RFP Question and Answer_04.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- Energy Efficient Small Shelter System (EESSS) Federal contract opportunity
- Solicitation number
- FA8534-22-R-0002
About this file
This document contains questions and answers regarding Request for Proposals FA8534-22-R-0002 from the Department of the Air Force Materiel Command for an Energy Efficient Small Shelter System. The RFP seeks proposals for the design and production of a shelter that can accommodate ballistic splinter protection kits to protect against small arms fire and fragmentation, though no kit will be required for initial offering or first article testing. Manufacturers should consider additional weight and attachment methods for any future integration of protection materials. The specification takes precedence over any conflicts with the questions and answers provided.
View the file
Other files for this federal contract opportunity
Show all 34
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| EESSS RFP FA8534-22-R-0002 | |
| The government’s specification shall take precedence/priority over any questions/answers response in the event there is a conflict between the former and latter. | |
| Questions | Comments |
| 3.6.17 |
Hazardous environment protection. The shelter shall accommodate specific ballistic splinter protection kits to protect occupants/contents against small arms and small fragmenting munitions as defined in National Institute of Justice (NIJ) Guide 0101.06, Type IIA. This protection kit shall provide complete surround and overhead protection and be emplaced within one hour by two persons
Is the splinter kit to be included in our offering? If not, will the splinter kit be part of the pre-production testing?
This requirement is included to notify the manufacture to design provisions into the shelter to allow "future" kits to be used if required. The material to provide this protection is commercially available in sheets as well as preformed panels to fit certain applications (such as car door panels). There are certain considerations that need to be addressed in the design, i.e. additional weight, attachment methods.
There is no immediate requirement for a protection kit at this time. It is not required for a protection kit to be supplied with the initial offering.
No protection kit will be required for any of the first article testing.
The government’s specification shall take precedence/priority over any questions/answers response in the event there is a conflict between the former and latter.