Attachment_17_-_CDRLs.pdf
PDF 16 MB Posted
- Attached to
- Link-16 Alaska Federal contract opportunity
- Solicitation number
- FA8574-19-R-0002
About this file
This is a synopsis for a Request for Proposals to provide Contractor Logistics Support services for the Link-16 Alaska system. The services include program management, cybersecurity, help desk support, training, equipment teardown, testing and evaluation, repair, software distribution, production support, additional tasks, block changes, unplanned maintenance, shipping, travel, and data services. The Air Force Life Cycle Management Center intends to award an Indefinite Delivery Indefinite Quantity contract with a one-year base period and four one-year options, potentially extending up to six months, with a mixture of firm fixed price, cost plus fixed fee, and cost reimbursable no fee pricing. The North American Industry Classification System code is 541330. Proposals are due by March 22, 2019 but the date may be adjusted.
CDRLs
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
DD FORM 1423-1 (BACK), FEB 2001
data_item: A006 title: Software Version Description sub:
auth: DI-IPSC-81442 ref: PWS Paragraph: 8.1 req_ofc: AFLCMC/WNY dd250: LT appcode: See blk 16 dist: C freq: See blk 16 asof: 0 firstsub: See blk 16 subsub: See blk 16 addressee1: AFLCMC/WNYEDA draft1: 2 reg1: 2 repro1: 0 addressee2: 235 Byron Street draft2:
reg2:
repro2:
addressee3: Suite 19A draft3:
reg3:
repro3:
addressee4: Robins AFB, GA draft4:
reg4:
repro4:
addressee5: 31098 draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 2 total_reg: 2 total_repro: 0 remarks: Block 8: Government approval required Block 9: Distribution Statement C: Distribution authorized to US Government Agenciews and their contractors for administrative or operational use as determined. Other requests for this document referred to AFLCMC/WNY, Robins AFB GA Block 10: With each LAK software release Block 12: As required Block 13: Final version submitted 30 calendar days prior to version fielding Block 14: A letter of transmittal containing CDRL name, CDRL number, contract number, and applicable DID will be sent to the contracting officer (AFLMC/WNKE) with each submission of this CDRL note: Contractor format acceptable IAW DID. SVD will be provided as GFI and contractor shall update if there are changes associated with the version releases.
group:
total_price:
prep_name: Martin Okaiwele prep_sign:
prep_date: 27 Feb 2019 app_by:
app_sign:
app_date: 11 Mar 2019
Page: 1 app: Adobe Professional 7.0 line_item:
exhibit:
xtdp: Off xtm: Off othercat: X system: AN-FSQ-228 Link-16 Alaska (LAK) ctr_no: FD2060-18-34116 contr:
remarksb:
Page2: 2 of_pages: 2
Reset:
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A007 title: System Requirements Document sub:
auth: DI-IPSC-81431A ref: PWS Paragraph: 8.1 req_ofc: AFLCMC/WNY dd250: LT appcode: See blk 16 dist: C freq: See blk 16 asof: 0 firstsub: See blk 16 subsub: See blk 16 addressee1: AFLCMC/WNYEDA draft1: 2 reg1: 2 repro1: 0 addressee2: 235 Byron Street draft2:
reg2:
repro2:
addressee3: Suite 19A draft3:
reg3:
repro3:
addressee4: Robins AFB, GA draft4:
reg4:
repro4:
addressee5: 31098 draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 2 total_reg: 2 total_repro: 0 remarks: Block 8: Government approval required Block 9: Distribution Statement C: Distribution authorized to US Government Agencies and their contractors for administrative or operational use as determined. Other requests for this document referred to AFLCMC/WNY, Robins AFB GA Block 10: With each LAK software release Block 12: As required Block 13: Final version submitted 30 calendar days prior to version fielding group:
total_price:
prep_name: Martin Okaiwele prep_sign:
prep_date: 27 Feb 2019 app_by:
app_sign:
app_date: 11 Mar 2019
Page: 1 app: Adobe Professional 7.0 line_item:
exhibit:
xtdp: Off xtm: Off othercat: X system: AN-FSQ-228 Link-16 Alaska (LAK) ctr_no: FD2060-18-34116 contr:
remarksb:
Page2: 2 of_pages: 2
Reset:
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A008 title: Interface Control Document (ICD) sub:
auth: DI-CMAN-81248A ref: PWS Paragraph: 6.1.7, 8.1 req_ofc: AFLCMC/WNY dd250: LT appcode: A dist: C freq: See blk 16 asof: See blk 16 firstsub: See blk 16 subsub: See blk 16 addressee1: AFLCMC/WNY draft1: 2 reg1: 2 repro1: 0 addressee2: 235 Byron Street draft2:
reg2:
repro2:
addressee3: Suite 19A draft3:
reg3:
repro3:
addressee4: Robins AFB, GA draft4:
reg4:
repro4:
addressee5: 31098 draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 2 total_reg: 2 total_repro: 0 remarks: Block 4: Contractor format is acceptable. Data item to be used as a guide for content.
Block 7: A letter of transmittal containing CDRL name, CDRL number, contract number, and applicable DID will be sent to the AFLCMC/WNKE contracting officer with each submission of this CDRL Block 8: Government disposition will be provided within 20 working days after receipt Block 9: Distribution statement B: Distribution authorized to US Government agencies only (Administrative or operational use) (15 Dec 2006). Other requests for this document shall be referred to AFLCMC/WNY, Robins AFB GA 31098 Block 10-13: As required group:
total_price:
prep_name: Martin Okaiwele prep_sign:
prep_date: 27 Feb 2019 app_by:
app_sign:
app_date: 11 Mar 2019
Page: 1 app: Adobe Professional 7.0 line_item:
exhibit:
xtdp: Off xtm: Off othercat: X system: AN-FSQ-228 Link-16 Alaska (LAK) ctr_no: FD2060-18-34116 contr:
remarksb:
Page2: 2 of_pages: 2
Reset:
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A009 title: Parts Approval Request sub:
auth: DI-MISC-80071E ref: PWS Paragraph: 7.1.2 req_ofc: AFLCMC/WNY dd250: DD appcode: A dist: C freq: See blk 16 asof: See blk 16 firstsub: See blk 16 subsub: See blk 16 addressee1: AFLCMC/WNY draft1: 2 reg1: 2 repro1: 0 addressee2: 235 Byron Street draft2:
reg2:
repro2:
addressee3: Suite 19A draft3:
reg3:
repro3:
addressee4: Robins AFB, GA draft4:
reg4:
repro4:
addressee5: 31098 draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 2 total_reg: 2 total_repro: 0 remarks: Block 4: Contractor format is acceptable on electronic media. Data item to be used as a guide for content.
Block 9: Distribution statement C: Distribution authorized to US Government agencies only (Administrative or operational use) (11/26/07). Other requests for this document shall be referred to AFLCMC/WNY, Robins AFB GA 31098 WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., sec. 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violation of these export laws are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25.
Block 10-13: Reports will be generated when a substitute part is required.
Note: Data will be delivered electronically in Rich Text Format, and/or other govt.
approved word processing format.
group:
total_price:
prep_name: Martin Okaiwele prep_sign:
prep_date: 27 Feb 2019 app_by:
app_sign:
app_date: 11 Mar 19
Page: 1 app: Adobe Professional 7.0 line_item:
exhibit:
xtdp: Off xtm: Off othercat: X system: AN-FSQ-228 Link-16 Alaska (LAK) ctr_no: FD2060-18-34116 contr:
remarksb:
Page2: 2 of_pages: 2
Reset:
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A00A title: Gov’t Industry Data Exchange Program (GIDEP) Safe-Alert Reports and Response sub:
auth: DI-OCIC-80125B & DI-OCIC-80126B ref: PWS Paragraph: 7.1.4, 7.1.4.2 req_ofc: AFLCMC/WNY dd250: DD appcode: A dist: See blk 16 freq: As Required asof: See blk 16 firstsub: See blk 16 subsub: See blk 16 addressee1: AFLCMC/WNY draft1: 1 reg1: 1 repro1: 0 addressee2: 235 Byron Street draft2:
reg2:
repro2:
addressee3: Suite 19A draft3:
reg3:
repro3:
addressee4: Robins AFB, GA draft4:
reg4:
repro4:
addressee5: 31098 draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 1 total_reg: 1 total_repro: 0 remarks: Block 4: Contractor format is acceptable on electronic media (CD/DVD). Data item to be used as a guide for content.
Block 9: Distribution statement C: Distribution authorized to US Government agencies only (Administrative or operational use) (11/26/07). Other requests for this document shall be referred to AFLCMC/WNY, Robins AFB GA 31098 WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., sec. 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violation of these export laws are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25.
Block 11-13: Reports will only be generated to ensure that all significant items and problems are identified.
Note: Data will be delivered electronically in Rich Text Format, and/or other govt.
approved word processing format.
group:
total_price:
prep_name: Martin Okiawele prep_sign:
prep_date: 27 Feb 2019 app_by:
app_sign:
app_date: 11 Mar 11
Page: 1 app: Adobe Professional 7.0 line_item:
exhibit:
xtdp: Off xtm: Off othercat: X system: AN-FSQ-228 Link-16 Alaska (LAK) ctr_no: FD2060-18-34116 contr:
remarksb:
Page2: 2 of_pages: 2
Reset:
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page of Pages
C O N T R A C T D A T A R E Q U I R E M E N T S L I S T (1 Data I tem)
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
D. SYSTEM/ITEM
AN-FSQ-228 Link-16 Alaska (LAK)
E. CONTRACT/PR NO.
FD2060-18-34116
F. CONTRACTORS Technologies,
1. DATA ITEM NO.
A00B
2. TITLE OF DATA ITEM
LOGISTICS PRODUCT DATA
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81758A/T
5. CONTRACT REFERENCE
SOW PARA 4.7.7, 4.10.1
6. REQUIRING OFFICE
406 SCMS/GULAB
7. DD250 REQ
See Block 16
9. DIST
STATEMENT
As Required
IAW AFMC Form 718
N/A
As Required
a. ADDRESSEE Draft
16. REMARKS.
A. The Prime Provisioning Activity (PPA) is identified in Block 14.
B. Specific summaries to be delivered on this contract are:
(1)__x__Provisioning Parts List (PPL) Top Down Sequence (2)__x__Short Form Provisioning Parts List (SFPPL) (3)__x__Common and Bulk Items List (CBIL) (4)__x__Design Change Notices (DCN) (5)____Statement of Prior Submission (SPS) Hard Copy Only.
(6)____Long Lead Items List (LLIL) Select one of the following:
______LLIL-Interim Release (Items interim released by the contractor when interim release is authorized by the contract.
______LLIL-Recommended (Items recommended as LLIL).
C. Attachment: LMI Data Product Worksheet for Logistics Product Data.
D. Block 7: Acceptance/Rejection of the Logistics Product Data will be furnished within 90 calendar days after receipt by the PPA. Method of acceptance/rejection will be in accordance with contract requirements.
E. Block 8: Approval (written) is not required. However, the data item will be reviewed and accepted/rejected based on its conforming to the requirements of the DID within 90 days of receipt by the requiring office.
F. Block 9: Distribution statement _____ applies.
G. Blocks 10, 11, 12, & 13:
(1) PPL, SFPPL, LLIL, CBIL: Date(s) to be reflected on the AFMC Form 718 (Atch 1 to the Initial Provisioning Performance Specification (IPPS)). See Paragraph 3.1 of the IPPS.
(2) DCN(s): See Paragraph 10 of the IPPS.
(3) SPS: When the IPPS is provided with the solicitation, an offeror’s SPS shall be as outlined by the solicitation. When the IPPS is furnished after award, the contractor shall furnish a SPS within thirty (30) days after receipt of the IPPS. See Paragraph 7 of the IPPS.
H. Logistics Product Data transmittal document will reflect, as a minimum, PCCN, SCC, PCC, Contract Number, Type Logistics Product Data, and Line Item Count.
I. Data element definitions will be in accordance with GEIA-HB-0007B and/or other data provided at the PGC by the PPA.
J. In the event Logistics Product Data submittal deliveries are to be made to a secured program specific electronic site (contractor or government), a transmittal notification will be concurrently forwarded to the PPA via email.
406SCMS/GULAB 1 0
235 Byron St.
Suite 19A
Robins AFB GA
31098-1670
15. TOTAL 1 0
G. PREPARED BY
Da-Vonna S. Raston
H. DATE
18 March 2019
I. APPROVED BY J. DATE
CONTRACT DATA REQUIREMENTS LIST
Form Approved
B. EXHIBIT
C. CATEGORY
E. CONTRACT/PR NO.
FD2060-18-34116
A00B
DI-SESS-81758A/T
See Block 16
See Block 16
As Required
See Block 16
N/A
Draft
G. PREPARED BY
C O NT R AC T:
D AT A R E Q U I R E M E NT S L I S T:
Form Approved:
A CONTRACT LINE ITEM NO:
B EXHIBIT:
C CATEGORY:
F CONTRACTORS Technologies:
2 TITLE OF DATA ITEM LOGISTICS PRODUCT DATA:
3 SUBTITLE:
5 CONTRACT REFERENCE SOW PARA 477 4101:
6 REQUIRING OFFICE 406 SCMSGULAB:
14 DISTRIBUTION12 DATE OF FIRST SUBMISSION IAW AFMC Form 718:
b COPIES:
11 AS OF DATE NA:
Final:
Reg:
Repro:
Draft406SCMSGULAB:
Draft235 Byron St:
1235 Byron St:
0235 Byron St:
DraftSuite 19A:
1Suite 19A:
0Suite 19A:
DraftRobins AFB GA:
1Robins AFB GA:
0Robins AFB GA:
Draft310981670:
1310981670:
0310981670:
31098167016 REMARKS A The Prime Provisioning Activity PPA is identified in Block 14 B Specific summaries to be delivered on this contract are 1 x Provisioning Parts List PPL Top Down Sequence 2 x Short Form Provisioning Parts List SFPPL 3 x Common and Bulk Items List CBIL 4 x Design Change Notices DCN 5 Statement of Prior Submission SPS Hard Copy Only 6 Long Lead Items List LLIL Select one of the following LLILInterim Release Items interim released by the contractor when interim release is authorized by the contract LLILRecommended Items recommended as LLIL C Attachment LMI Data Product Worksheet for Logistics Product Data D Block 7 AcceptanceRejection of the Logistics Product Data will be furnished within 90 calendar days after receipt by the PPA Method of acceptancerejection will be in accordance with contract requirements E Block 8 Approval written is not required However the data item will be reviewed and acceptedrejected based on its conforming to the requirements of the DID within 90 days of receipt by the requiring office F Block 9 Distribution statement applies G Blocks 10 11 12 13 1 PPL SFPPL LLIL CBIL Dates to be reflected on the AFMC Form 718 Atch 1 to the Initial Provisioning Performance Specification IPPS See Paragraph 31 of the IPPS 2 DCNs See Paragraph 10 of the IPPS 3 SPS When the IPPS is provided with the solicitation an offerors SPS shall be as outlined by the solicitation When the IPPS is furnished after award the contractor shall furnish a SPS within thirty 30 days after receipt of the IPPS See Paragraph 7 of the IPPS H Logistics Product Data transmittal document will reflect as a minimum PCCN SCC PCC Contract Number Type Logistics Product Data and Line Item Count I Data element definitions will be in accordance with GEIAHB0007B andor other data provided at the PGC by the PPA J In the event Logistics Product Data submittal deliveries are to be made to a secured program specific electronic site contractor or government a transmittal notification will be concurrently forwarded to the PPA via email:
Draft16 REMARKS A The Prime Provisioning Activity PPA is identified in Block 14 B Specific summaries to be delivered on this contract are 1 x Provisioning Parts List PPL Top Down Sequence 2 x Short Form Provisioning Parts List SFPPL 3 x Common and Bulk Items List CBIL 4 x Design Change Notices DCN 5 Statement of Prior Submission SPS Hard Copy Only 6 Long Lead Items List LLIL Select one of the following LLILInterim Release Items interim released by the contractor when interim release is authorized by the contract LLILRecommended Items recommended as LLIL C Attachment LMI Data Product Worksheet for Logistics Product Data D Block 7 AcceptanceRejection of the Logistics Product Data will be furnished within 90 calendar days after receipt by the PPA Method of acceptancerejection will be in accordance with contract requirements E Block 8 Approval written is not required However the data item will be reviewed and acceptedrejected based on its conforming to the requirements of the DID within 90 days of receipt by the requiring office F Block 9 Distribution statement applies G Blocks 10 11 12 13 1 PPL SFPPL LLIL CBIL Dates to be reflected on the AFMC Form 718 Atch 1 to the Initial Provisioning Performance Specification IPPS See Paragraph 31 of the IPPS 2 DCNs See Paragraph 10 of the IPPS 3 SPS When the IPPS is provided with the solicitation an offerors SPS shall be as outlined by the solicitation When the IPPS is furnished after award the contractor shall furnish a SPS within thirty 30 days after receipt of the IPPS See Paragraph 7 of the IPPS H Logistics Product Data transmittal document will reflect as a minimum PCCN SCC PCC Contract Number Type Logistics Product Data and Line Item Count I Data element definitions will be in accordance with GEIAHB0007B andor other data provided at the PGC by the PPA J In the event Logistics Product Data submittal deliveries are to be made to a secured program specific electronic site contractor or government a transmittal notification will be concurrently forwarded to the PPA via email:
116 REMARKS A The Prime Provisioning Activity PPA is identified in Block 14 B Specific summaries to be delivered on this contract are 1 x Provisioning Parts List PPL Top Down Sequence 2 x Short Form Provisioning Parts List SFPPL 3 x Common and Bulk Items List CBIL 4 x Design Change Notices DCN 5 Statement of Prior Submission SPS Hard Copy Only 6 Long Lead Items List LLIL Select one of the following LLILInterim Release Items interim released by the contractor when interim release is authorized by the contract LLILRecommended Items recommended as LLIL C Attachment LMI Data Product Worksheet for Logistics Product Data D Block 7 AcceptanceRejection of the Logistics Product Data will be furnished within 90 calendar days after receipt by the PPA Method of acceptancerejection will be in accordance with contract requirements E Block 8 Approval written is not required However the data item will be reviewed and acceptedrejected based on its conforming to the requirements of the DID within 90 days of receipt by the requiring office F Block 9 Distribution statement applies G Blocks 10 11 12 13 1 PPL SFPPL LLIL CBIL Dates to be reflected on the AFMC Form 718 Atch 1 to the Initial Provisioning Performance Specification IPPS See Paragraph 31 of the IPPS 2 DCNs See Paragraph 10 of the IPPS 3 SPS When the IPPS is provided with the solicitation an offerors SPS shall be as outlined by the solicitation When the IPPS is furnished after award the contractor shall furnish a SPS within thirty 30 days after receipt of the IPPS See Paragraph 7 of the IPPS H Logistics Product Data transmittal document will reflect as a minimum PCCN SCC PCC Contract Number Type Logistics Product Data and Line Item Count I Data element definitions will be in accordance with GEIAHB0007B andor other data provided at the PGC by the PPA J In the event Logistics Product Data submittal deliveries are to be made to a secured program specific electronic site contractor or government a transmittal notification will be concurrently forwarded to the PPA via email:
016 REMARKS A The Prime Provisioning Activity PPA is identified in Block 14 B Specific summaries to be delivered on this contract are 1 x Provisioning Parts List PPL Top Down Sequence 2 x Short Form Provisioning Parts List SFPPL 3 x Common and Bulk Items List CBIL 4 x Design Change Notices DCN 5 Statement of Prior Submission SPS Hard Copy Only 6 Long Lead Items List LLIL Select one of the following LLILInterim Release Items interim released by the contractor when interim release is authorized by the contract LLILRecommended Items recommended as LLIL C Attachment LMI Data Product Worksheet for Logistics Product Data D Block 7 AcceptanceRejection of the Logistics Product Data will be furnished within 90 calendar days after receipt by the PPA Method of acceptancerejection will be in accordance with contract requirements E Block 8 Approval written is not required However the data item will be reviewed and acceptedrejected based on its conforming to the requirements of the DID within 90 days of receipt by the requiring office F Block 9 Distribution statement applies G Blocks 10 11 12 13 1 PPL SFPPL LLIL CBIL Dates to be reflected on the AFMC Form 718 Atch 1 to the Initial Provisioning Performance Specification IPPS See Paragraph 31 of the IPPS 2 DCNs See Paragraph 10 of the IPPS 3 SPS When the IPPS is provided with the solicitation an offerors SPS shall be as outlined by the solicitation When the IPPS is furnished after award the contractor shall furnish a SPS within thirty 30 days after receipt of the IPPS See Paragraph 7 of the IPPS H Logistics Product Data transmittal document will reflect as a minimum PCCN SCC PCC Contract Number Type Logistics Product Data and Line Item Count I Data element definitions will be in accordance with GEIAHB0007B andor other data provided at the PGC by the PPA J In the event Logistics Product Data submittal deliveries are to be made to a secured program specific electronic site contractor or government a transmittal notification will be concurrently forwarded to the PPA via email:
LLILInterim Release Items interim released by the:
31098167016 REMARKS A The Prime Provisioning Activity PPA is identified in Block 14 B Specific summaries to be delivered on this contract are 1 x Provisioning Parts List PPL Top Down Sequence 2 x Short Form Provisioning Parts List SFPPL 3 x Common and Bulk Items List CBIL 4 x Design Change Notices DCN 5 Statement of Prior Submission SPS Hard Copy Only 6 Long Lead Items List LLIL Select one of the following LLILInterim Release Items interim released by the contractor when interim release is authorized by the contract LLILRecommended Items recommended as LLIL C Attachment LMI Data Product Worksheet for Logistics Product Data D Block 7 AcceptanceRejection of the Logistics Product Data will be furnished within 90 calendar days after receipt by the PPA Method of acceptancerejection will be in accordance with contract requirements E Block 8 Approval written is not required However the data item will be reviewed and acceptedrejected based on its conforming to the requirements of the DID within 90 days of receipt by the requiring office F Block 9 Distribution statement applies G Blocks 10 11 12 13 1 PPL SFPPL LLIL CBIL Dates to be reflected on the AFMC Form 718 Atch 1 to the Initial Provisioning Performance Specification IPPS See Paragraph 31 of the IPPS 2 DCNs See Paragraph 10 of the IPPS 3 SPS When the IPPS is provided with the solicitation an offerors SPS shall be as outlined by the solicitation When the IPPS is furnished after award the contractor shall furnish a SPS within thirty 30 days after receipt of the IPPS See Paragraph 7 of the IPPS H Logistics Product Data transmittal document will reflect as a minimum PCCN SCC PCC Contract Number Type Logistics Product Data and Line Item Count I Data element definitions will be in accordance with GEIAHB0007B andor other data provided at the PGC by the PPA J In the event Logistics Product Data submittal deliveries are to be made to a secured program specific electronic site contractor or government a transmittal notification will be concurrently forwarded to the PPA via email_2:
Draft16 REMARKS A The Prime Provisioning Activity PPA is identified in Block 14 B Specific summaries to be delivered on this contract are 1 x Provisioning Parts List PPL Top Down Sequence 2 x Short Form Provisioning Parts List SFPPL 3 x Common and Bulk Items List CBIL 4 x Design Change Notices DCN 5 Statement of Prior Submission SPS Hard Copy Only 6 Long Lead Items List LLIL Select one of the following LLILInterim Release Items interim released by the contractor when interim release is authorized by the contract LLILRecommended Items recommended as LLIL C Attachment LMI Data Product Worksheet for Logistics Product Data D Block 7 AcceptanceRejection of the Logistics Product Data will be furnished within 90 calendar days after receipt by the PPA Method of acceptancerejection will be in accordance with contract requirements E Block 8 Approval written is not required However the data item will be reviewed and acceptedrejected based on its conforming to the requirements of the DID within 90 days of receipt by the requiring office F Block 9 Distribution statement applies G Blocks 10 11 12 13 1 PPL SFPPL LLIL CBIL Dates to be reflected on the AFMC Form 718 Atch 1 to the Initial Provisioning Performance Specification IPPS See Paragraph 31 of the IPPS 2 DCNs See Paragraph 10 of the IPPS 3 SPS When the IPPS is provided with the solicitation an offerors SPS shall be as outlined by the solicitation When the IPPS is furnished after award the contractor shall furnish a SPS within thirty 30 days after receipt of the IPPS See Paragraph 7 of the IPPS H Logistics Product Data transmittal document will reflect as a minimum PCCN SCC PCC Contract Number Type Logistics Product Data and Line Item Count I Data element definitions will be in accordance with GEIAHB0007B andor other data provided at the PGC by the PPA J In the event Logistics Product Data submittal deliveries are to be made to a secured program specific electronic site contractor or government a transmittal notification will be concurrently forwarded to the PPA via email_2:
116 REMARKS A The Prime Provisioning Activity PPA is identified in Block 14 B Specific summaries to be delivered on this contract are 1 x Provisioning Parts List PPL Top Down Sequence 2 x Short Form Provisioning Parts List SFPPL 3 x Common and Bulk Items List CBIL 4 x Design Change Notices DCN 5 Statement of Prior Submission SPS Hard Copy Only 6 Long Lead Items List LLIL Select one of the following LLILInterim Release Items interim released by the contractor when interim release is authorized by the contract LLILRecommended Items recommended as LLIL C Attachment LMI Data Product Worksheet for Logistics Product Data D Block 7 AcceptanceRejection of the Logistics Product Data will be furnished within 90 calendar days after receipt by the PPA Method of acceptancerejection will be in accordance with contract requirements E Block 8 Approval written is not required However the data item will be reviewed and acceptedrejected based on its conforming to the requirements of the DID within 90 days of receipt by the requiring office F Block 9 Distribution statement applies G Blocks 10 11 12 13 1 PPL SFPPL LLIL CBIL Dates to be reflected on the AFMC Form 718 Atch 1 to the Initial Provisioning Performance Specification IPPS See Paragraph 31 of the IPPS 2 DCNs See Paragraph 10 of the IPPS 3 SPS When the IPPS is provided with the solicitation an offerors SPS shall be as outlined by the solicitation When the IPPS is furnished after award the contractor shall furnish a SPS within thirty 30 days after receipt of the IPPS See Paragraph 7 of the IPPS H Logistics Product Data transmittal document will reflect as a minimum PCCN SCC PCC Contract Number Type Logistics Product Data and Line Item Count I Data element definitions will be in accordance with GEIAHB0007B andor other data provided at the PGC by the PPA J In the event Logistics Product Data submittal deliveries are to be made to a secured program specific electronic site contractor or government a transmittal notification will be concurrently forwarded to the PPA via email_2:
016 REMARKS A The Prime Provisioning Activity PPA is identified in Block 14 B Specific summaries to be delivered on this contract are 1 x Provisioning Parts List PPL Top Down Sequence 2 x Short Form Provisioning Parts List SFPPL 3 x Common and Bulk Items List CBIL 4 x Design Change Notices DCN 5 Statement of Prior Submission SPS Hard Copy Only 6 Long Lead Items List LLIL Select one of the following LLILInterim Release Items interim released by the contractor when interim release is authorized by the contract LLILRecommended Items recommended as LLIL C Attachment LMI Data Product Worksheet for Logistics Product Data D Block 7 AcceptanceRejection of the Logistics Product Data will be furnished within 90 calendar days after receipt by the PPA Method of acceptancerejection will be in accordance with contract requirements E Block 8 Approval written is not required However the data item will be reviewed and acceptedrejected based on its conforming to the requirements of the DID within 90 days of receipt by the requiring office F Block 9 Distribution statement applies G Blocks 10 11 12 13 1 PPL SFPPL LLIL CBIL Dates to be reflected on the AFMC Form 718 Atch 1 to the Initial Provisioning Performance Specification IPPS See Paragraph 31 of the IPPS 2 DCNs See Paragraph 10 of the IPPS 3 SPS When the IPPS is provided with the solicitation an offerors SPS shall be as outlined by the solicitation When the IPPS is furnished after award the contractor shall furnish a SPS within thirty 30 days after receipt of the IPPS See Paragraph 7 of the IPPS H Logistics Product Data transmittal document will reflect as a minimum PCCN SCC PCC Contract Number Type Logistics Product Data and Line Item Count I Data element definitions will be in accordance with GEIAHB0007B andor other data provided at the PGC by the PPA J In the event Logistics Product Data submittal deliveries are to be made to a secured program specific electronic site contractor or government a transmittal notification will be concurrently forwarded to the PPA via email_2:
31098167016 REMARKS A The Prime Provisioning Activity PPA is identified in Block 14 B Specific summaries to be delivered on this contract are 1 x Provisioning Parts List PPL Top Down Sequence 2 x Short Form Provisioning Parts List SFPPL 3 x Common and Bulk Items List CBIL 4 x Design Change Notices DCN 5 Statement of Prior Submission SPS Hard Copy Only 6 Long Lead Items List LLIL Select one of the following LLILInterim Release Items interim released by the contractor when interim release is authorized by the contract LLILRecommended Items recommended as LLIL C Attachment LMI Data Product Worksheet for Logistics Product Data D Block 7 AcceptanceRejection of the Logistics Product Data will be furnished within 90 calendar days after receipt by the PPA Method of acceptancerejection will be in accordance with contract requirements E Block 8 Approval written is not required However the data item will be reviewed and acceptedrejected based on its conforming to the requirements of the DID within 90 days of receipt by the requiring office F Block 9 Distribution statement applies G Blocks 10 11 12 13 1 PPL SFPPL LLIL CBIL Dates to be reflected on the AFMC Form 718 Atch 1 to the Initial Provisioning Performance Specification IPPS See Paragraph 31 of the IPPS 2 DCNs See Paragraph 10 of the IPPS 3 SPS When the IPPS is provided with the solicitation an offerors SPS shall be as outlined by the solicitation When the IPPS is furnished after award the contractor shall furnish a SPS within thirty 30 days after receipt of the IPPS See Paragraph 7 of the IPPS H Logistics Product Data transmittal document will reflect as a minimum PCCN SCC PCC Contract Number Type Logistics Product Data and Line Item Count I Data element definitions will be in accordance with GEIAHB0007B andor other data provided at the PGC by the PPA J In the event Logistics Product Data submittal deliveries are to be made to a secured program specific electronic site contractor or government a transmittal notification will be concurrently forwarded to the PPA via email_3:
Draft16 REMARKS A The Prime Provisioning Activity PPA is identified in Block 14 B Specific summaries to be delivered on this contract are 1 x Provisioning Parts List PPL Top Down Sequence 2 x Short Form Provisioning Parts List SFPPL 3 x Common and Bulk Items List CBIL 4 x Design Change Notices DCN 5 Statement of Prior Submission SPS Hard Copy Only 6 Long Lead Items List LLIL Select one of the following LLILInterim Release Items interim released by the contractor when interim release is authorized by the contract LLILRecommended Items recommended as LLIL C Attachment LMI Data Product Worksheet for Logistics Product Data D Block 7 AcceptanceRejection of the Logistics Product Data will be furnished within 90 calendar days after receipt by the PPA Method of acceptancerejection will be in accordance with contract requirements E Block 8 Approval written is not required However the data item will be reviewed and acceptedrejected based on its conforming to the requirements of the DID within 90 days of receipt by the requiring office F Block 9 Distribution statement applies G Blocks 10 11 12 13 1 PPL SFPPL LLIL CBIL Dates to be reflected on the AFMC Form 718 Atch 1 to the Initial Provisioning Performance Specification IPPS See Paragraph 31 of the IPPS 2 DCNs See Paragraph 10 of the IPPS 3 SPS When the IPPS is provided with the solicitation an offerors SPS shall be as outlined by the solicitation When the IPPS is furnished after award the contractor shall furnish a SPS within thirty 30 days after receipt of the IPPS See Paragraph 7 of the IPPS H Logistics Product Data transmittal document will reflect as a minimum PCCN SCC PCC Contract Number Type Logistics Product Data and Line Item Count I Data element definitions will be in accordance with GEIAHB0007B…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .