Question 2.doc
DOC document 24 KB Posted
- Attached to
- RECOVERY--PROJECT NUMBER ZHTV0819032, Repair Walls Phase 2 Building 11420 at Wright Patterson AFB
- Solicitation number
- FA8601-10-R-0021
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Safety Health Plan Requirement | — | |
| FFPAddendum.doc | DOC document | |
| Section 01 33 00.pdf | ||
| Amendment 4.doc | DOC document | |
| Section 01 01 50.pdf | ||
| Question 4.doc | DOC document | |
| Amendment 3.doc | DOC document | |
| Question 3.doc | DOC document | |
| Amendment 2.doc | DOC document | |
| Site Visit Sign in Sheet - 17 FEB 2010.pdf | ||
| Question 1.doc | DOC document | |
| Site Visit 2 - 17 Feb 2010 - 1400.doc | DOC document | |
| Wage Decision 2.docx | DOCX document | |
| Amendment 1.doc | DOC document | |
| Site Visit Sign in Sheet - 2 FEB 2010.pdf | ||
| Wage Decision.docx | DOCX document | |
| Solicitation.doc | DOC document | |
| STATEMENT OF WORK.pdf | ||
| Drawings.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. It was verbally stated during the walk-through that the new drywall is to be done in the same manner as the existing which appears not to be finished at all. In fact an exposable area does not show corner bead. Please confirm as the specifications call for a level 4 finish and two coats of primer on the drywall that will not be exposed.
Upon further discussion, it has been determined that all contractors shall follow the current Scope of Work requirements for the specific primer and wall finish listed. The primer is being utilized to minimize mold reappearing, and ensure proper surface for adhesion of acoustical panels.
2. It was verbally stated that the existing wallpaper is to have the adhesive removed for mold remediation. Please confirm.
Removal of "adhesive" is incorrect. Please refer to the Scope of Work and accompanying drawings for proper course of action in regards to the wall covering.
3. Mold remediation contractors will not guarantee that mold will not reappear. How does this affect our warranty?
Civil Engineering has prescribed a course of action, which shall be executed. As long as the Contractor adheres to those requirements and accomplishes the work accordingly, they wouldn’t be liable for any mold that reappears.
File details come from the government source that posted it. Updated .