CDRLs.pdf
PDF 91 KB Posted
- Attached to
- EMXG Production Support Federal contract opportunity
- Solicitation number
- FA8571-19-R-EMXG
About this file
Attachment 02 - Contract Data Requirements List (CDRLs)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation_Amendment_FA857120R00010002.pdf | ||
| Q&A_3.pdf | ||
| Production_Support_YR_Rates_Price_Worksheet_REV2.xls | XLS spreadsheet | |
| EMXG_RFP_Questions_&_Answers_2.pdf | ||
| FA857120R00010001.pdf | ||
| Continuation_-_52.222-42_Statement_of_Equivalent_Rates_for_Federal_Hires.pdf | ||
| EMXG_RFP_Questions_&_Answers_FINAL.docx | DOCX document | |
| PWS_EMXG_Production_Support_21_Oct_2019_UPDATED.DOC | DOC document | |
| Production_Support_YR_Rates_Price_Worksheet_REV1.xls | XLS spreadsheet | |
| FA857120R0001.pdf | ||
| Production_Support_YR_Rates_Price_Worksheet.xls | XLS spreadsheet | |
| PWS_EMXG_Production_Support_27_Sep_2019.pdf | ||
| Wage_Determination.pdf | ||
| DD254.pdf | ||
| Qualifications_and_Requirements.pdf | ||
| Appendix_C__for_EMXG_Production_Support.docx | DOCX document |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-2, AUG 96 PREVIOUS EDITION MAY BE USED. Page of Pages
Adobe Professional 8.0
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
Reset
CONTRACT DATA REQUIREMENTS LIST
(2 Data Items)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER X
D. SYSTEM/ITEM
EMXG Production Support Bridge
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Status Report
3. SUBTITLE
Status Report
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-80368A
5. CONTRACT REFERENCE
PWS Para 4.11
6. REQUIRING OFFICE
402 EMXG/MXDSAB
7. DD 250 REQ
DD
9. DIST STATEMENT
REQUIRED
B
10. FREQUENCY
MONTHLY
12. DATE OF FIRST SUBMISSION
ASREQ
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
See Blk 16
13. DATE OF SUBSEQUENT
SUBMISSION
MONTHLY
Draft
Final
Reg Repro
16. REMARKS
BLKS 11, 12 & 13: Monthly status report shall be delivered no later than the 15th of following month.
The Contractor shall provide weekly labor reports for certification of services to the TPOC not later than TUESDAY of the following week. Values of hours worked shall be in whole number and then .25 increments for further break down only. The weekly labor hour report will be summarized in the Monthly Status Report.
BLK 14: Addressee
402 EMSS/MXDSAB
TPOC: Loretta Carter 402 Richard Ray Blvd., Suite 100 Robins AFB GA 31098
402 EMXG/MXDSAB 1
15. TOTAL 0 1 0
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Funds & Man Hours Expenditure Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-FNCL-80331A
5. CONTRACT REFERENCE
PWS Para 4.11.1
6. REQUIRING OFFICE
402 EMXG/MXDSAB
7. DD 250 REQ
DD
B
MONTHLY
12. DATE OF FIRST SUBMISSION
8. APP CODE
N/A
11. AS OF DATE
See Blk 16
13. DATE OF SUBSEQUENT
SUBMISSAIOSN REQ
Draft
Final
Reg Repro
16. REMARKS
BLK 11. Report every four weeks to include quantity and category of labor hours expended during the report period for each individual charging to the task order. Values of hours worked shall be in whole number and then .25 increments for further break down only.
First submission of the FMHER report for Direct Personnel hours and Support Personnel hours shall be submitted by the 5th day following the end of the first reporting month (four weeks) after contract award.
BLK 14
Attn: Loretta Carter 402 Richard Ray Blvd., Suite 100 Robins AFB GA 31098
402 EMXG/MXDSAB 1
15. TOTAL 0 1 0
G. PREPARED BY
Phyllis M. Vail VAIL.PHYLLIS.M.1280273097 Digitally signed by VAIL.PHYLLIS.M.1280273097
Date: 2018.11.09 13:18:44 -05'00'
H. DATE
20181109
I. APPROVED BY
Phyllis M. Vail
Digitally signed by
VAIL.PHYLLIS.M.1280273097 VAIL.PHYLLIS.M.1280273097
Date: 2018.11.09 13:19:04 -05'00'
J. DATE
20181109
DD FORM 1423-2, AUG 96 PREVIOUS EDITION MAY BE USED. Page of Pages
Adobe Professional 8.0
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
Reset
CONTRACT DATA REQUIREMENTS LIST
(2 Data Items)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER X
D. SYSTEM/ITEM
EMXG Production Support Bridge
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
Contractor's Safety Plan
3. SUBTITLE
Safety Plan
4. AUTHORITY (Data Acquisition Document No.)
DI-SAFT-82080
5. CONTRACT REFERENCE
PWS Para. 4.14
6. REQUIRING OFFICE
WR-ALC/SE (Safety Office)
7. DD 250 REQ
No
A
1TIME
12. DATE OF FIRST SUBMISSION
See Blk 16
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Blk 16
Draft
Final
Reg Repro
16. REMARKS
BLK 12: Submit draft of company safety plan for review/approval within 10 working days after contract award. Safety plan can be in Contractor format. Also submit the Appendix C that was supplied by the Government and annotate in the Appendix C anything the Contractor does not believe is applicable to the type of work to be performed.
BLK 13: Submit final copies 10 working days after Government (WR-ALC/SE) acceptance of draft. Revisions as required.
BLK 14a: WR-ALC/SE AFSC/PZIOA
420 Richard Ray Blvd. 375 Perry St.
Robins AFB, GA 31098 Bldg. 255
Robins AFB, GA 31098
See Blk 16 2 2
15. TOTAL 2 2 0
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
Accident/Incident Report
3. SUBTITLE
Accident/Incident Report
4. AUTHORITY (Data Acquisition Document No.)
DI-SAFT-81563 NOT 1
5. CONTRACT REFERENCE
PWS Para. 4.14.1
6. REQUIRING OFFICE
WR-ALC/SE (Safety Office)
7. DD 250 REQ
No
A
ASREQ
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
ASREQ
13. DATE OF SUBSEQUENT
SUBMISSAIOSN REQ
Draft
Final
Reg Repro
16. REMARKS
Block 11: Telephone notification of any accident/incident should be made immediately and not more than 4 hours after occurrence. Submit written report within 3 calendar days of mishap.
Block 13: Submit information that is not available at the time of the accident/incident within 20 calendar days after occurrence.
Block 14a: WR-ALC/SE AFSC/PZIOA
420 Richard Ray Blvd. 375 Perry St.
Robins AFB, GA 31098 Bldg. 255
Robins AFB, GA 31098
See Blk 16 2 2
15. TOTAL 2 2 0
G. PREPARED BY
Phyllis M. Vail VAIL.PHYLLIS.M.1280273097 Digitally signed by VAIL.PHYLLIS.M.1280273097
Date: 2018.11.09 13:20:17 -05'00'
H. DATE
20181109
I. APPROVED BY
Phyllis M. Vail
Digitally signed by
VAIL.PHYLLIS.M.1280273097 VAIL.PHYLLIS.M.1280273097
Date: 2018.11.09 13:20:31 -05'00'
J. DATE
20181109
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref.
DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13;
Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
DD FORM 1423-2 (BACK), AUG 96
| A001 and A002 CDRL |
| DD FORM 1423-2, AUG 96 |
| A003 and A004 CDRL EMXG Prod Support Bridge |
| DD FORM 1423-2, AUG 96 |
| INSTRUCTIONS FOR COMPLETING DD FORM 1423 |
| FOR GOVERNMENT PERSONNEL |
| FOR THE CONTRACTOR |
DD FORM 1423-2 (BACK), AUG 96
File details come from the government source that posted it.