RFP Question and Answer_03.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
Energy Efficient Small Shelter System (EESSS) Federal contract opportunity
Solicitation number
FA8534-22-R-0002
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

This document contains questions and answers regarding Request for Proposal FA8534-22-R-0002 from the Department of the Air Force for Energy Efficient Small Shelter Systems. The solicitation requires offerors to propose shelter systems with sidewalls at least 7 feet high measured on the interior, with no more than 16 inches of slope from base to top. Pricing must be fixed for all nine option years in Attachment F, though offerors may adjust pricing to account for unforeseeable economic conditions such as material and labor cost increases. Cell F99 of Amendment 0003's price proposal appears to be missing a formula that should calculate the product of cells C99 and E99.

View the file

Other files for this federal contract opportunity

Other files attached to Energy Efficient Small Shelter System (EESSS), newest first.
File Type Posted
RFP Question and Answer_05.xlsx XLSX spreadsheet
RFP Question and Answer_04.xlsx XLSX spreadsheet
Final RFP Amend 0006.pdf PDF
Attachment_4_Section_L_Instructions_contidions_and_Notices_to_Offerors_Amend_0006.pdf PDF
Attachment_C_Client_Authorization_Letter_Amend_0006.pdf PDF
Attachment_D_Transmittal_Letter_Amend_0006.pdf PDF
Attachment_F_Price_Proposal_Amend_0005.xlsx XLSX spreadsheet
Final RFP Amend 0005.pdf PDF
Final RFP Amend 0004.pdf PDF
RFP Question and Answer_02.xlsx XLSX spreadsheet
Attachment_C_Client_Authorization_Letter_Amend_0003.pdf PDF
Attachment_F_Price_Proposal_Amend_0003.xlsx XLSX spreadsheet
Final RFP Amend 0003.pdf PDF
Attachment_4_Section_L_Instructions_contidions_and_Notices_to_Offerors_Amend_0003.pdf PDF
Attachment_D_Transmittal_Letter_Amend_0003.pdf PDF
RFP Question and Answer.xlsx XLSX spreadsheet
CDRL_DD1423_Portfolio_Amend_0002.pdf PDF
Final RFP Amend 0002.pdf PDF
Attachment_F_Price_Proposal_Amend 0002.xlsx XLSX spreadsheet
Final RFP Amend 0001.pdf PDF
CDRL_DD1423_Portfolio.pdf PDF
Attachment_E_Consent_Form.pdf PDF
Purchase_Description.pdf PDF
DD_1653_Transportation_Instructions.pdf PDF
AFMC_Form158_Packaging_Requirements.pdf PDF
Statement_of_Work.pdf PDF
Attachment_4_Section_L_Instructions_contidions_and_Notices_to_Offerors.pdf PDF
Attachment_5_Section_M_Evaluation_Factors_for_Award.pdf PDF
Attachment_D_Transmittal_Letter.pdf PDF
Attachment_F_Price_Proposal_.xlsx XLSX spreadsheet
EESSS RFP.pdf PDF
Attachment_B_Relevancy_Assessment.pdf PDF
Attachment_A_Past_Performance_Questionaaire.pdf PDF
Attachment_C_Client_Authorization_Letter.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

EESSS RFP FA8534-22-R-0002
The government’s specification shall take precedence/priority over any questions/answers response in the event there is a conflict between the former and latter.
QuestionsComments
3.3.4 Shelter system sidewalls. The shelter shall have sidewalls that are a minimum 7.0 feet high. The sidewalls shall not slope more than a maximum of 16.0 inches from the base to the top of the sidewall.
Is the shelter system sidewall height measured on the interior liner or shelter exterior?The requirement is established to ensure adequate headroom is allowed for interior space. All space between side walls and end wall must clear 7 ft. headroom. The measurement will be performed on the interior of the shelter in the configuration required to meet all other specifications.
Is the shelter system sidewall slope measured on the interior liner, shelter exterior, or both?The intent of this requirement to have the walls as vertical as possible, allowing more interior headroom. The measurement will be performed on the interior of the shelter in the configuration required to meet all other specifications.
The price evaluation requires offerors to submit pricing for all nine, one-year option periods. Accurately projecting the costs of material and labor for that length of time is very difficult. Inflation is currently running at 8.5%, and we have seen aluminum prices increased by about 30% over the last 12 months. Are bidders obligated to sell the shelters at option year prices in Attachment F should the government exercise those options? Or are offerors permitted to adjust option-year pricing based on unforeseeable economic conditions, such as a dramatic increase in the cost of material and labor?Yes, Option prices are to be fixed and exercised at the fixed costs.
Attachment F Price Proposal Amend 0003 appears to have a missing formula in cell F99. For the purposes of the TEP, can the agency confirm that the value in cell F99 will be the product of C99*E99?See Revised spreadsheet at the amendment 0005
The government’s specification shall take precedence/priority over any questions/answers response in the event there is a conflict between the former and latter.

File details come from the government source that posted it. Updated .