About this file

Questions and Responses

View the file

Other files

File Type Posted
Safety Health Plan Requirement —
FFPAddendum.doc DOC document
Section 01 33 00.pdf PDF
Amendment 4.doc DOC document
Section 01 01 50.pdf PDF
Question 4.doc DOC document
Amendment 3.doc DOC document
Question 3.doc DOC document
Amendment 2.doc DOC document
Question 2.doc DOC document
Site Visit Sign in Sheet - 17 FEB 2010.pdf PDF
Site Visit 2 - 17 Feb 2010 - 1400.doc DOC document
Wage Decision 2.docx DOCX document
Amendment 1.doc DOC document
Site Visit Sign in Sheet - 2 FEB 2010.pdf PDF
Wage Decision.docx DOCX document
Solicitation.doc DOC document
STATEMENT OF WORK.pdf PDF
Drawings.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

This Request for Information is in reference to Room 108 on drawing A-2, note 2:

1. What is the type of material was used for the wall covering?

Exact product information is unavailable. Contractor shall verify material at site visit(s).

2. What is the type of adhesive used for the above material?

Exact adhesive information is unavailable. Contractor shall consider adhesive options that are used with wall coverings and plan accordingly when executing scope of work.

3. If existing wall covering is damaged, can prime contractor furnish and install new wall covering and transition piece to coordinate with existing?

If wall covering is damaged, contractor shall transition. All transitions shall occur at interior wall corners. Transitions shall not occur mid-wall or at exterior wall corners.