-0011 - Amendment 4.pdf PDF
General Decision Number - OH29 - 27 JUL 12.pdf PDF
RFI 4 Response.pdf PDF
RFI 3 Response.pdf PDF
RFI 2 Response.pdf PDF
RFI 6 Response.pdf PDF
RFI 1 Response.pdf PDF
RFI 5 Response.pdf PDF
Addendum 2 Drawing A-001.pdf PDF
Addendum 2 Drawing E-221A.pdf PDF
Addendum 2.pdf PDF
Addendum 2 Drawing A-102.pdf PDF
FA8601-12-B-0011 - Amendment 3.pdf PDF
Addendum 2 Drawing T-000.pdf PDF
Site Visit Sign-in Sheet.pdf PDF
Addendum 2 Drawing E-222A.pdf PDF
Addendum 2 Drawing E-223A.pdf PDF
FA8601-12-B-0011 - Addendum 1.pdf PDF
FA8601-12-B-0011 - Addendum 1 Specification.pdf PDF
FA8601-12-B-0011 - Amendment 2.pdf PDF
FA8601-12-B-0011 - Amendment 1 Site Visit Date.pdf PDF
DBA Wage Decision - Bldg Mod 23 6 Jul 12.pdf PDF
Final_FA_20676_Specifications.pdf PDF
Final_FA_20676_Drawings 1 .pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Install a f ire detection system in Bldg 676, Area B; including the f ire alarm panel, sub-panels, mass notif ication system, audio/visual alarm devices, f ire alarm sensing devices, and some additions to the w et sprinkler system in selected areas.

This acquisition w ill be competed as a 100% Samll Business Set-Aside

Estimated Magnitude of proposed acquisition is betw een $500,000 and $1,000,000.

NAICS: 238210 SIZE STANDARD: $14M

An aw ard prior to 30 September, 2012 w ould require the contractor to begin performance w ithin 90 days of aw ard date in order to meet Bona

Fide Need.

*REFERENCE SECTION A , ADDITIONAL BLOCK 10 INFORMATION, FOR FURTHER DETAILS

X

JOSHUA KENA 937-522-4563

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

06-Jul-2012

(RFP)

(IFB)

CALL:

Rpl Fire Alarm System

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________270 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________06 Aug 2012 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______145 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

ASC/PKOC - CONSTRUCTION BRANCH

POC: SSGT JOSHUA KENA

1940 ALLBROOK DRIVE, ROOM 109

WRIGHT-PATTERSON AFB OH 45433-5309

FA8601

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

10:00 AM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

060014

8. ADDRESS OFFER TO (If Other Than Item 7)

937-257-2825FAX:TEL: 937-522-4563 TEL: FAX:

FA8601-12-B-0011 45

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued)

(Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED

31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

FA8601-12-B-0011

Section A - Solicitation/Contract Form

ADDITIONAL BLOCK 10 INFORMATIO

ADDITIONAL BLOCK 10 INFORMATION

Enter price in Section B. Please use a Typewriter or Black Ink

A public bid opening will be held on 06 Aug 2012 at 10:00 AM at Bldg 893 Twin Base Golf Course, Area A, Wright-Patterson AFB. This building can be accessed at the entrance to Gate 16A on SR-444. Any bids submitted after

9:30 AM shall be delivered to this location.

SITE VISIT WILL TAKE PLACE ON 17 July 2012 at 9:00am. (See further instructions in Section L. provision

52.236-27 Alt 1)

Note 1: Hard copies of the solicitation will not be provided. The documents may be found and downloaded at:

http://www.fbo.gov

Note 2: “Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.”

Note 3: The insurance required for FAR52.228-5 shall be IAW FAR 28.310.

Note 4: Any prospective offeror desiring an explanation or interpretation of the solicitation or associated documents must request so in writing no later than ten (10) days prior to the closing date.

Note 5: Any and all costs incurred by a prospective offeror as a result of this solicitation are entirely at the offeror's own risk.

Note 6: Bidder’s are required to provide their name and complete address, including street, city, county, state, and

ZIP code in Block 14 of the SF1442.

http://www.fbo.gov/

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Lump Sum Replace Fire Alarm System Building 676

FFP

Install a fire detection system in Bldg 676, Area B; including the fire alarm panel, sub-panels, mass notification system, audio/visual alarm devices, fire alarm sensing devices, and some additions to the wet sprinkler system in selected areas as described in the Attachments listed in Section J of the contract.

Project 060014

FOB: Destination

PROJECT: 060014

NET AMT

Section E - Inspection and Acceptance

PKOC E001

PKOC E001 - INSPECTION AND ACCEPTANCE (NOV 2010)

(IAW FAR 46.401(b) and 46.503)

Inspection and acceptance of the overall effort will be performed at Wright-Patterson AFB OH by 88 ABW/CEP.

