This document provides details for a federal contract opportunity to provide Contractor Logistics Support services for the Link-16 Alaska system. Key information includes the services required such as program management, cybersecurity, help desk support, training, teardown and testing, repair, software distribution, and travel. The contract is intended to be a five-year IDIQ with a mixture of firm fixed price, cost plus fixed fee, and cost reimbursable pricing. The solicitation is anticipated to be released on March 22, 2019. The NAICS code is 541330 for engineering services. The opportunity will be competed fully and openly.
Amendment 003
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
JSU
2. AMENDMENT/MODIFICATION NO.
FA8574-19-R-0002-0003
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ. NO.
TBD
5. PROJECT NO (If applicable)
N/A
6. ISSUED BY CODE
AVIONICS, AFLCMC/WNKE C31N
235 BYRON ST STE 19A
BLDG 301 CML PHN 478 926 7462
ROBINS AFB GA 31098-1670
BUYER: Lauren M. Griffin/WNKF lauren.griffin.2@us.af.mil Phone: (478) 926- 7465 No Collect Calls
7. ADMINISTERED BY (If other than item 6) CODEFA8574
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE
X
9A. AMENDMENT OF SOLICITATION NO.
FA857419R0002
9B. DATED (SEE ITEM 11)
22-MAR-2019
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
15A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR
BY ________________________________________________________
(Signature of person authorized to sign)
15C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16B. UNITED STATES OF AMERICA
BY ____________________________________________________
(Signature of Contracting Officer)
16C. DATE SIGNED
FACILITY CODE
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (REV. 10-83)
PRESCRIBED BY GSA
FAR (48 CFR) 53.243
X
X
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION
The purpose of this amendment is as follows:
a. To remove the Production of Additional Sites as a requirement. CLINs X008 have been changed as follows:
FROM: X008 - Production
TO: X008 - Reserved
b. To incorporate the revised Attachment 3 - Performance Work Statement (PWS) dated 25 February 2019, as attached in Section J. Section 7.0 of the PWS was updated to reflect "Reserved."
c. To incorporate the revised Attachment 9 - Excel Price Model, as attached in Section J.
d. To update Section M, Evaluation Factors for Award. Section 3.4.3, Total Evaluated Price, was updated to remove CLIN x008 from the Total Evaluated Price.
e. The proposal due date of 21 May 2019, 4:00PM, EST, found in Block 9 of the RFP remains unchanged.
f. All other terms and conditions remain unchanged.
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
Program Management
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
9 MO
NSN: R425
Program Management Program Managament IAW PWS dated 25 Feb 2019, Paragraph 4.8
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ IAW PWS 9 MO TBC
Proposed Period of Performance
+ IAW PWS 9 MO
Cybersecurity
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
9 MO
R425 Cybersecurity Cybersecurity IAW PWS dated 25 Feb 2019, Paragraph 4.9
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ IAW PWS 9 MO TBC
Proposed Period of Performance
+ IAW PWS 9 MO
Help Desk
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
9 MO
R425 Help Desk Help Desk IAW PWS dated 25 Feb 2019, Paragraph 4.2.1
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Help Desk
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ IAW PWS 9 MO TBC
Proposed Period of Performance
+ IAW PWS 9 MO
Training
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
EA
R425 Training Class I ODS Substance Application/Use Quantity None
Training - System Administrative
Item No.
0004AA
Firm Fixed Price Quantity U/I Unit Price Amount
4 EA
R425 Training - System Administrative Traning - System Administrative Training IAW PWS dated 25 Feb 2019, Paragraph 4.11.C
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity
Training - System Administrative
None Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
+ IAW PWS 4 EA TBC
Proposed Delivery
+ IAW PWS 4 EA
Training - Operational
Item No.
0004AB
Firm Fixed Price Quantity U/I Unit Price Amount
4 EA
R425 Training - Operational Training - Operational Training IAW PWS dated 25 Feb 2019, Paragraph 4.11.A
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
+ IAW PWS 4 EA TBC
Proposed Delivery
+ IAW PWS 4 EA
Training - Maintenance
Item No.
0004AC
Firm Fixed Price
Training - Maintenance
Quantity U/I Unit Price Amount
4 EA
R425 Training - Maintenance Training - Maintenance Training IAW PWS dated 25 Feb 2019, Paragraph 4.11.B
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
+ IAW PWS 4 EA TBC
Proposed Delivery
+ IAW PWS 4 EA
Teardown, Test and Evaluation (TT&E)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
10 EA
R425 Teardown, Test and Evaluation (TT&E) Teardown, Test and Evaluation (TT&E) IAW PWS dated 25 Feb 2019, Paragraph 4.7.1
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
None
Teardown, Test and Evaluation (TT&E)
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ IAW PWS 10 EA TBC
Proposed Period of Performance
+ IAW PWS 10 EA
Repair
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount 10 EA To be Negotiated
R425 Repair Repair IAW PWS dated 25 Feb 2019, Paragraphs 4.7.2 - 4.7.6
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ IAW PWS 10 EA TBC
Proposed Period of
+ IAW PWS 10 EA
Software Distribution
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO To be Negotiated
R425 Software Distribution Software Distribution IAW PWS dated 25 Feb 2019, Paragraph 4.4.1.1
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ IAW PWS 1 LO TBC
Proposed Period of Performance
+ IAW PWS 1 LO
Reserved
Item No.
To Be Negotiated Quantity U/I Unit Price
TBN
R425 Reserved Class I ODS Substance Application/Use Quantity None
Over and Above
Item No.
Cost Plus Fixed Fee
Over and Above
Quantity U/I Estimated Cost Fixed Fee Est Total Cost 1 LO To be Negotiated
R425 Over and Above Over and Above IAW PWS dated 25 Feb 2019, Paragraph 4.2.2
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ IAW PWS 1 LO TBC
Proposed Period of Performance
+ IAW PWS 1 LO
Block Cycle Changes (BCC)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO To be Negotiated
R425 Block Cycle Change (BCC) Block Cycle Change (BCC) IAW PWS dated 25 Feb 2019, Paragraphs 4.10
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
Block Cycle Changes (BCC)
None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ IAW PWS 1 LO TBC
Proposed Period of Performance
+ IAW PWS 1 LO
Block Cycle Change (BCC)
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost 1 LO To be Negotiated
R425 Block Cycle Change (BCC) Block Cycle Change (BCC) IAW PWS dated 25 Feb 2019, Paragraphs 4.10
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ IAW PWS 1 LO TBC
Proposed Period of
+ IAW PWS 1 LO
Unscheduled Maintenance
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
4 LO
R425 Unscheduled Maintenance Unscheduled Maintenance IAW PWS dated 25 Feb 2019, Paragraph 4.2.2
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ IAW PWS 4 LO TBC
Proposed Period of Performance
+ IAW PWS 4 LO
Travel
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel Travel IAW PWS dated 25 Feb 2019, Paragraph 4.6
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required
The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Travel
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ IAW PWS 1 LO TBC
Proposed Period of Performance
+ IAW PWS 1 LO
Data
Item No.
Firm Fixed Price Quantity U/I Amount 1 LO Not Separately Priced
R425 Data Data IAW PWS dated 25 Feb 2019, Paragraph 4.3
Document Identifier
DID Title
A001 DI-MGMT-81804 IUID Marking Activity and Verification Report A002 DI-ENVR-81375 Environmental Health and Safety Plan (HSP) A003 DI-SAFT-81563/T Accident/Incident Report A004 DI-OCIC-80736 Quality Deficiency Report A005 DI-CMAN-80639C Engineering Change Proposal (ECP) A006 DI-IPSC-81442 Software Version Description A007 DI-IPSC-81431A System Requirements Document A008 DI-CMAN-81248A Interface Control Document (ICD) A009 DI-MISC-80071E Parts Approval Request
A00A
DI-OCIC-80125B
DI-OCIC-80126B
Gov’t Industry Data Exchange Program (GIDEP)
A00B DI-SESS-81758A/T Logistics Product Data A00C Di-NDTI-80566A Test Plans A00D DI-NDTI-80603A Test Procedures A00E Di-NDTI-80809A Test/Inspection Report A00F DI-ADMN-81805 Report, Record of Meeting Minutes A00G DI-SESS-81000E/T Product Drawings/Models and Associated Lists A00H DI-IPSC-81427A Software Development Plan (SDP)
A00J
DI-ADMN-81249A
DI-ADMN-81250A
Conference Agenda and Minutes
Data
A00K DI-MGMT-80368A Status Reports A00L DI-IPSC-81435A Software Design Description A00M DI-IPSC-81436A Interface Design Description (IDD) A00N DI-SESS-81874 Engineering Data for Provisioning (EDFP) A00P DI-IPSC-81433A Software Requirements Specification (SRS) A00Q DI-IPSC-81434A Interface Requirements Specification (IRS) A00R DI-IPSC-81440A Software Test Report A00S DI-IPSC-81439A Software Test Description A00T Di-CMAN-80643A Specification Change Notice A00U DI-IPSC-81432A System Subsystem Design Description (SSDD)
A00V DI-SESS-81656
Data Item Description, Source Data for
Forecasting Diminishing Manufacturing Source and Material Shortages
A00W TM-86-01N Technical Manual Contract Requirement (TMCR) A00X DI-MGMT-81945 Phase-Out Transition Plan A00Y DI-SESS-81875 Configuration Management Plan (CMP) A00Z DI-SESS-81759A/T Logistics Product Data Summaries
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ IAW1423 1 LO TBC
Proposed Period of Performance
+ IAW1423 1 LO
Transition Period
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
Transition Period
R425 Transition Period Transition Period IAW PWS dated 25 Feb 2019, Paragraph 4.8.4
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) On or Before _ Req No / Pri
Required Period of Performance
+ IAW PWS 1 LO 22 JUN 2020
Proposed Period of Performance
+ IAW PWS 1 LO
Program Management
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
12 MO
NSN: R425
Program Management Program Managament IAW PWS dated 25 Feb 2019, Paragraph 4.8
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Program Management
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ IAW PWS 12 MO TBC
Proposed Period of Performance
+ IAW PWS 12 MO
Cybersecurity
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
12 MO
R425 Cybersecurity Cybersecurity IAW PWS dated 25 Feb 2019, Paragraph 4.9
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ IAW PWS 12 MO TBC
Proposed Period of
+ IAW PWS 12 MO
Help Desk
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
12 MO
R425 Help Desk Help Desk IAW PWS dated 25 Feb 2019, Paragraph 4.2.1
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ IAW PWS 12 MO TBC
Proposed Period of Performance
+ IAW PWS 12 MO
Training
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
EA
R425 Training Class I ODS Substance Application/Use Quantity None
Training - System Administrative
Item No.
1004AA
Training - System Administrative
Quantity U/I Unit Price Amount
4 EA
R425 Training - System Administrative Traning - System Administrative Training IAW PWS dated 25 Feb 2019, Paragraph 4.11.C
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
+ IAW PWS 4 EA TBC
Proposed Delivery
+ IAW PWS 4 EA
Item No.
1004AB
R425 Training - Operational Training - Operational Training IAW PWS dated 25 Feb 2019, Paragraph 4.11.A
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
Training - Maintenance
Item No.
1004AC
Training - Maintenance
Quantity U/I Unit Price Amount
4 EA
R425 Training - Maintenance Training - Maintenance Training IAW PWS dated 25 Feb 2019, Paragraph 4.11.B
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
+ IAW PWS 4 EA TBC
Proposed Delivery
+ IAW PWS 4 EA
Teardown, Test and Evaluation (TT&E)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
10 EA
R425 Teardown, Test and Evaluation (TT&E) Teardown, Test and Evaluation (TT&E) IAW PWS dated 25 Feb 2019, Paragraph 4.7.1
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Teardown, Test and Evaluation (TT&E)
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ IAW PWS 10 EA TBC
Proposed Period of Performance
+ IAW PWS 10 EA
Repair
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount 10 EA To be Negotiated
R425 Repair Repair IAW PWS dated 25 Feb 2019, Paragraphs 4.7.2 - 4.7.6
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ IAW PWS 10 EA TBC
Proposed Period of
+ IAW PWS 10 EA
Software Distribution
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO To be Negotiated
R425 Software Distribution Software Distribution IAW PWS dated 25 Feb 2019, Paragraph 4.4.1.1
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ IAW PWS 1 LO TBC
Proposed Period of Performance
+ IAW PWS 1 LO
Reserved
Item No.
To Be Negotiated Quantity U/I Unit Price
EA TBN
R425 Reserved Class I ODS Substance Application/Use Quantity None
Over and Above
Item No.
Cost Plus Fixed Fee
Over and Above
Quantity U/I Estimated Cost Fixed Fee Est Total Cost 1 LO To be Negotiated
R425 Over and Above Over and Above IAW PWS dated 25 Feb 2019, Paragraph 4.2.2
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ IAW PWS 1 LO TBC
Proposed Period of Performance
+ IAW PWS 1 LO
Block Cycle Changes (BCC)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO To be Negotiated
R425 Block Cycle Change (BCC) Block Cycle Change (BCC) IAW PWS dated 25 Feb 2019, Paragraphs 4.10
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
Block Cycle Changes (BCC)
None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ IAW PWS 1 LO TBC
Proposed Period of Performance
+ IAW PWS 1 LO
Block Cycle Change (BCC)
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost 1 LO To be Negotiated
R425 Block Cycle Change (BCC) Block Cycle Change (BCC) IAW PWS dated 25 Feb 2019, Paragraphs 4.10
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ IAW PWS 1 LO TBC
Proposed Period of
Unscheduled Maintenance
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
4 LO
R425 Unscheduled Maintenance Unscheduled Maintenance IAW PWS dated 25 Feb 2019, Paragraph 4.2.2
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ IAW PWS 4 LO TBC
Proposed Period of Performance
+ IAW PWS 4 LO
Travel
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel Travel IAW PWS dated 25 Feb 2019, Paragraph 4.6
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required
The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Travel
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ IAW PWS 1 LO TBC
Proposed Period of Performance
+ IAW PWS 1 LO
Data
Item No.
Firm Fixed Price Quantity U/I Amount 1 LO Not Separately Priced
R425 Data Data IAW PWS dated 25 Feb 2019, Paragraph 4.3
Document Identifier
DID Title
A001 DI-MGMT-81804 IUID Marking Activity and Verification Report A002 DI-ENVR-81375 Environmental Health and Safety Plan (HSP) A003 DI-SAFT-81563/T Accident/Incident Report A004 DI-OCIC-80736 Quality Deficiency Report A005 DI-CMAN-80639C Engineering Change Proposal (ECP) A006 DI-IPSC-81442 Software Version Description A007 DI-IPSC-81431A System Requirements Document A008 DI-CMAN-81248A Interface Control Document (ICD) A009 DI-MISC-80071E Parts Approval Request
A00A
DI-OCIC-80125B
DI-OCIC-80126B
Gov’t Industry Data Exchange Program (GIDEP)
A00B DI-SESS-81758A/T Logistics Product Data A00C Di-NDTI-80566A Test Plans A00D DI-NDTI-80603A Test Procedures A00E Di-NDTI-80809A Test/Inspection Report A00F DI-ADMN-81805 Report, Record of Meeting Minutes A00G DI-SESS-81000E/T Product Drawings/Models and Associated Lists A00H DI-IPSC-81427A Software Development Plan (SDP)
A00J
DI-ADMN-81249A
Data
A00K DI-MGMT-80368A Status Reports A00L DI-IPSC-81435A Software Design Description A00M DI-IPSC-81436A Interface Design Description (IDD) A00N DI-SESS-81874 Engineering Data for Provisioning (EDFP) A00P DI-IPSC-81433A Software Requirements Specification (SRS) A00Q DI-IPSC-81434A Interface Requirements Specification (IRS) A00R DI-IPSC-81440A Software Test Report A00S DI-IPSC-81439A Software Test Description A00T Di-CMAN-80643A Specification Change Notice A00U DI-IPSC-81432A System Subsystem Design Description (SSDD)
A00V DI-SESS-81656
Data Item Description, Source Data for
Forecasting Diminishing Manufacturing Source and Material Shortages
A00W TM-86-01N Technical Manual Contract Requirement (TMCR) A00X DI-MGMT-81945 Phase-Out Transition Plan A00Y DI-SESS-81875 Configuration Management Plan (CMP) A00Z DI-SESS-81759A/T Logistics Product Data Summaries
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ IAW1423 1 LO TBC
Proposed Period of Performance
+ IAW1423 1 LO
Program Management
Program Management
Firm Fixed Price Quantity U/I Unit Price Amount
12 MO
NSN: R425
Program Management Program Managament IAW PWS dated 25 Feb 2019, Paragraph 4.8
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ IAW PWS 12 MO TBC
Proposed Period of Performance
+ IAW PWS 12 MO
Cybersecurity
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
12 MO
R425 Cybersecurity Cybersecurity IAW PWS dated 25 Feb 2019, Paragraph 4.9
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Cybersecurity
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ IAW PWS 12 MO TBC
Proposed Period of Performance
+ IAW PWS 12 MO
Help Desk
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
12 MO
R425 Help Desk Help Desk IAW PWS dated 25 Feb 2019, Paragraph 4.2.1
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ IAW PWS 12 MO TBC
Proposed Period of
+ IAW PWS 12 MO
Training
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
EA
R425 Training Class I ODS Substance Application/Use Quantity None
Training - System Administrative
Item No.
2004AA
Firm Fixed Price Quantity U/I Unit Price Amount
4 EA
R425 Training - System Administrative Traning - System Administrative Training IAW PWS dated 25 Feb 2019, Paragraph 4.11.C
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
+ IAW PWS 4 EA TBC
Proposed Delivery
+ IAW PWS 4 EA
Training - Operational
Item No.
2004AB
Training - Operational
4 EA
R425 Training - Operational Training - Operational Training IAW PWS dated 25 Feb 2019, Paragraph 4.11.A
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
+ IAW PWS 4 EA TBC
Proposed Delivery
+ IAW PWS 4 EA
Training - Maintenance
Item No.
2004AC
Firm Fixed Price Quantity U/I Unit Price Amount
4 EA
R425 Training - Maintenance Training - Maintenance Training IAW PWS dated 25 Feb 2019, Paragraph 4.11.B
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Training - Maintenance
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
+ IAW PWS 4 EA TBC
Proposed Delivery
+ IAW PWS 4 EA
Teardown, Test and Evaluation (TT&E)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
10 EA
R425 Teardown, Test and Evaluation (TT&E) Teardown, Test and Evaluation (TT&E) IAW PWS dated 25 Feb 2019, Paragraph 4.7.1
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ IAW PWS 10 EA TBC
Proposed Period of Performance
+ IAW PWS 10 EA
Repair
Repair
Firm Fixed Price Quantity U/I Unit Price Amount 10 EA To be Negotiated
R425 Repair Repair IAW PWS dated 25 Feb 2019, Paragraphs 4.7.2 - 4.7.6
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ IAW PWS 10 EA TBC
Proposed Period of Performance
+ IAW PWS 10 EA
Software Distribution
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO To be Negotiated
R425 Software Distribution Software Distribution IAW PWS dated 25 Feb 2019, Paragraph 4.4.1.1
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Software Distribution
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ IAW PWS 1 LO TBC
Proposed Period of Performance
+ IAW PWS 1 LO
Reserved
Item No.
To Be Negotiated Quantity U/I Unit Price
EA TBN
R425 Reserved Class I ODS Substance Application/Use Quantity None
Over and Above
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost 1 LO To be Negotiated
R425 Over and Above Over and Above IAW PWS dated 25 Feb 2019, Paragraph 4.2.2
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Over and Above
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ IAW PWS 1 LO TBC
Proposed Period of Performance
+ IAW PWS 1 LO
Block Cycle Changes (BCC)
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO To be Negotiated
R425 Block Cycle Change (BCC) Block Cycle Change (BCC) IAW PWS dated 25 Feb 2019, Paragraphs 4.10
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ IAW PWS 1 LO TBC
Proposed Period of
Block Cycle Change (BCC)
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost 1 LO To be Negotiated
R425 Block Cycle Change (BCC) Block Cycle Change (BCC) IAW PWS dated 25 Feb 2019, Paragraphs 4.10
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ IAW PWS 1 LO TBC
Proposed Period of Performance
+ IAW PWS 1 LO
Unscheduled Maintenance
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
4 LO
R425 Unscheduled Maintenance Unscheduled Maintenance IAW PWS dated 25 Feb 2019, Paragraph 4.2.2
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required
The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Unscheduled Maintenance
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ IAW PWS 4 LO TBC
Proposed Period of Performance
+ IAW PWS 4 LO
Travel
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel Travel IAW PWS dated 25 Feb 2019, Paragraph 4.6
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ IAW PWS 1 LO TBC
Proposed Period of
Data
Item No.
Firm Fixed Price Quantity U/I Amount 1 LO Not Separately Priced
R425 Data Data IAW PWS dated 25 Feb 2019, Paragraph 4.3
Document Identifier
DID Title
A001 DI-MGMT-81804 IUID Marking Activity and Verification Report A002 DI-ENVR-81375 Environmental Health and Safety Plan (HSP) A003 DI-SAFT-81563/T Accident/Incident Report A004 DI-OCIC-80736 Quality Deficiency Report A005 DI-CMAN-80639C Engineering Change Proposal (ECP) A006 DI-IPSC-81442 Software Version Description A007 DI-IPSC-81431A System Requirements Document A008 DI-CMAN-81248A Interface Control Document (ICD) A009 DI-MISC-80071E Parts Approval Request
A00A
DI-OCIC-80125B
DI-OCIC-80126B
Gov’t Industry Data Exchange Program (GIDEP)
A00B DI-SESS-81758A/T Logistics Product Data A00C Di-NDTI-80566A Test Plans A00D DI-NDTI-80603A Test Procedures A00E Di-NDTI-80809A Test/Inspection Report A00F DI-ADMN-81805 Report, Record of Meeting Minutes A00G DI-SESS-81000E/T Product Drawings/Models and Associated Lists A00H DI-IPSC-81427A Software Development Plan (SDP)
A00J
DI-ADMN-81249A
DI-ADMN-81250A
Conference Agenda and Minutes
A00K DI-MGMT-80368A Status Reports A00L DI-IPSC-81435A Software Design Description A00M DI-IPSC-81436A Interface Design Description (IDD) A00N DI-SESS-81874 Engineering Data for Provisioning (EDFP) A00P DI-IPSC-81433A Software Requirements Specification (SRS) A00Q DI-IPSC-81434A Interface Requirements Specification (IRS) A00R DI-IPSC-81440A Software Test Report A00S DI-IPSC-81439A Software Test Description A00T Di-CMAN-80643A Specification Change Notice A00U DI-IPSC-81432A System Subsystem Design Description (SSDD)
A00V DI-SESS-81656
Data Item Description, Source Data for
Forecasting Diminishing Manufacturing Source and Material Shortages
A00W TM-86-01N Technical Manual Contract Requirement (TMCR) A00X DI-MGMT-81945 Phase-Out Transition Plan A00Y DI-SESS-81875 Configuration Management Plan (CMP) A00Z DI-SESS-81759A/T Logistics Product Data Summaries
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ IAW1423 1 LO TBC
Proposed Period of Performance
+ IAW1423 1 LO
Program Management
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
12 MO
NSN: R425
Program Management Program Managament IAW PWS dated 25 Feb 2019, Paragraph 4.8
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Program Management
Required Period of Performance
+ IAW PWS 12 MO TBC
Proposed Period of Performance
+ IAW PWS 12 MO
Cybersecurity
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
12 MO
R425 Cybersecurity Cybersecurity IAW PWS dated 25 Feb 2019, Paragraph 4.9
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ IAW PWS 12 MO TBC
Proposed Period of Performance
+ IAW PWS 12 MO
Help Desk
Item No.
Help Desk
Quantity U/I Unit Price Amount
12 MO
R425 Help Desk Help Desk IAW PWS dated 25 Feb 2019, Paragraph 4.2.1
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ IAW PWS 12 MO TBC
Proposed Period of Performance
+ IAW PWS 12 MO
Training
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
EA
R425 Training Class I ODS Substance Application/Use Quantity None
Training - System Administrative
Item No.
3004AA
Firm Fixed Price
4 EA
Training - System Administrative
R425 Training - System Administrative Traning - System Administrative Training IAW PWS dated 25 Feb 2019, Paragraph 4.11.C
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
+ IAW PWS 4 EA TBC
Proposed Delivery
+ IAW PWS 4 EA
Training - Operational
Item No.
3004AB
Firm Fixed Price Quantity U/I Unit Price Amount
4 EA
R425 Training - Operational Training - Operational Training IAW PWS dated 25 Feb 2019, Paragraph 4.11.A
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Type / Ship To Quantity (U/I) To be cited on individual orders issued
Training - Operational
Required Delivery
+ IAW PWS 4 EA TBC
Proposed Delivery
+ IAW PWS 4 EA
Training - Maintenance
Item No.
3004AC
Firm Fixed Price Quantity U/I Unit Price Amount
4 EA
R425 Training - Maintenance Training - Maintenance Training IAW…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .