This task description outlines requirements for a block cycle upgrade to the Link-16 Alaska system. Key requirements include integrating updated gateway and situational awareness software, replacing proprietary components with COTS/GOTS/government purpose solutions for device and crypto management systems, and updating documentation, training materials, and cybersecurity documentation. The related solicitation indicates the Air Force Life Cycle Management Center intends to issue a request for proposals for contractor logistics support services for the Link-16 Alaska system, including program management, cybersecurity, help desk, training, repair, software distribution, and block cycle changes. The contract would have a one-year base period and four one-year options, with pricing using firm fixed price, cost plus fixed fee, and cost reimbursable no fee arrangements. The requirement is set aside for full and open competition.

Block Cycle Change - Task Description

View the file

Other files for this federal contract opportunity

Other files attached to Link-16 Alaska, newest first.
File Type Posted
FA8574-19-R-0002-0006.pdf PDF
Combined_Vendor_Questions_and_Answers.docx DOCX document
Combined_Vendor_Questions_and_Answers.doc DOC document
FA857419R00020005.pdf PDF
FA857419R00020004.pdf PDF
Combined_Vendor_Questions_and_Answers.doc DOC document
Attachment_9_-_Excel_Price_Model.xlsx XLSX spreadsheet
FA857419R00020003.pdf PDF
Attachment_3_Performance_Work_Statement.pdf PDF
Combined_Vendor_Questions_and_Answers.doc DOC document
FA857419R00020002.pdf PDF
Attachment_9_-_Excel_Price_Model.xlsx XLSX spreadsheet
FA857419R00020001.pdf PDF
Attachment_3_Performance_Work_Statement.pdf PDF
Attachment_12_-_Inspection_&_Acceptance_Requirements.pdf PDF
Attachment_1_-_Cross_Reference_Matrix.docx DOCX document
Attachment_3_-_Performance_Work_Statement_(PWS).pdf PDF
Attachment_14_-_GFP_Listing.pdf PDF
Attachment_7_-_Present_and_Past_Performance_Questionaire.docx DOCX document
Attachment_15_-__Packaging_Requirements.pdf PDF
Attachment_4_-_Client_Authorization_Letter.pdf PDF
Attachment_2_-_Electronic_Format_for_All_Proposal_Volumes.pdf PDF
FA857419R0002.pdf PDF
Attachment_8_-_FACTS_Sheet.doc DOC document
Attachment_5_-_Subcontractor_Teaming_Partner_Consent.docx DOCX document
Attachment_11_-_QASP.PDF PDF
Attachment_6_-_Transmittal_Letter.docx DOCX document
Attachment_17_-_CDRLs.pdf PDF
Attachment_16_-_Transportation.doc DOC document
Attachment_9_-_Excel_Price_Model.xlsx XLSX spreadsheet
Attachment_13_-_DD254.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Task Description

For

Block Cycle Upgrade to Overcome

Proprietary Components in

Link-16 (LAK) 4.1

Communication Control Set Link-16 (LAK)

AN/FSQ-228

DATE PREPARED: 27 Feb 2019

Prepared By: Jeremy Nable

AFLCMC/WNY

255 Byron St. Ste. 19-A

Robins AFB GA 31098-1813

DISTRIBUTION STATEMENT D Distribution authorized to the Department of Defense (DoD) and U.S. DoD contractors only; Specific Authority; Date of determination: 26 July 2017. Other requests for documentation shall be referred to Data Links/Networks Program Office, WR-

ALC/GRWBBA, Robins AFB, GA 31098-1813, or higher DoD authority.

1.0 INTRODUCTION

The purpose of this non-severable task order is for vendor to provide upgrade to the Link-16

Alaska (LAK) system to overcome proprietary system components. In order for the Government to reach a fair and reasonable price for system sustainment, these proprietary components shall be replaced with a combination of COTS, GOTS, and/or Government Purpose data rights so long as the current technical, operational and cyber security requirements are met. The change priority for this system is considered to be medium. LAKs Operating system is currently on a Win 10 baseline. The datalink gateway software is the Government owned Scalable Portable Integrated Data Router (SPIDR) v2. The Block Cycle Upgrade (BCU) will necessitate several changes to the system baseline, support documentation, training and maintenance. The vendor shall perform duties described in FA8574-20-

D-0002 LAK Performance Work Statement. The contractor shall perform the following duties per the BCU paragraphs.

1.1 Tasks shall include, but are not limited to the following:

a. Technical Requirements

(1) Integrate latest SPIDR gateway software into the LAK Management Computer (LMC)

(2) Integrate latest version of Terra Situational Awareness Tool into the LMC

(3) Provide solution to Combined Device Management System (CDMS) without degrading capability

(4) Provide solution to overcome proprietary barrier in Remote Crypto Management System

(RCMS) without overcome proprietary barrier in degrading capability

b. Documentation Requirements:

(1) Update Training Materials as required

(2) Update Operator Positional handbook as required

(3) Update Maintenance Manual as required

(4) Update System Administrator Manual as required

(5) Update Drawing Package as required

(6) Update cyber security documentation as required

c. Training Requirements:

(1) Conduct Operator Delta training

(2) Conduct System Administrator Delta training

(3) Conduct Maintainer Delta training

2.0 SCOPE

BCU 4.2: Primarily, the core of this BCU will be focused on moving the system to a

GOTS/COTS/Government Purpose data rights configuration baseline.

3.0 GOVERNMENT FURNISHED EQUIPMENT/INFORMATION (GFE/I)

Unless otherwise specified, the government will not furnish any equipment or information.

The government will provide the following software as GFE/I:

a. Remote Equipment Management System (REMS)

b. Scalable Portable Integrated Data Router (SPIDR)

c. Terra—Situational Awareness Tool

4.0 GENERAL INFORMATION

a. Assumptions

The Contract award will be issued under the competitive CLS Contract; hence the costs are computed using the provisions of that contract. The period of performance will be 24 months from the time of award. The vendor will not be responsible for delays by the Government.