(End of Clause)

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government

CLAUSES INCORPORATED BY REFERENCE

52.246-12 Inspection of Construction AUG 1996

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

0001 270 dys. ADC 1 88 CEG CERF

NO CONTACT IDENTFIED

1450 LITTRELL RD

WRIGHT-PATTERSON AFB OH 45433-5209

FOB: Destination

F4F2AA

52.242-17 Government Delay Of Work APR 1984

52.247-34 F.O.B. Destination NOV 1991

Section G - Contract Administration Data

PKOC G002

PKOC G002 - CONTRACT HOLIDAYS (MAR 2011)

The following days are contract holidays: New Year’s Day; Martin Luther King’s Birthday; Presidents’ Day;

Memorial Day; Independence Day; Labor Day; Columbus Day; Veteran’s Day; Thanksgiving Day; Christmas Day.

CLAUSES INCORPORATED BY FULL TEXT

ASC/PKO G-001, WIDE AREA WORK FLOW – RECEIPT AND ACCEPTANCE (WAWF-RA)

ELECTRONIC INVOICING AND RECEIVING REPORT INSTRUCTIONS (2/17/2006)

1. CONTRACTORS SHALL SUBMIT INVOICES THROUGH WAWF-RA FOR PAYMENT.

SUBMISSION OF INVOICES VIA ANY OTHER METHOD SHALL DELAY PAYMENT. HARD COPIES

OF INVOICES ARE NO LONGER ACCEPTABLE METHODS OF SUBMISSION AND MAY BE RETURNED

TO THE CONTRACTOR.

2. The contractor shall be paid after submission of a properly prepared invoice and after final inspection and acceptance by the Government. In accordance with DFARS 252.232-7003, use of electronic payment requests is mandatory. Wide Area Workflow – Receipt and Acceptance (WAWF-RA) is the Department of Defense system preferred choice for submission of electronic payment requests and receipt and acceptance documents. The following information will aid in the submission of an invoice through WAWF-RA.

3. Information regarding WAWF-RA is available on the Internet at https://wawf.eb.mil. Note that the Software

Users Manual posted to WAWF-RA is an excellent source for information when completing the invoice submission process. WAWF-RA training is also available at http://www.wawftraining.com.

4. Invoices shall be submitted (Selection determined by the Contracting Officer by placing an X in the appropriate block):

a. [. .] After Delivery of Supplies or Services

b. [X] Monthly (After Performance)

c. [. .] Quarterly (After Performance)

d. [. .] Semi-annually (After Performance)

e. [. .] Yearly (After Performance)

5. The following codes are required to properly route your invoices and/or receiving reports through WAWF-RA.

Missing elements in the following areas may cause delays in the payment process.

a. ISSUE DATE: SEE BLOCK 3 OF THE SF 1442

b. CONTRACT NUMBER: TBD

c. DELIVERY ORDER NUMBER: . . (Note to contractor : Blank unless provided by the contracting officer )

d. CAGE CODE: TBD

e. PAY OFFICE DODAAC: F03000

6. The contractor shall submit invoices using the following format for Payment Type. Be advised that only the selections noted below shall be used in the submittal process. THE CONTRACTOR SHALL STRICTLY

ADHERE TO THE SELECTION NOTED BELOW TO AVOID DELAYS IN THE PAYMENT PROCESS.

SUBMISSION OF INVOICE OTHER THAN THAT SPECIFIED BELOW MAY DELAY PAYMENT

https://rmb.ogden.disa.mil/ http://www.wawftraining.com/

AND/OR CAUSE INVOICE TO BE RETURNED. Invoices must clearly delineate the cost to the respective

Contract Line Item Number (CLIN) and sub-CLIN. (See FAR 4, DFARS 204.71 and AFMC FAR Supp

5304.71)

a. [. .] Invoice (Note to contractor: To be used ONLY if authorized by the Contracting Officer)

b. [. .] Invoice 2n1 (Services Only)

c. [X] Construction Payment Invoice

d. [. .] Commercial Item Financing (Note to contractor: To be used ONLY if authorized by the Contracting Officer)

e. [. .] Performance Based Payment (Note to contractor: To be used ONLY if authorized by the Contracting

Officer)

f. [. .] Progress Payments (Note to contractor: To be used ONLY if authorized by the Contracting Officer)

g. [. .] Receiving Report

h. [. .] Invoice and Receiving Report (COMBO)

Note: Inspection = . . (source, destination) Acceptance = . . (source, destination)

i. [. .] Public Voucher

(Note to contractor: If no selection is specified above, contractor shall utilize the Invoice 2n1 (Services Only) format. Contact the Contracting Officer for clarification when in doubt on how to submit an invoice through Wide

Area Work Flow. Also note that if the contractual document requires attachments to be submitted (e.g., a copy of a paid freight bill), this can be accomplished by following instructions under Software User’s Manual on the WAWF-

RA site regarding “attachments”.

7. The following additional codes are required to properly route your invoices and/or receiving reports through

WAWF-RA. Note that if errors are received in the creation of your document, stop and call the Contracting Officer for verification of code required. Also note that some fields shown may or may not be included depending upon the type of invoice created. An example of the fields required when submitting an invoice are provided:

a. ISSUE BY DODAAC: FA8601

b. ADMIN DODAAC: FA8601 (Note to contractor: This field may also be referred to as ADMIN BPN)

c. INSPECT BY DODAAC or BPN: F4F2AA EXT: . . (Note to contractor: These fields may be blank if not filled out by the contracting office, EXT may be blank even if the Inspect By DODAAC is shown.)

d. MARK FOR CODE: Leave Blank

e. SHIP TO CODE: F4F2AA EXT: . . (Note to contractor: EXT may be blank even if the first code here is shown. Also note this may also be referred to as Service Acceptor Code or Contracting Officer Code. In the future, this code may be referred to as BPN)

f. SHIP FROM CODE: Leave Blank

g. SHIPMENT NUMBER: (Note to contractor: This field is created and provided by the contractor. If no shipment number is completed in the WAWF process, the invoice number will be the default number.)

h. INVOICE NUMBER: (Note to contractor: This is the invoice number created and provided by the contractor)

i. ADDRESSES TAB (Note to contractor: WAWF-RA will pre-populate the address information, ensure it is correct.)

j. DISCOUNT TAB (Note to contractor: This allows for prompt payment discounts)

k. FOB: D (D, S, V) (D denotes destination shipping, S denotes shipment address same as contractor’s address, V denotes shipment from other than contractor’s address.) (Note to contractor: If other than Destination (D), submission of a paid freight bill may be required as an attachment to substantiate shipping charge.)

8. When creating invoices and/or receiving reports, the contractor shall select the “Additional

E-mail Notifications” link and enter the e-mail addresses below. The Government will advise the contractor of changes to these e-mail notifications by letter or e-mail vs. contract modification. Upon receipt of the change(s), the contractor shall include the new e-mail notifications when creating invoices and/or receiving reports. Contractor shall send an email notification to the addressees listed below upon submittal of an invoice through Wide Area Work

Flow (WAWF-RA).

a. INSPECTOR: michael.burns@wpafb.af.mil

b. ACCEPTOR: jonathon.richardson@wpafb.af.mil

c. CONTRACT ADMINISTRATOR: joshua.kena@wpafb.af.mil

d. CONTRACTING OFFICER: jonathon.richardson@wpafb.af.mil

e. ADDITIONAL CONTACT: james.bane@wpafb.af.mil

9. Questions concerning payments should be directed to the Defense Finance Accounting Services (DFAS) located in Block #27 of the SF1442. The contract, purchase order, or invoice number is required when inquiring about payment status. Payment information may also be accessed from the DFAS web site at https://myinvoice.csd.disa.mil/index.html.

10. DEFINITIONS. Following is a list of definitions that may be helpful. Additional information can be found at http://farsite.hill.af.mil/ and http://www.dod.mil/dfas/commpay/contractorpayment/.

BPN: Business Partner Number. An integrated electronic infrastructure the Government uses to manage (i.e., collect, validate, access and maintain) the information it needs to transact business with its contractors. The BPN is located at http://www.bpn.gov.

CAGE CODE: Commercial and Government Entity Code. A CAGE Code is a five (5)-position code that identifies companies doing or wishing to do business with the Federal Government. http://www.ccr.gov/

COMMERCIAL ITEM FINANCING IS a form of contract financing resulting from the Federal Acquisition

Streamlining Act (FASA) of 1994. Use of this type of invoicing shall be approved by the Contracting officer.

CONTRACTING OFFICER: The person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings.

CONTRACTOR: Also known as vendor

DODAAC: Department of Defense Activity Address Code. A six-position code that uniquely identifies a unit, activity, or organization that has the authority to requisition and/or receive materiel

DELIVERY ORDER: An order for supplies placed against an established contract or with Government sources.

F.O.B. DESTINATION: Free on board at destination; i.e., the seller or consignor delivers the goods on seller’s or consignor’s conveyance at destination.

F.O.B. ORIGIN: Free on board at origin; i.e., the seller or consignor places the goods on the conveyance. Unless the contract provides otherwise, the buyer or consignee is responsible for the cost of shipping and risk of loss.

INSPECTION: means examining and testing supplies or services (including, when appropriate, raw materials, components, and intermediate assemblies) to determine whether they conform to contract requirements.

INVOICE: means a contractor's bill or written request for payment under the contract for supplies delivered or services performed (see also “proper invoice”).

MUST: see SHALL.

PERFORMANCE BASED PAYMENTS: A provision for the use of Performance Based Payments (PBPs) as an alternative to progress payments for contract financing. Use of Performance Based Payment method shall be approved by the Contracting Officer

PROGRESS PAYMENTS: Progress payments are payments made based on the cost incurred by the contractor as work progresses under the contract. Use of Progress payment method shall be approved by the Contracting Officer.

PROPER INVOICE: An invoice that meets the minimum standards specified in FAR 32.905(b).

RECEIVING REPORT: Written evidence that indicates Government acceptance of supplies delivered or services performed.

SHALL: The imperative.

SHOULD: An expected course of action or policy that is to be followed unless inappropriate for a particular circumstance.

TAXPAYER IDENTIFICATION NUMBER (TIN): The number required by the IRS to be used by the offeror in reporting income tax and other returns.

Section H - Special Contract Requirements

PKOC H-008

PKOC H-008 - GOVERNMENT DOWN TIME FOR VARIOUS AUTHORITIES INCLUDING THE

PRESIDENT, SECRETARY OF DEFENSE, SECRETARY OF THE AIR FORCE, AFMC/CC, ASC/CC, 88

ABW/CC, AND PROGRAM MANAGERS (MAR 2011)

(a) Base Closures Due to Emergencies. From time to time, the Center or Base Commander or other authority may decide to close all or part of the base in response to an unforeseen emergency or similar occurrence. Sample emergencies include, but are not limited to, adverse weather such as snow or flood, an act of God such as a tornado or earthquake, acts of war or terrorism, computer failures, or a base disaster such as a natural gas leak or fire.

Contractor personnel are “non-essential” for purposes of any instructions regarding the emergency.

(1) Contractor shall be officially dismissed upon notification of a base closure in accordance with paragraph b. Contractor shall promptly secure all government furnished property appropriately and evacuate in an expedient but safe manner.

(2) With regard to work under the contract, the Government shall retain the following options:

(i) Government may grant a time extension for any effort delayed by the closure equal to the time of the closure, subject to the availability of funds.

(ii) Government may forego the work. The Contractor will not be paid for work not performed. This shall be accomplished via Termination for Convenience of the Government or change order to descope work.

(iii) Government may reschedule the work on any day satisfactory to both parties.

(iv) In rare instances, Government may request that the Contractor continue on-site performance during the base closure period. Such a request shall be subject to agreement by Contractor.

(b) Base Closure Notification Procedures.

(1) After an official decision to close Wright-Patterson AFB has been made by the Base Commander, the following radio and television stations shall be notified of the closure:

Television:

WHIO 7

WDTN 2

WTJC 26

WKEF 22

Radio:

WHIO AM 1290 WBVE FM 96-5

WONE AM 98 WTUE FM 104.7

WBLY AM 1600 WBZI FM 95.3

WIZE AM 1340 WYSO FM 91.3

WLW AM 700 WYMJ FM 103.9

WDAO AM 1210 WFCJ FM 93.7

WING AM 1410 WHKO FM 99.1

WAZU FM 102.9 WVUD FM 99.9

(2) The Contractor is directed to listen or watch one of the radio or television stations listed in paragraph b.1 for a base closure. Contractor should follow instructions intended for non-essential personnel.

(3) The Contractor will not receive any other form of notification of a base closure from the Government.

The Contractor is responsible for notification of his or her employees.

(4) If the decision to close all or part of the base is made during the duty day, and the Base Commander’s decision is transmitted through official notification channels, the Contractor shall follow the instructions as given.

Contractor personnel shall notify their task monitor and act in accordance with the task monitor’s instruction.

(c) Base Closure Due to Non-Emergencies. The Center or Base Commander or other authority may elect to close all or part of the base for non-emergency reasons such as time-off award, base open house, etc. In the event of a non-emergency base closure, the Contract Task Monitor and the Contractor shall jointly choose a course of action..

PKOC H-018 - EMS TRAINING

PKOC H-018 - EMS TRAINING (NOV 2010)

Initial Environmental Management System awareness-level training is required for all personnel working on base at

WPAFB.

(a) The installation office responsible for providing the EMS training is 88 ABW/CEVY

(b) The training requires less than thirty minutes

(c) The EMS Awareness-level training shall be accomplished within thirty days of contract (or modification) award. New contract employees shall be trained within thirty days of starting work on the installation.

(d) The EMS Awareness-level training is available via the 88 ABW/CEVY website

(https://wrigem.wpafb.af.mil/viewchild.cfm?id=228), which provides materials that meet the training requirement.

(e) Upon completion of the training, the contractor shall provide the AF program manager (PM) a list of the contractor employees' names and the date the training was completed.

PKOC H-019

PKOC H-019 Progress Meetings (NOV 2010)

The contractor shall be responsible for conducting project progress meetings at least every two weeks. The days and times shall be coordinated after contract award.

The meeting shall discuss at a minimum:

- Work elements completed or scheduled to be completed

- Open Requests for Information (RFI)

- Submittals

- Schedule discussion (Percentages scheduled to be complete/Percentages actually completed)

- Project Issues/Action Items

- Change Order Status

Progress meeting minutes shall be provided to all individuals attending and all other individuals deemed vital to the project. A sample format of the progress meeting minutes can be provided by ASC/PKOC upon request after contract award.

https://wrigem.wpafb.af.mil/viewchild.cfm?id=228

ASC/PKO H-002 - Delivery Procedures Commercial Vehicles (JUL 2005)

All vehicles larger than a large pick-up truck are required to be inspected by the Wright-Patterson Air Force Base

Commercial Vehicle Delivery Gate (CVDG) prior to entering the installation. Vehicles to be inspected include, but are not limited to, the following:

1. Step van/panel truck

2. Tractor/trailer, box and flat bed containing cargo

3. Tanker trucks

4. Box trucks

5. Tour buses

6. Garbage/recycled waste trucks

7. Concrete trucks/mixers, dump trucks

8. Cranes, recreational vehicles, petroleum tanker

This inspection will be conducted at Gate 16A located off State Route 444.

The following are exemptions to vehicles utilizing the CVDG:

1. If the vehicle has the product inside (concrete and asphalt trucks) and timely delivery is necessary due to product deterioration it does not need to enter the CVDG. To bypass the CVDG, the contractor shall submit a list containing drivers’ names, social security numbers and the state in which the driver's license is held for those drivers who will be entering the base. This shall be accomplished 24 hours prior to requested entry time. If entry is requested on

Monday, this list must be submitted by Friday at 1630 hours. All lists shall be submitted to the 88th ABW/CE

Directorate contract inspector. The only gates that may be used under this exemption shall be 15A, 26A, 38A, and gate 1B. If the driver's name is not on the list, he/she will not be allowed access to the installation through these gates and the base will not assume liability for denied access.

2. If a delivery vehicle must exit, and then re-enter the base to complete its route, the vehicle shall be resealed upon exiting the base. After initially passing through the commercial vehicle delivery gate, trucks shall be resealed at

Gates 15A, 38A and 22B. The resealing of the trucks will allow them to continue to any other area of the installation

(Areas A, B, or Kittyhawk) without reprocessing through the CVDG. To receive resealing assistance, the drivers shall physically stop at one of the three authorized gates and request the installation entry controller to reseal their truck and provide the next location of their delivery. The controller will reseal the truck and give the delivery driver a pre-clearance form. The driver shall present the pre-clearance form to the entry controller at the next point of installation entry. This reentry can be through any base gate.

Vehicles may be subject to an inspection at any of installation entry control points during a directed random antiterrorism measure (RAM.) Any commercial vehicle, regardless of size, can be directed to the CVDG at the discretion of the installation entry controller.

ASC/PKO H003 PROCEDURES FOR RETURNING GOVERNMENT-ISSUED IDENTIFICATION (DECEMBER

2006)

The Contractor shall use the following procedures for returning Government-issued identification. Government-issued identification includes, but is not limited to, the common access card (CAC), vehicle stickers, medical center badges, and badges required for entry into buildings or secured areas of the base.

It is the Contractor’s responsibility to ensure all Government-issued identification is safeguarded from theft or misuse as well as returned to the Government upon expiration or termination of the contract or order. Contractors shall follow these instructions at the end of each option year, if applicable, regardless of the decision to exercise the next option.

RETURNING GOVERNMENT-ISSUED IDENTIFICATION

1. The Contractor’s Contract Manager (or Program Manager) shall be responsible for collecting all

Government-issued identification.

2. The Contractor shall contact Security Forces at (937) 257-6506 to schedule an appointment for identification return. All identification for this contract or order shall be returned during this appointment with minimal exception.

3. Upon return of all identification Security Forces will provide the Contractor with a letter verifying receipt of identification. This letter will identify any badges that were not returned.

4. Medical center badges shall be returned to the medical center staff. The Contractor shall obtain a letter of receipt from the medical center staff.

5. Final invoices will not be paid until letters of receipt are received by the acceptor identified in this contract or order.

6. The Government may withhold monetary consideration from the final invoice for identification(s) that are not returned.

7. The Government reserves the right to consider the Contractor’s history of returning Government-issued identification when evaluating past performance and responsibility for future awards. Failure to return

Government-issued identification may result in ineligibility for future contract awards if the contractor is barred from the base.

(End)

Section I - Contract Clauses

PKOC I-001

PKOC I-001 - PREPARATION OF MATERIAL APPROVAL SUBMITTALS (NOV 2010)

The materials and workmanship submittals shall be done in accordance with AF Form 3000 “Material Approval

Submittal” instructions.

(End of clause)

PKOC I-002

PKOC I-002 - ENGLISH LANGUAGE REQUIREMENTS (Jul 2011)

(a) Deliver all documents in the English language.

(b) Provide an English language speaking person during on-site visits, inspections, reviews, audits, and other similar activities.

52.202-1 Definitions JAN 2012

52.203-3 Gratuities APR 1984

52.203-5 Covenant Against Contingent Fees APR 1984

52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006

52.203-7 Anti-Kickback Procedures OCT 2010

52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or

Improper Activity

JAN 1997

52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity JAN 1997

52.203-12 Limitation On Payments To Influence Certain Federal

Transactions

OCT 2010

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber

Content Paper

MAY 2011

52.204-7 Central Contractor Registration FEB 2012

52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011

52.209-6 Protecting the Government's Interest When Subcontracting

With Contractors Debarred, Suspended, or Proposed for

Debarment

DEC 2010

52.214-29 Order Of Precedence--Sealed Bidding JAN 1986

52.219-6 Notice Of Total Small Business Set-Aside NOV 2011

52.219-8 Utilization of Small Business Concerns JAN 2011

52.222-3 Convict Labor JUN 2003

52.222-4 Contract Work Hours and Safety Standards Act - Overtime

Compensation

JUL 2005

52.222-6 Davis Bacon Act JUL 2005

52.222-7 Withholding of Funds FEB 1988

52.222-8 Payrolls and Basic Records JUN 2010

52.222-9 Apprentices and Trainees JUL 2005

52.222-10 Compliance with Copeland Act Requirements FEB 1988

52.222-11 Subcontracts (Labor Standards) JUL 2005

52.222-12 Contract Termination-Debarment FEB 1988

52.222-13 Compliance with Davis-Bacon and Related Act Regulations. FEB 1988

52.222-14 Disputes Concerning Labor Standards FEB 1988

52.222-15 Certification of Eligibility FEB 1988

52.222-21 Prohibition Of Segregated Facilities FEB 1999

52.222-26 Equal Opportunity MAR 2007

52.222-27 Affirmative Action Compliance Requirements for

Construction

FEB 1999

52.222-35 Equal Opportunity for Veterans SEP 2010

52.222-36 Affirmative Action For Workers With Disabilities OCT 2010

52.222-37 Employment Reports on Veterans SEP 2010

52.222-40 Notification of Employee Rights Under the National Labor

Relations Act

DEC 2010

52.222-50 Combating Trafficking in Persons FEB 2009

52.222-54 Employment Eligibility Verification JAN 2009

52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011

52.223-5 Alt I Pollution Prevention and Right-to-Know Information (May

2011) Alternate I

MAY 2011

52.223-6 Drug-Free Workplace MAY 2001

52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts

MAY 2008

52.225-13 Restrictions on Certain Foreign Purchases JUN 2008

52.227-1 Authorization and Consent DEC 2007

52.227-2 Notice And Assistance Regarding Patent And Copyright

Infringement

DEC 2007

52.227-4 Patent Indemnity-Construction Contracts DEC 2007

52.228-2 Additional Bond Security OCT 1997

52.228-5 Insurance - Work On A Government Installation JAN 1997

52.228-11 Pledges Of Assets JAN 2012

52.228-12 Prospective Subcontractor Requests for Bonds OCT 1995

52.228-14 Irrevocable Letter of Credit DEC 1999

52.228-15 Performance and Payment Bonds--Construction OCT 2010

52.229-3 Federal, State And Local Taxes APR 2003

52.232-5 Payments under Fixed-Price Construction Contracts SEP 2002

52.232-17 Interest OCT 2010

52.232-23 Assignment Of Claims JAN 1986

52.232-27 Prompt Payment for Construction Contracts OCT 2008

52.232-33 Payment by Electronic Funds Transfer--Central Contractor

Registration

OCT 2003

52.233-1 Disputes JUL 2002

52.233-3 Protest After Award AUG 1996

52.233-4 Applicable Law for Breach of Contract Claim OCT 2004

52.236-2 Differing Site Conditions APR 1984

52.236-3 Site Investigation and Conditions Affecting the Work APR 1984

52.236-5 Material and Workmanship APR 1984

52.236-6 Superintendence by the Contractor APR 1984

52.236-7 Permits and Responsibilities NOV 1991

52.236-8 Other Contracts APR 1984

52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements

APR 1984

52.236-10 Operations and Storage Areas APR 1984

52.236-11 Use and Possession Prior to Completion APR 1984

52.236-12 Cleaning Up APR 1984

52.236-13 Accident Prevention NOV 1991

52.236-15 Schedules for Construction Contracts APR 1984

52.236-16 Quantity Surveys APR 1984

52.236-21 Specifications and Drawings for Construction FEB 1997

52.236-26 Preconstruction Conference FEB 1995

52.242-13 Bankruptcy JUL 1995

52.242-14 Suspension of Work APR 1984

52.243-1 Alt III Changes--Fixed Price (Aug 1987) - Alternate III APR 1984

52.243-4 Changes JUN 2007

52.244-6 Subcontracts for Commercial Items DEC 2010

52.246-21 Warranty of Construction MAR 1994

52.248-3 Value Engineering-Construction OCT 2010

52.249-2 Termination For Convenience Of The Government (Fixed-

Price)

APR 2012

52.249-2 Alt I Termination for Convenience of the Government (Fixed-

Price) (Apr 2012) - Alternate I

SEP 1996

52.249-10 Default (Fixed-Price Construction) APR 1984

52.253-1 Computer Generated Forms JAN 1991

252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense-

Contract-Related Felonies

DEC 2008

252.203-7002 Requirement to Inform Employees of Whistleblower Rights JAN 2009

252.204-7003 Control Of Government Personnel Work Product APR 1992

252.204-7004 Alt A Central Contractor Registration Alternate A SEP 2007

252.209-7004 Subcontracting With Firms That Are Owned or Controlled By

The Government of a Terrorist Country

DEC 2006

252.223-7006 Prohibition On Storage And Disposal Of Toxic And

Hazardous Materials

APR 2012

252.225-7012 Preference For Certain Domestic Commodities JUN 2010

252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

MAR 2008

252.232-7010 Levies on Contract Payments DEC 2006

252.236-7000 Modification Proposals-Price Breakdown DEC 1991

252.243-7001 Pricing Of Contract Modifications DEC 1991

252.243-7002 Requests for Equitable Adjustment MAR 1998

252.245-7004 Reporting, Reutilization, and Disposal APR 2012

52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS

(FEB 2012)

(a) Definitions. As used in this clause:

Executive means officers, managing partners, or any other employees in management positions.

First-tier subcontract means a subcontract awarded directly by a Contractor to furnish supplies or services (including construction) for performance of a prime contract, but excludes supplier agreements with vendors, such as long-term arrangements for materials or supplies that would normally be applied to a Contractor's general and administrative expenses or indirect cost.

Total compensation means the cash and noncash dollar value earned by the executive during the Contractor's preceding fiscal year and includes the following (for more information see 17 CFR 229.402(c)(2)):

(1) Salary and bonus.

(2) Awards of stock, stock options, and stock appreciation rights. Use the dollar amount recognized for financial statement reporting purposes with respect to the fiscal year in accordance with the Financial Accounting Standards

Board's Accounting Standards Codification (FASB ASC) 718, Compensation-Stock Compensation.

(3) Earnings for services under non-equity incentive plans. This does not include group life, health, hospitalization or medical reimbursement plans that do not discriminate in favor of executives, and are available generally to all salaried employees.

(4) Change in pension value. This is the change in present value of defined benefit and actuarial pension plans.

(5) Above-market earnings on deferred compensation which is not tax-qualified.

(6) Other compensation, if the aggregate value of all such other compensation (e.g., severance, termination payments, value of life insurance paid on behalf of the employee, perquisites or property) for the executive exceeds

$10,000.

(b) Section 2(d)(2) of the Federal Funding Accountability and Transparency Act of 2006 (Pub. L. 109-282), as amended by section 6202 of the Government Funding Transparency Act of 2008 (Pub. L. 110-252), requires the

Contractor to report information on subcontract awards. The law requires all reported information be made public, therefore, the Contractor is responsible for notifying its subcontractors that the required information will be made public.

(c)(1) Unless otherwise directed by the contracting officer, by the end of the month following the month of award of a first-tier subcontract with a value of $25,000 or more, (and any modifications to these subcontracts that change previously reported data), the Contractor shall report the following information at http://www.fsrs.gov for each first-tier subcontract. (The Contractor shall follow the instructions at http://www.fsrs.gov to report the data.)

(i) Unique identifier (DUNS Number) for the subcontractor receiving the award and for the subcontractor's parent company, if the subcontractor has a parent company.

(ii) Name of the subcontractor.

(iii) Amount of the subcontract award.

(iv) Date of the subcontract award.

(v) A description of the products or services (including construction) being provided under the subcontract, including the overall purpose and expected outcomes or results of the subcontract.

(vi) Subcontract number (the subcontract number assigned by the Contractor).

(vii) Subcontractor's physical address including street address, city, state, and country. Also include the nine-digit zip code and congressional district.

(viii) Subcontractor's primary performance location including street address, city, state, and country. Also include the nine-digit zip code and congressional district.

(ix) The prime contract number, and order number if applicable.

http://www.fsrs.gov/ http://frwebgate.access.gpo.gov/cgi-bin/leaving.cgi?from=leavingFR.html&log=linklog&to=http://www.fsrs.gov

(x) Awarding agency name and code.

(xi) Funding agency name and code.

(xii) Government contracting office code.

(xiii) Treasury account symbol (TAS) as reported in FPDS.

(xiv) The applicable North American Industry Classification System code (NAICS).

(2) By the end of the month following the month of a contract award, and annually thereafter, the Contractor shall report the names and total compensation of each of the five most highly compensated executives for the Contractor's preceding completed fiscal year in the Central Contractor Registration (CCR) database via https://www.acquisition.gov, if--

(i) In the Contractor's preceding fiscal year, the Contractor received--

(A) 80 percent or more of its annual gross revenues from Federal contracts (and subcontracts), loans, grants (and subgrants) and cooperative agreements; and

(B) $25,000,000 or more in annual gross revenues from Federal contracts (and subcontracts), loans, grants (and

(ii) The public does not have access to information about the compensation of the executives through periodic reports filed under section 13(a) or 15(d) of the Securities Exchange Act of 1934 (15 U.S.C. 78m(a), 78o(d)) or section 6104 of the Internal Revenue Code of 1986. (To determine if the public has access to the compensation information, see the U.S. Security and Exchange Commission total compensation filings at http://www.sec.gov/answers/execomp.htm.)

(3) Unless otherwise directed by the contracting officer, by the end of the month following the month of a first-tier subcontract with a value of $25,000 or more, and annually thereafter, the Contractor shall report the names and total compensation of each of the five most highly compensated executives for each first-tier subcontractor for the subcontractor's preceding completed fiscal year at http://www.fsrs.gov, if--

(i) In the subcontractor's preceding fiscal year, the subcontractor received--

(A) 80 percent or more of its annual gross revenues from Federal contracts (and subcontracts), loans, grants (and

(B) $25,000,000 or more in annual gross revenues from Federal contracts (and subcontracts), loans, grants (and

(ii) The public does not have access to information about the compensation of the executives through periodic reports filed under section 13(a) or 15(d) of the Securities Exchange Act of 1934 (15 U.S.C. 78m(a), 78o(d)) or section 6104 of the Internal Revenue Code of 1986. (To determine if the public has access to the compensation information, see the U.S. Security and Exchange Commission total compensation filings at http://www.sec.gov/answers/execomp.htm.)

(d)(1) If the Contractor in the previous tax year had gross income, from all sources, under $300,000, the Contractor is exempt from the requirement to report subcontractor awards.

(2) If a subcontractor in the previous tax year had gross income from all sources under $300,000, the Contractor does not need to report awards to that subcontractor.

https://www.acquisition.gov/ http://frwebgate.access.gpo.gov/cgi-bin/leaving.cgi?from=leavingFR.html&log=linklog&to=http://www.sec.gov/answers/execomp.htm http://frwebgate.access.gpo.gov/cgi-bin/leaving.cgi?from=leavingFR.html&log=linklog&to=http://www.fsrs.gov http://frwebgate.access.gpo.gov/cgi-bin/leaving.cgi?from=leavingFR.html&log=linklog&to=http://www.sec.gov/answers/execomp.htm

(e) Phase-in of reporting of subcontracts of $25,000 or more.

(1) Until September 30, 2010, any newly awarded subcontract must be reported if the prime contract award amount was $20,000,000 or more.

(2) From October 1, 2010, until February 28, 2011, any newly awarded subcontract must be reported if the prime contract award amount was $550,000 or more.

(3) Starting March 1, 2011, any newly awarded subcontract must be reported if the prime contract award amount was

$25,000 or more.

52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (FEB 2012)

(a) The Contractor shall update the information in the Federal Awardee Performance and Integrity Information

System (FAPIIS) on a semi-annual basis, throughout the life of the contract, by posting the required information in the Central Contractor Registration database via https://www.acquisition.gov.

(b) As required by section 3010 of the Supplemental Appropriations Act, 2010 (Pub. L. 111-212), all information posted in FAPIIS on or after April 15, 2011, except past performance reviews, will be publicly available. FAPIIS consists of two segments--

(1) The non-public segment, into which Government officials and the Contractor post information, which can only be viewed by--

(i) Government personnel and authorized users performing business on behalf of the Government; or

(ii) The Contractor, when viewing data on itself; and

(2) The publicly-available segment, to which all data in the non-public segment of FAPIIS is automatically transferred after a waiting period of 14 calendar days, except for--

(i) Past performance reviews required by subpart 42.15;

(ii) Information that was entered prior to April 15, 2011; or

(iii) Information that is withdrawn during the 14-calendar-day waiting period by the Government official who posted it in accordance with paragraph (c)(1) of this clause.

(c) The Contractor will receive notification when the Government posts new information to the Contractor's record.

(1) If the Contractor asserts in writing within 7 calendar days, to the Government official who posted the information, that some of the information posted to the non-public segment of FAPIIS is covered by a disclosure exemption under the Freedom of Information Act, the Government official who posted the information must within 7 calendar days remove the posting from FAPIIS and resolve the issue in accordance with agency Freedom of

Information procedures, prior to reposting the releasable information. The contractor must cite 52.209-9 and request removal within 7 calendar days of the posting to FAPIIS.

(2) The Contractor will also have an opportunity to post comments regarding information that has been posted by the

Government. The comments will be retained as long as the associated information is retained, i.e., for a total period of 6 years. Contractor comments will remain a part of the record unless the Contractor revises them.

(3) As required by section 3010 of Pub. L. 111-212, all information posted in FAPIIS on or after April 15, 2011, except past performance reviews, will be publicly available.

(d) Public requests for system information posted prior to April 15, 2011, will be handled under Freedom of

Information Act procedures, including, where appropriate, procedures promulgated under E.O. 12600.

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the

Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 270 days after the notice to proceed. *The time stated for completion shall include final cleanup of the premises.

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $224.19 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

52.219-14 LIMITATIONS ON SUBCONTRACTING (NOV 2011)

(a) This clause does not apply to the unrestricted portion of a partial set-aside.

(b) Applicability. This clause applies only to--

(1) Contracts that have been set aside or reserved for small business concerns or 8(a) concerns;

(2) Part or parts of a multiple-award contract that have been set aside for small business concerns or 8(a) concerns;

and

(3) Orders set aside for small business or 8(a) concerns under multiple-award contracts as described in 8.405-5 and

16.505(b)(2)(i)(F).

(c) By submission of an offer and execution of a contract, the Offeror/Contractor agrees that in performance of the contract in the case of a contract for--

(1) Services (except construction). At least 50 percent of the cost of contract performance incurred for personnel shall be expended for employees of the concern.

(2) Supplies (other than procurement from a nonmanufacturer of such supplies). The concern shall perform work for at least 50 percent of the cost of manufacturing the supplies, not including the cost of materials.

(3) General construction. The concern will perform at least 15 percent of the cost of the contract, not including the cost of materials, with its own employees.

(4) Construction by special trade contractors. The concern will perform at least 25 percent of the cost of the contract, not including the cost of materials, with its own employees.

52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (APR 2012)

(a) Definitions. As used in this clause--

Long-term contract means a contract of more than five years in duration, including options. However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.

Small business concern means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause. Such a concern is ``not dominant in its field of operation'' when it does not exercise a controlling or major influence on a national basis in a kind of business activity in which a number of business concerns are primarily engaged. In determining whether dominance exists, consideration shall be given to all appropriate factors, including volume of business, number of employees, financial resources, competitive status or position, ownership or control of materials, processes, patents, license agreements, facilities, sales territory, and nature of business activity.

(b) If the Contractor represented that it was a small business concern prior to award of this contract, the Contractor shall rerepresent its size status according to paragraph (e) of this clause or, if applicable, paragraph (g) of this clause, upon the occurrence of any of the following:

(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.

(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.

(3) For long-term contracts--

(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and

(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.

(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code assigned to this contract.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .