About this file

Addendum 1 - Attachment 5 Section J

View the file

Other files

File Type Posted
Safety Health Plan Requirement —
Section 01 33 00.pdf PDF
Amendment 4.doc DOC document
Section 01 01 50.pdf PDF
Question 4.doc DOC document
Amendment 3.doc DOC document
Question 3.doc DOC document
Amendment 2.doc DOC document
Question 2.doc DOC document
Site Visit Sign in Sheet - 17 FEB 2010.pdf PDF
Question 1.doc DOC document
Site Visit 2 - 17 Feb 2010 - 1400.doc DOC document
Wage Decision 2.docx DOCX document
Amendment 1.doc DOC document
Site Visit Sign in Sheet - 2 FEB 2010.pdf PDF
Wage Decision.docx DOCX document
Solicitation.doc DOC document
STATEMENT OF WORK.pdf PDF
Drawings.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NUMBER 1

to

DRAWINGS AND SPECIFICATIONS

for Repair Walls, Phase 2

Facility 11420

WRIGHT-PATTERSON AIR FORCE BASE, OHIO

PROJECT #: 08-1903-2R

1.

The contract Drawings and Specifications are hereby amended in part as follows:

A.

Specifications added, Sections 010150 and 013300, in order to address General Requirements and Submittal Procedures. Safety and Health Plan requirements are also added.

2.

This Addendum Number 1 hereby forms and is made a part of the above named project drawings and specifications.

February 2010