This document contains questions and answers regarding Request for Proposal FA8534-22-R-0002 from the Department of the Air Force for Energy Efficient Small Shelter Systems. The solicitation requires offerors to propose shelter systems with sidewalls at least 7 feet high measured on the interior, with no more than 16 inches of slope from base to top. Pricing must be fixed for all nine option years in Attachment F, though offerors may adjust pricing to account for unforeseeable economic conditions such as material and labor cost increases. Cell F99 of Amendment 0003's price proposal appears to be missing a formula that should calculate the product of cells C99 and E99.
View the file
Other files for this federal contract opportunity
Show all 34
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| EESSS RFP FA8534-22-R-0002 | |
| The government’s specification shall take precedence/priority over any questions/answers response in the event there is a conflict between the former and latter. | |
| Questions | Comments |
| 3.3.4 Shelter system sidewalls. The shelter shall have sidewalls that are a minimum 7.0 feet high. The sidewalls shall not slope more than a maximum of 16.0 inches from the base to the top of the sidewall. | |
| Is the shelter system sidewall height measured on the interior liner or shelter exterior? | The requirement is established to ensure adequate headroom is allowed for interior space. All space between side walls and end wall must clear 7 ft. headroom. The measurement will be performed on the interior of the shelter in the configuration required to meet all other specifications. |
| Is the shelter system sidewall slope measured on the interior liner, shelter exterior, or both? | The intent of this requirement to have the walls as vertical as possible, allowing more interior headroom. The measurement will be performed on the interior of the shelter in the configuration required to meet all other specifications. |
| The price evaluation requires offerors to submit pricing for all nine, one-year option periods. Accurately projecting the costs of material and labor for that length of time is very difficult. Inflation is currently running at 8.5%, and we have seen aluminum prices increased by about 30% over the last 12 months. Are bidders obligated to sell the shelters at option year prices in Attachment F should the government exercise those options? Or are offerors permitted to adjust option-year pricing based on unforeseeable economic conditions, such as a dramatic increase in the cost of material and labor? | Yes, Option prices are to be fixed and exercised at the fixed costs. |
| Attachment F Price Proposal Amend 0003 appears to have a missing formula in cell F99. For the purposes of the TEP, can the agency confirm that the value in cell F99 will be the product of C99*E99? | See Revised spreadsheet at the amendment 0005 |
| The government’s specification shall take precedence/priority over any questions/answers response in the event there is a conflict between the former and latter. |