L7WC02 Paint Both HVAC_QA_111626.pdf

PDF 83 KB Posted

Attached to
L7WC02_ B670 Paint Booth and HVAC
Solicitation number
FA857127Q0002
Issued by

About this file

This file is a Questions and Answers (Q&A) document for federal contract solicitation L7WC02 Paint Both HVAC at Robins Air Force Base. The solicitation concerns supply and installation of a 100-ton HVAC system with associated control systems and equipment at a paint booth facility. The quotation deadline is November 12, 2026, with submissions required via email. Site visits are not mandatory during the solicitation phase but may be required upon contract award. The Purchase Description dated October 20, 2026 is posted on SAM.gov and the Government will provide an unprotected PDF version to external contractors who cannot access the Microsoft Information Rights Management-protected version.

The contract is classified as a supply buy rather than construction, meaning Davis-Bacon wage rate requirements and bonding do not apply. Progress payments and milestone payments are not available; payment structure follows seven CLINs including preliminary and final design, removal of existing HVAC, supply and installation of the 100-ton unit, HMI control system, override shutdown door systems, acceptance testing, and CDRLs. The work plan deliverable (CDRL A001) is due five days after the post-award site visit. Equipment must be evaluated for lead-time at contract approval. Prime contractors need not hold specific technical licenses but must explicitly identify qualified subcontractors and ensure their on-site presence during work performance. The Government will not provide Government Furnished Property such as lifts, and no as-built drawings or building schematics are available beyond 1998 manuals for the old unit. The revised Purchase Description includes breathable air system specifications and the final system must maintain specified temperature, humidity, airflow, and BTU requirements using 100% outside air.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

L7WC02 Paint Both HVAC

1. Prime Contractor Eligibility & Licensing: Can an offeror submit a proposal as the prime contractor utilizing a qualified HVAC manufacturer/service partner (e.g., Carrier) and licensed specialty subcontractors to perform the technical requirements, subject to standard subcontracting and responsibility rules?

Response: The prime contractor is not required to personally hold the specific technical licenses or be a certified installer. However, the prime contractor must explicitly identify the entity/individuals performing the work, and those qualified individuals must be present on-site while the work is being performed.

2. Solicitation Administrative Requirements: Please confirm the governing quotation deadline, submission instructions, and whether a mandatory site visit, specific base access protocols, prior experience, bonding, or insurance requirements apply.

Response: Deadline: November 12, 2026.

• Submission: Via email.

• Site Visit: Not mandatory during the solicitation phase, though site visits may be required upon contract award.

• Base Access: Robins AFB access will be coordinated based on contract award details (the location is not classified/secure).

• Prior Experience: Offerors may submit comparable project experience, but must fully address all experience criteria explicitly requested in the solicitation.

• Bonding/Insurance: Standard bonding and insurance requirements apply.

3. Access to Protected Purchase Description (PD): Attachment 01, L7WC02 Purchase Description (PD) 20 Oct 26, posted on SAM.gov, is protected by Microsoft Information Rights Management (IRM) and cannot be opened by external contractors. Will the Government provide an unprotected PDF copy via email or repost it on SAM.gov?

Response: Resolved: The Government will distribute or repost an unprotected PDF version of the Purchase Description (PD) dated October 20, 2026.

4. CDRL A001 Work Plan Schedule: CDRL A001 requires a work plan "within five days of site visit." Please clarify if this refers to five days after the pre-proposal site visit or five days after contract award.

Response: The work plan deliverable is due five days after the post-award site visit associated with the award of the contract.

5. Do you know where I can find a list of general contractors or plan holders for this project? We're looking to bid out, but I'd like to know which GCs we could bid under. If you don't have this information, could you direct me to somebody who might have it?

Response: No, we cannot provide this information you will need to do your own due diligence to find out who will offer a quote and solicit to them directly for sub-contracting.

6. Can the Human-Machine Interface (HMI) be a touch screen?

Response: Vendor discretion in using a touch screen; however, vendor needs to be mindful of paint around that area.

7. Will there be any Government Furnished Property (GFP) such as lifts?

Response: No

8. Can the “as built drawings” be available?

Response: Located manuals (Attached) on old unit from around 1 Oct 1998. No schematic of buildings are available.

9. What are the specifications for the breathable air portion?

Response: The original PD is now updated with breathable air information and will be posted to SAM.gov please review.

10. Will there be a laydown/work area?

Response: Yes, it will be the parking area outside of the paint booth and old HVAC system area.

11. Who certified the load calculation for the building?

Response: At end of project, we will be using outside air 100% and not building air.

12. Is the load calculated for the temperature required by contract?

Response: No, but it must be able to maintain that temperature and humidity and airflow and BTUs as stated in the PD.

13. Will the contract completion be centered around equipment availability?

Response: Yes, we will need the approximate lead-time of all equipment at the point of contract approval.

14. Can you confirm whether this project is subject to the Davis-Bacon Act (Construction Wage Rate Requirements) or the Service Contract Labor Standards?

If applicable, could you provide the governing wage determination and clarify whether certified payroll submissions will be required?

Response: No, this is a supply buy, no wage rate will be allowed on this effort.

Please submit your quote according to the Solicitation

15. Given the substantial equipment procurement associated with the 100-ton HVAC system, will progress payments or milestone payments be permitted for equipment procurement, delivery, and installation, or will payment be issued only upon final completion and acceptance?

Response: No progress payments or milestone payments available using CIP funds. The CLIN structure for the Form 9 is as follows:

0001 Preliminary and Final Design 0002 Removal of existing HVAC system 0003 Supply & Install 100-Ton unit 0004 Supply & Install HMI Control System 0005 Supply & Install override shutdown door systems 0006 Complete Acceptance Test

0007 CDRL (A001-A009) NSP

16. Can you confirm whether the revised Purchase Description fully addresses the breathable-air system requirements, electrical infrastructure, equipment pad modifications, and any other work necessary to provide a complete operational system? Additionally, are any updated drawings or equipment specifications available beyond the previously referenced 1998 manuals?

Response: PD is complete and there are no other drawings or manuals available.

17. The published Q&A references standard bonding and insurance requirements.

Could you confirm whether bid, performance, and payment bonds are required and, if so, the applicable percentages or amounts?

Response: Because CIP is a supply requirement and not construction, bonding is not required.

18. Is there an established construction magnitude range or estimated project value that can be disclosed to assist offerors in evaluating the scope and bonding requirements?

Response: Because bonding is not required, estimate or value is not needed.