FA8505-16-R-0007-0004_Repair_Support__Amend_4.pdf
PDF 287 KB Posted
- Attached to
- F-15 Repair Support Federal contract opportunity
- Solicitation number
- FA8505-16-R-0007
View the file
Other files for this federal contract opportunity
Show all 50
F-15 Repair Support has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
JLSU
2. AMENDMENT/MODIFICATION NO.
FA8505-16-R-0007-0004
3. EFFECTIVE DATE
11 MAY 2016
4. REQUISITION/PURCHASE REQ. NO.
F3QCBS5309B101
5. PROJECT NO (If applicable)
6. ISSUED BY CODE
EAGLE (F-15), AFLCMC/WWQK
235 BYRON ST STE 19A
BLDG 300 CML PHN 478 926 3358
ROBINS AFB GA 31098-1670
BUYER: Tad E. Williams/WWQK tad.williams.1@us.af.mil Phone: (478) 926- 6440 Fax: (000) 000-0000 No Collect Calls
7. ADMINISTERED BY (If other than item 6) CODEFA8505
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE
X
9A. AMENDMENT OF SOLICITATION NO.
FA850516R0007
9B. DATED (SEE ITEM 11)
3-FEB-2016
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. 25-MAY-2016 3:00 PM
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
FMS REQUIREMENT
ROUTINE
15A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR
BY ________________________________________________________
(Signature of person authorized to sign)
15C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16B. UNITED STATES OF AMERICA
BY ____________________________________________________
(Signature of Contracting Officer)
16C. DATE SIGNED
FACILITY CODE
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (REV. 10-83)
PRESCRIBED BY GSA
FAR (48 CFR) 53.243
X
X X
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
Amendment/Modification FA8505-16-R-0007-0004
Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION
The purpose of this amendment is as follows:
A. The following attachments have been updated:
Form # Description Date #ofPgs
From: Attach 1A SGFP Data Input Spreadsheet (XLSX) (GFP Form) Attch 1A – REPAIRS 186
To: Attach 1A SGFP Data Input Spreadsheet (XLSX) (GFP Form) 22Apr2016 174
From: RRS_Repair_History_12Jan2015 – Repairs 08MAR2016 130
To: RRS_Repair_History_22Apr2016 – Repairs 22Apr2016 141
From: Attach 2 AGE-SPV and Hush House Equipment History Attach 2 19 OCT2015 30
To: Attach 2 AGE-SPV and Hush House Equipment History 22Apr2016 26
From: Section L Section L-F-15 Repair Support Amend 3 07MAR2016 12
To: Section L Section L-F-15 Repair Support Amend 4 22Apr2016 12
From: Section M Section M-F-15 Repair Support Amend 3 07MAR2016 11
To: Section M Section M-F-15 Repair Support Amend 4 22Apr2016 12
B. The following clauses are hereby deleted:
1) DFARS 252.209-7008, Notice of Prohibition Relating to Org Conflict of Interest-- Major Defense Acquisition Program
2) DFARS 252.209-7009,
Organizational Conflict of Interest--Major Defense Acquisition Program (October 2015)
3) FAR 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Jan 2014)
C. Paragraph (c) of clause 52.217-9, Option to Extend the Term of the Contract (Mar
2000) is hereby amended as follows:
From: (c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed “90 months + 6 month extension of services.”
To: (c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed "84 months + 6 month extension of services."
D. Paragraph (d) of Clause 52.216-16, Incentive Price Revision-Firm Target (Oct 1997) is hereby corrected as follows:
From: (d) Price revision.
(2)(ii) If the total final negotiated cost is greater than the total target cost, the adjustment is the total target profit, less 8.00 percent of the amount by which the total final negotiated cost exceeds the total target cost.
(iii) If the final negotiated cost is less than the total target cost, the adjustment is the total target profit plus 8.00 percent of the amount by which the total final negotiated cost is less than the total target cost. “8%”
To: (d) Price revision.
(2)(ii) If the total final negotiated cost is greater than the total target cost, the a djustment is the total target profit, less 50.00 percent of the amount by which the total final negotiated cost exceeds the total target cost.
(iii) If the final negotiated cost is less than the total target cost, the adjustment is the total target profit plus 50.00 percent of the amount by which the total final negotiated cost is less than the total target cost.
E. A Cost Reimbursable No Fee CLIN for Repairs without usage history has been added as follows:
CLIN PoP Basic 0006 24 mo Option Year 1 1006 12 mo Option Year 2 2006 12 mo Option Year 3 3006 12 mo Option Year 4 4006 12 mo Option Year 5 5006 12 mo 6 Mo.
Extension
6008 6 mo
(Please Note: This CLIN will be for the cost of repairs associated with items listed on the updated RRS Repair History spreadsheet where there is no historical repair information, but lists an identified Source of Repair.)
F. Section L is hereby updated as follows:
1) Correct a typo in Section A(2) as follows:
From: Print shall be no smaller than a font size of 12, except font associated with drawings, diagrams, charts, etc. which may no small than font size 8.
To: Print shall be no smaller than a font size of 12, except font associated with drawings, diagrams, charts, etc. which may be no smaller than font size 8.
2) Add statements to Section E(2)(a) as follows:
From: No more than three (3) efforts should be submitted from each Prime Contractor, joint venture member, and/or critical subcontractor.
To: No more than three (3) efforts should be submitted from each Prime Contractor, joint venture member, and/or critical subcontractor. All Critical subcontractors must submit no more than three (3) recent contracts for the past performance evaluation. This is in addition to the max of three (3) recent contracts that must be submitted by the offeror/joint venture member(s).
3) Add statement to the end of Section G (iii) as follows:
From: If limited or no subcontracting possibilities exist for these Small Businesses and these socio-economic entities, provide rationale for such.
Offerors are cautioned against only acknowledging a goal is not met, if applicable. Rather, adequate rationale includes specific reasons why a goal is unmet and any actions being taken to increase any unmet goals. Additionally, if the offeror/joint venture member, teaming member or critical subcontractor is a small business concern, it should include the work it will be performing when calculating the goals for its Small Business Concern Utilization information.
To: If limited or no subcontracting possibilities exist for these Small Businesses and these socio-economic entities, provide rationale for such. Offerors are cautioned against only acknowledging a goal is not met, if applicable. Rather, adequate rationale includes specific reasons why a goal is unmet and any actions being taken to increase any unmet goals. Additionally, if the offeror/joint venture member, teaming member or critical subcontractor is a small business concern, it should include the work it will be performing when calculating the goals for its Small Business Concern Utilization information. If adequate rationale is provided for not being able to meet the Small Business Utilization Goals, the offeror will also be considered acceptable for this factor.
G. Section M is hereby updated as follows :
1) Add statement to the end of Section D(3) as follows:
From: Adequate rationale is provided if limited or no subcontracting possibilities exist for these Small Businesses and these socio-economic entities. Offerors are cautioned against only acknowledging a goal is not met, if applicable. Adequate rationale includes specific reasons why a goal is unmet and any actions being taken to increase any unmet goals.
To: Adequate rationale is provided if limited or no subcontracting possibilities exist for these Small Businesses and these socio-economic entities. Offerors are cautioned against only acknowledging a goal is not met, if applicable. Adequate rationale includes specific reasons why a goal is unmet and any actions being taken to increase any unmet goals. If adequate rationale is provided for not being able to meet the Small Business Utilization Goals, the offeror will also be considered acceptable for this factor.
2) Correct “The DoD FY 2015 goals” as follows:
FROM:
Subcontracting Small SDB WOSB SDVOSB HUB Business Zone
DEPT OF
DEFENSE
(9700)
36.00% 5% 5% 3% 3%
TO:
Subcontracting Small SDB WOSB SDVOSB HUB Business Zone
DEPT OF
DEFENSE
(9700)
34.5% 5% 5% 3% 3%
H. The due date for the proposal has changed from 29Apr2016 3:30 pm to 25May2016 3:00 pm eastern standard time.
I. Questions are due by 16May2016 at 5:00 pm eastern standard time. No additional questions will be received or responded to after this date and time.
J. All other clauses, provisions and conditions remain unchanged.
Request for Proposal FA8505-16-R-0007-0004
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
1. REAs will not be considered for rate adjustments for G&A, etc. over the life of the contract.
2. The information contained in the SGFP (GFP Form) spreadsheet is the most up to date information the Program Office currently has. A final inventory is required of the incumbent at the close of the current contract and an initial inventory is required of the winning Contractor. The information pertaining to any GFP will continue to be updated during this process.
OPERATION, MANAGEMENT, AND REPAIRS
Item No.
Incentive Firm Target
R706 Operations, Maintenance and Repairs
OPERATION, MANAGEMENT AND REPAIRS
Applicability: F-15 ; Foreign Military Sales
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring ISO 9001-2008 15SEP2015 or Later AS9100 9100 15JAN2009 C or Later
Foreign Military Sales Contractors shall price Sub-CLINs 0001 AA & 0001AB. Both will be priced and evaluated in accordance with Sections L & M, however; only one will be awarded.
Operation, Maintenance, and Repairs
WITHOUT Preventative Maintenance Item No.
0001AA
Incentive Firm Target Quantity U/I Target Cost Target Profit Target Price
Operation, Maintenance, and Repairs
WITHOUT Preventative Maintenance
24 MO
R706 WITHOUT Preventative Maintenance Applicability: F-15 ; Foreign Military Sales
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring ISO 9001-2008 15SEP2015 or Later AS9100 9100 15JAN2009 C or Later
Foreign Military Sales Place of Perf Quantity (U/I) To be determined _ Req No / Pri
Required Period of Performance
24 MO TBD
Proposed Period of Performance
24 MO
Operation, Maintenance, and Repairs
WITH Preventative Maintenance (Option) Item No.
0001AB
Incentive Firm Target Quantity U/I Target Cost Target Profit Target Price
24 MO
R706 WITH Preventative Maintenance (OPTION) Applicability: F-15 ; Foreign Military Sales
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring ISO 9001-2008 15SEP2015 or Later AS9100 9100 15JAN2009 C or Later
Foreign Military Sales Place of Perf Quantity (U/I) To be determined _ Req No / Pri
Operation, Maintenance, and Repairs
WITH Preventative Maintenance (Option) Required Period of Performance
24 MO TBD
Proposed Period of Performance
24 MO
CLIN 0002: Offerors are NOT required to propose an amount for this CLIN.
FACILITIES
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
24 MO $113,064.9600 $2,713,559.04
R706 Facilities
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Foreign Military Sales Class I ODS Substance Application/Use Quantity
NONE
Place of Perf Quantity (U/I) To be determined _ Req No / Pri
Required Period of Performance
24 MO TBD
Proposed Period of Performance
24 MO
CLIN 0003: Offerors are NOT required to propose an amount for this CLIN.
TRAVEL
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Estimated Total Price
24 MO $19,839.1300 $476,139.12
R706 Travel
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Foreign Military Sales Place of Perf Quantity (U/I) To be determined _ Req No / Pri
Required Period of Performance
24 MO TBD
Proposed Period of Performance
24 MO
CLIN 0004: Offerors are NOT required to propose an amount for this CLIN; only the Fixed Fee.
OTHER DIRECT COSTS
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost
24 MO $370,300.2900
R706 Other Direct Costs
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring ISO 9001-2008 15SEP2015 or Later AS9100 9100 15JAN2009 C or Later
OTHER DIRECT COSTS
Required Period of Performance
24 MO TBD
Proposed Period of Performance
24 MO
Purchases over $3500.00 must be competed between a minimum of three contractors. If competition can not be accomplished, supporting sole source documentation must be submitted to the PCO/ACO for approval prior to the purchase. Contractor shall maintain all supporting documentation along with PCO/ACO approval letters. Backup documentation shall be attached to the SF1034 and shall be provided in English language. The contractor shall be paid actual, documented cost with no additional fee.
DATA
Item No.
Not Separately Priced Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
A001 Technical Report-Study/S ervices - PWS Para. 3.7.1 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A002 Technical
Report-Study/S ervices - PWS Para. 4.15.1.3 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A003 Status Report -
See Block 16 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A004 Management
Plan - PWS Paras. 4.9 Exhibit: A
DID:
Not Separately Priced Not Separately Priced
DATA
A005 Conference Agenda - PWS Para. 4.10.2 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A006 Briefing
Material - PWS Para. 4.10.2 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A007 Conference
Minutes - PWS Para. 4.10.2 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A008 Contract Funds
Status Report
(CFSR) - PWS
Para. 4.12 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A009 Technical
Report-Study/S ervices - PWS Para. 4.17.1 Exhibit: A
DID:
DI-MISC-80508
B
Not Separately Priced Not Separately Priced A00D Quality
Program Plan
(QPP) - PWS
Para. 4.18.3 Exhibit: A
DID:
Not Separately Priced Not Separately Priced
A00L GIDEP)
Alert/Safe-Aler t Response - PWS Para.
4.4.2 Exhibit: A
DID:
DI-QCIC-80126
B
DATA
A00a Data Accessions List
(DAL) - PWS
Para. 4.13 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A00b Technical
Report – Study/Services
- PWS Para.
4.14 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A00c Trip/Travel
Report - PWS Para. 4.5 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A00e (DMSMS)
Implementatio n Plan - PWS Para. 4.19 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A00f Systems Safety
Program Plan
(SSPP) - PWS
Para. 5.5.4.1 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A00g Accident/Incid ent - PWS Para. 5.5.3, 5.5.4.3 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A00h Phase-Out
Transition Plan
- PWS Para.
4.28 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A00j Status of (GFE)
Report -PWS Para. 3.4 Exhibit: A
DATA
A00k (GIDEP) Alert/Safe-Aler t Report - PWS Para. 4.4.2 Exhibit: A
DID:
Not Separately Priced Not Separately Priced
DATA
DATA
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Data - CDRL - PM/PCO Acceptance/Approval Quality Assurance: Data - CDRL - PM/PCO Acceptance/Approval Foreign Military Sales Type / Ship To Quantity (U/I) To be determined _ Req No / Pri
Required Delivery
24 LO TBD
Proposed Delivery
24 LO
CLIN 0006: Offerors are NOT required to propose an amount for this CLIN.
Repairs Without Usage
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
24 MO $41,666.6667 $1,000,000.00
R706 Zero Usage Parts " This CLIN will be for the cost of repairs associated with items listed on the updated RRS Repair History spreadsheet where there is no historical repair information, but lists an identified Source of Repair.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring ISO 9001-2008 15SEP2015 or later AS9100 9100 15JAN2009 C or later
Repairs Without Usage
Required Period of Performance
24 MO TBD
Proposed Period of Performance
24 MO
OPTION YEAR ONE (1)
This Option is for a Period of Performance of twelve (12) months, and may be exercised within one calendar day prior to the Option Period of Performance effective date. The Government reserves the right to exercise the following CLINs, in whole or in part, as needed throughout the Period of Performance of the option.
OPERATION, MANAGEMENT, AND REPAIRS
Option Year 1
Item No.
Incentive Firm Target
R706 Operations, Maintenance and Repairs
OPERATION, MANAGEMENT AND REPAIRS
Applicability: F-15 ; Foreign Military Sales
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring ISO 9001-2008 15SEP2015 or later AS9100 9100 15JAN2009 C or Later
Foreign Military Sales
Contractors shall price Sub-CLINs 1001 AA & 1001AB. Both will be priced and evaluated in accordance with Sections L & M, however; only one will be awarded.
Operation, Maintenance, and Repairs
WITHOUT Preventative Maintenance Item No.
1001AA
Incentive Firm Target Quantity U/I Target Cost Target Profit Target Price
12 MO
R706 WITHOUT Preventative Maintenance Applicability: F-15 ; Foreign Military Sales
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring ISO 9001-2008 15SEP2015 or Later AS9100 9100 15JAN2009 C or Later
Foreign Military Sales Place of Perf Quantity (U/I) To be determined _ Req No / Pri
Required Period of Performance
12 MO TBD
Proposed Period of Performance
12 MO
Operation, Maintenance, and Repairs
WITH Preventative Maintenance (Option) Item No.
1001AB
Incentive Firm Target Quantity U/I Target Cost Target Profit Target Price
12 MO
R706 WITH Preventative Maintenance (OPTION) Applicability: F-15 ; Foreign Military Sales
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
Operation, Maintenance, and Repairs
WITH Preventative Maintenance (Option) ISO 9001-2008 15SEP2015 or Later AS9100 9100 15JAN2009 C or Later
Foreign Military Sales Place of Perf Quantity (U/I) To be determined _ Req No / Pri
Required Period of Performance
12 MO TBD
Proposed Period of Performance
12 MO
CLIN 1002: Offerors are NOT required to propose an amount for this CLIN.
FACILITIES
Option Year 1
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
12 MO $123,730.5000 $1,484,766.00
R706 Facilities
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Foreign Military Sales Class I ODS Substance Application/Use Quantity
NONE
Place of Perf Quantity (U/I) To be determined _ Req No / Pri
Required Period of Performance
12 MO TBD
Proposed Period of Performance
12 MO
CLIN 1003: Offerors are NOT required to propose an amount for this CLIN.
TRAVEL
Option Year 1
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
12 MO $21,339.1700 $256,070.04
R706 Travel
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Foreign Military Sales Place of Perf Quantity (U/I) To be determined _ Req No / Pri
Required Period of Performance
12 MO TBD
Proposed Period of Performance
12 MO
CLIN 1004: Offerors are NOT required to propose an amount for this CLIN; only Fixed Fee.
OTHER DIRECT COSTS
Option Year 1
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost
12 MO $397,124.5000
R706 Other Direct Costs
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring ISO 9001-2008 15SEP2015 or Later AS9100 9100 15JAN2009 C or Later
OTHER DIRECT COSTS
Option Year 1
Required Period of Performance
12 MO TBD
Proposed Period of Performance
12 MO
Purchases over $3500.00 must be competed between a minimum of three contractors. If competition can not be accomplished, supporting sole source documentation must be submitted to the PCO/ACO for approval prior to the purchase. Contractor shall maintain all supporting documentation along with
Not Separately Priced Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
A001 Technical Report-Study/S ervices - PWS Para. 3.7.1 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A002 Technical
Report-Study/S ervices - PWS Para. 4.15.1.3 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A003 Status Report -
See Block 16 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A004 Management
Plan - PWS Paras. 4.9 Exhibit: A
DATA
A005 Conference Agenda - PWS Para. 4.10.2 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A006 Briefing
Material - PWS Para. 4.10.2 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A007 Conference
Minutes - PWS Para. 4.10.2 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A008 Contract Funds
Status Report
(CFSR) - PWS
Para. 4.12 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A009 Technical
Report-Study/S ervices - PWS Para. 4.17.1 Exhibit: A
DID:
DI-MISC-80508
B
Not Separately Priced Not Separately Priced A00D Quality
Program Plan
(QPP) - PWS
Para. 4.18.3 Exhibit: A
DID:
Not Separately Priced Not Separately Priced
A00L GIDEP)
Alert/Safe-Aler t Response - PWS Para.
4.4.2 Exhibit: A
DID:
DI-QCIC-80126
DATA
A00a Data Accessions List
(DAL) - PWS
Para. 4.13 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A00b Technical
Report – Study/Services
- PWS Para.
4.14 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A00c Trip/Travel
Report - PWS Para. 4.5 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A00e (DMSMS)
Implementatio n Plan - PWS Para. 4.19 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A00f Systems Safety
Program Plan
(SSPP) - PWS
Para. 5.5.4.1 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A00g Accident/Incid ent - PWS Para. 5.5.3, 5.5.4.3 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A00h Phase-Out
Transition Plan
- PWS Para.
4.28 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A00j Status of (GFE)
Report -PWS Para. 3.4 Exhibit: A
DATA
A00k (GIDEP) Alert/Safe-Aler t Report - PWS Para. 4.4.2 Exhibit: A
DID:
Not Separately Priced Not Separately Priced
DATA
DATA
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Data - CDRL - PM/PCO Acceptance/Approval Quality Assurance: Data - CDRL - PM/PCO Acceptance/Approval Foreign Military Sales Type / Ship To Quantity (U/I) To be determined _ Req No / Pri
Required Delivery
1 LO TBD
Proposed Delivery
1 LO
CLIN 1006: Offerors are NOT required to propose an amount for this CLIN.
Repairs Without Usage Option Year 1
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
12 MO $41,666.6666 $500,000.00
R706 Zero Usage Parts " This CLIN will be for the cost of repairs associated with items listed on the updated RRS Repair History spreadsheet where there is no historical repair information, but lists an identified Source of Repair.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring ISO 9001-2008 15SEP2015 or later AS9100 9100 15JAN2009 C or later
Repairs Without Usage Option Year 1
Required Period of Performance
12 MO TBD
Proposed Period of Performance
12 MO
***OPTION YEAR TWO***
This Option is for a Period of Performance of twelve (12) months, and may be exercised within one calendar day prior to the Option Period of Performance effective date. The Government reserves the right to exercise the following CLINs, in whole or in part, as needed throughout the Period of Performance of the option.
OPERATION, MANAGEMENT, AND REPAIRS
Option Year 2
Item No.
Incentive Firm Target
R706 Operations, Maintenance and Repairs
OPERATION, MANAGEMENT AND REPAIRS
Applicability: F-15 ; Foreign Military Sales
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring ISO 9001-2008 15SEP2015 or later AS9100 9100 15JAN2009 C or Later
Foreign Military Sales
Contractors shall price Sub-CLINs 2001 AA & 2001AB. Both will be priced and evaluated in accordance
Operation, Maintenance, and Repairs
WITHOUT Preventative Maintenance Item No.
2001AA
Incentive Firm Target Quantity U/I Target Cost Target Profit Target Price
12 MO
R706 WITHOUT Preventative Maintenance Applicability: F-15 ; Foreign Military Sales
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring ISO 9001-2008 15SEP2015 or Later AS9100 9100 15JAN2009 C or Later
Foreign Military Sales Place of Perf Quantity (U/I) To be determined _ Req No / Pri
Required Period of Performance
12 MO TBD
Proposed Period of Performance
12 MO
Operation, Maintenance, and Repairs
WITH Preventative Maintenance (Option) Item No.
2001AB
Incentive Firm Target Quantity U/I Target Cost Target Profit Target Price
12 MO
R706 WITH Preventative Maintenance (OPTION) Applicability: F-15 ; Foreign Military Sales
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required
Operation, Maintenance, and Repairs
WITH Preventative Maintenance (Option) Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring ISO 9001-2008 15SEP2015 or Later AS9100 9100 15JAN2009 C or Later
Foreign Military Sales Place of Perf Quantity (U/I) To be determined _ Req No / Pri
Required Period of Performance
12 MO TBD
Proposed Period of Performance
12 MO
CLIN 2002: Offerors are NOT required to propose an amount for this CLIN.
FACILITIES
Option Year 2
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
12 MO $129,917.0000 $1,559,004.00
R706 Facilities
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Foreign Military Sales Class I ODS Substance Application/Use Quantity
NONE
Place of Perf Quantity (U/I) To be determined _ Req No / Pri
Required Period of Performance
12 MO TBD
Proposed Period of Performance
CLIN 2003: Offerors are NOT required to propose an amount for this CLIN.
TRAVEL
Option Year 2
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
12 MO $22,406.1700 $268,874.04
R706 Travel
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Foreign Military Sales Place of Perf Quantity (U/I) To be determined _ Req No / Pri
Required Period of Performance
12 MO TBD
Proposed Period of Performance
12 MO
CLIN 2004: Offerors are NOT required to propose an amount for this CLIN; only fixed fee.
OTHER DIRECT COSTS
Option Year 2
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost
12 MO $416,980.6700
R706 Other Direct Costs
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring ISO 9001-2008 15SEP2015 or Latter AS9100 9100 15JAN2009 C or Later
OTHER DIRECT COSTS
Option Year 2
Required Period of Performance
12 MO TBD
Proposed Period of Performance
12 MO
Purchases over $3500.00 must be competed between a minimum of three contractors. If competition can not be accomplished, supporting sole source documentation must be submitted to the PCO/ACO for approval prior to the purchase. Contractor shall maintain all supporting documentation along with
Not Separately Priced Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
A001 Technical Report-Study/S ervices - PWS Para. 3.7.1 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A002 Technical
Report-Study/S ervices - PWS Para. 4.15.1.3 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A003 Status Report -
See Block 16 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A004 Management
Plan - PWS Paras. 4.9 Exhibit: A
DATA
A005 Conference Agenda - PWS Para. 4.10.2 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A006 Briefing
Material - PWS Para. 4.10.2 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A007 Conference
Minutes - PWS Para. 4.10.2 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A008 Contract Funds
Status Report
(CFSR) - PWS
Para. 4.12 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A009 Technical
Report-Study/S ervices - PWS Para. 4.17.1 Exhibit: A
DID:
DI-MISC-80508
B
Not Separately Priced Not Separately Priced A00D Quality
Program Plan
(QPP) - PWS
Para. 4.18.3 Exhibit: A
DID:
Not Separately Priced Not Separately Priced
A00L GIDEP)
Alert/Safe-Aler t Response - PWS Para.
4.4.2 Exhibit: A
DID:
DI-QCIC-80126
DATA
A00a Data Accessions List
(DAL) - PWS
Para. 4.13 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A00b Technical
Report – Study/Services
- PWS Para.
4.14 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A00c Trip/Travel
Report - PWS Para. 4.5 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A00e (DMSMS)
Implementatio n Plan - PWS Para. 4.19 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A00f Systems Safety
Program Plan
(SSPP) - PWS
Para. 5.5.4.1 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A00g Accident/Incid ent - PWS Para. 5.5.3, 5.5.4.3 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A00h Phase-Out
Transition Plan
- PWS Para.
4.28 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A00j Status of (GFE)
Report -PWS Para. 3.4 Exhibit: A
DATA
A00k (GIDEP) Alert/Safe-Aler t Report - PWS Para. 4.4.2 Exhibit: A
DID:
Not Separately Priced Not Separately Priced
DATA
DATA
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Data - CDRL - PM/PCO Acceptance/Approval Quality Assurance: Data - CDRL - PM/PCO Acceptance/Approval Foreign Military Sales Type / Ship To Quantity (U/I) To be determined _ Req No / Pri
Required Delivery
1 LO TBD
Proposed Delivery
1 LO
CLIN 2006: Offerors are NOT required to propose an amount for this CLIN.
Repairs Without Usage Option Year 2
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
12 MO $41,666.6666 $500,000.00
R706 Zero Usage Parts " This CLIN will be for the cost of repairs associated with items listed on the updated RRS Repair History spreadsheet where there is no historical repair information, but lists an identified Source of Repair.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring ISO 9001-2008 15SEP2015 or later AS9100 9100 15JAN2009 C or later
Repairs Without Usage Option Year 2
Required Period of Performance
12 MO TBD
Proposed Period of Performance
12 MO
***OPTION YEAR THREE***
This Option is for a Period of Performance of twelve (12) months, and may be exercised within one calendar day prior to the Option Period of Performance effective date. The Government reserves the right to exercise the following CLINs, in whole or in part, as needed throughout the Period of Performance of the option.
OPERATION, MANAGEMENT, AND REPAIRS
Option Year 3
Item No.
Incentive Firm Target
R706 Operations, Maintenance and Repairs
OPERATION, MANAGEMENT AND REPAIRS
Applicability: F-15 ; Foreign Military Sales
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring ISO 9001-2008 15SEP2015 or Later AS9100 9100 15JAN2009 C or Later
Foreign Military Sales
Contractors shall price Sub-CLINs 3001 AA & 3001AB. Both will be priced and evaluated in accordance
Operation, Maintenance, and Repairs Option Year 3
WITHOUT Preventative Maintenance Item No.
3001AA
Incentive Firm Target Quantity U/I Target Cost Target Profit Target Price
12 MO
R706 WITHOUT Preventative Maintenance Applicability: F-15 ; Foreign Military Sales
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring ISO 9001-2008 15SEP2015 or Later AS9100 9100 15JAN2009 C or Later
Foreign Military Sales Place of Perf Quantity (U/I) To be determined _ Req No / Pri
Required Period of Performance
12 MO TBD
Proposed Period of Performance
12 MO
Operation, Maintenance, and Repairs Option Year 3
WITH Preventative Maintenance (Option) Item No.
3001AB
Incentive Firm Target Quantity U/I Target Cost Target Profit Target Price
12 MO
R706 WITH Preventative Maintenance (OPTION) Applicability: F-15 ; Foreign Military Sales
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Operation, Maintenance, and Repairs Option Year 3
WITH Preventative Maintenance (Option) ISO 9001-2008 15SEP2015 or Later AS9100 9100 15JAN2009 C or Later
Foreign Military Sales Place of Perf Quantity (U/I) To be determined _ Req No / Pri
Required Period of Performance
12 MO TBD
Proposed Period of Performance
12 MO
CLIN 3002: Offerors are NOT required to propose an amount for this CLIN.
FACILITIES
Option Year 3
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
12 MO $136,412.8300 $1,636,953.96
R706 Facilities
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Foreign Military Sales Class I ODS Substance Application/Use Quantity
NONE
Place of Perf Quantity (U/I) To be determined _ Req No / Pri
Required Period of Performance
12 MO TBD
Proposed Period of Performance
CLIN 3003: Offerors are NOT required to propose an amount for this CLIN.
TRAVEL
Option Year 3
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
12 MO $23,526.5000 $282,318.00
R706 Travel
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Foreign Military Sales Place of Perf Quantity (U/I) To be determined _ Req No / Pri
Required Period of Performance
12 MO TBD
Proposed Period of Performance
12 MO
CLIN 3004: Offerors are NOT required to propose an amount for this CLIN,; only Fixed Fee
OTHER DIRECT COSTS
Option Year 3
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost
12 MO $437,829.7500
R706 Other Direct Costs
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring ISO 9001-2008 15SEP2015 or Later AS9100 9100 15JAN2009 C or Later
OTHER DIRECT COSTS
Option Year 3
Required Period of Performance
12 MO TBD
Proposed Period of Performance
12 MO
Purchases over $3500.00 must be competed between a minimum of three contractors. If competition can not be accomplished, supporting sole source documentation must be submitted to the PCO/ACO for approval prior to the purchase. Contractor shall maintain all supporting documentation along with
Not Separately Priced Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
A001 Technical Report-Study/S ervices - PWS Para. 3.7.1 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A002 Technical
Report-Study/S ervices - PWS Para. 4.15.1.3 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A003 Status Report -
See Block 16 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A004 Management
Plan - PWS Paras. 4.9 Exhibit: A
DATA
A005 Conference Agenda - PWS Para. 4.10.2 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A006 Briefing
Material - PWS Para. 4.10.2 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A007 Conference
Minutes - PWS Para. 4.10.2 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A008 Contract Funds
Status Report
(CFSR) - PWS
Para. 4.12 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A009 Technical
Report-Study/S ervices - PWS Para. 4.17.1 Exhibit: A
DID:
DI-MISC-80508
B
Not Separately Priced Not Separately Priced A00D Quality
Program Plan
(QPP) - PWS
Para. 4.18.3 Exhibit: A
DID:
Not Separately Priced Not Separately Priced
A00L GIDEP)
Alert/Safe-Aler t Response - PWS Para.
4.4.2 Exhibit: A
DID:
DI-QCIC-80126
DATA
A00a Data Accessions List
(DAL) - PWS
Para. 4.13 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A00b Technical
Report – Study/Services
- PWS Para.
4.14 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A00c Trip/Travel
Report - PWS Para. 4.5 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A00e (DMSMS)
Implementatio n Plan - PWS Para. 4.19 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A00f Systems Safety
Program Plan
(SSPP) - PWS
Para. 5.5.4.1 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A00g Accident/Incid ent - PWS Para. 5.5.3, 5.5.4.3 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A00h Phase-Out
Transition Plan
- PWS Para.
4.28 Exhibit: A
DID:
Not Separately Priced Not Separately Priced A00j Status of (GFE)
Report -PWS Para. 3.4 Exhibit: A
DATA
A00k (GIDEP) Alert/Safe-Aler t Report - PWS Para. 4.4.2 Exhibit: A
DID:
Not Separately Priced Not Separately Priced
DATA
DATA
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Data - CDRL - PM/PCO Acceptance/Approval Quality Assurance: Data - CDRL - PM/PCO Acceptance/Approval Foreign Military Sales Type / Ship To Quantity (U/I) To be determined _ Req No / Pri
Required Delivery
1 LO TBD
Proposed Delivery
1 LO
CLIN 3006: Offerors are NOT required to propose an amount for this CLIN.
Repairs Without Usage Option Year 3
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
12 MO $41,666.6666 $500,000.00
R706 Zero Usage Parts " This CLIN will be for the cost of repairs associated with items listed on the updated RRS Repair History spreadsheet where there is no historical repair information, but lists an identified Source of Repair.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring ISO 9001-2008 15SEP2015 or later AS9100 9100 15JAN2009 C or later
Repairs Without Usage Option Year 3
Required Period of Performance
12 MO TBD
Proposed Period of Performance
12 MO
***OPTION YEAR FOUR***
This Option is for a Period of Performance of twelve (12) months, and may be exercised within one calendar day prior to the Option Period of Performance effective date. The Government reserves the right to exercise the following CLINs, in whole or in part, as needed throughout the Period of Performance of the option.
OPERATION, MANAGEMENT, AND REPAIRS
Option Year 4
Item No.
Incentive Firm Target
R706 Operations, Maintenance and Repairs
OPERATION, MANAGEMENT AND REPAIRS
Applicability: F-15 ; Foreign Military Sales
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring ISO 9001-2008 15SEP2015 or Later AS9100 9100 15JAN2009 C or Later
Foreign Military Sales
Contractors shall price Sub-CLINs 4001 AA & 4001AB. Both will be priced and evaluated in accordance
Operation, Maintenance, and Repairs
WITHOUT Preventative Maintenance Item No.
4001AA
Incentive Firm Target Quantity U/I Target Cost Target Profit Target Price
12 MO
R706 WITHOUT Preventative Maintenance Applicability: F-15 ; Foreign Military Sales
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring ISO 9001-2008 15SEP2015 or Later AS9100 9100 15JAN2009 C or Later
Foreign Military Sales Place of Perf Quantity (U/I) To be determined _ Req No / Pri
Required Period of Performance
12 MO TBD
Proposed Period of Performance
12 MO
Operation, Maintenance, and Repairs
WITH Preventative Maintenance (Option) Item No.
4001AB
Incentive Firm Target Quantity U/I Target Cost Target Profit Target Price
12 MO
R706 WITH Preventative Maintenance (OPTION) Applicability: F-15 ; Foreign Military Sales
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Operation, Maintenance, and Repairs
WITH Preventative Maintenance (Option) ISO 9001-2008 15SEP2015 or Later AS9100 9100 15JAN2009 C or Later
Foreign Military Sales Place of Perf Quantity (U/I) To be determined _ Req No / Pri
Required Period of Performance
12 MO TBD
Proposed Period of Performance
12 MO
CLIN 4002: Offerors are NOT required to propose an amount for this CLIN.
FACILITIES
Option Year 4
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
12 MO $143,233.5000 $1,718,802.00
R706 Facilities
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Foreign Military Sales Class I ODS Substance Application/Use Quantity
NONE
Place of Perf Quantity (U/I) To be determined _ Req No / Pri
Required Period of Performance
12 MO TBD
Proposed Period of Performance
CLIN 4003: Offerors are NOT required to propose an amount for this CLIN.
TRAVEL
Option Year 4
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
12 MO $24,702.8300 $296,433.96
R706 Travel
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Foreign Military Sales Place of Perf Quantity (U/I) To be determined _ Req No / Pri
Required Period of Performance
12 MO TBD
Proposed Period of Performance
12 MO
CLIN 4004: Offerors are NOT required to propose an amount for this CLIN only fixed fee.
OTHER DIRECT COSTS
Option Year 4
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost
12 MO $459,721.2500
R706 Other Direct Costs
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring ISO 9001-2008 15SEP2015 or Later AS9100 9100 15JAN2009 C or Later
OTHER DIRECT COSTS
Option Year 4
Required Period of Performance
12 MO TBD
Proposed Period of Performance
12 MO
Purchases over $3500.00 must be completed between a minimum of three contractors. If competition can not be accomplished, supporting sole source documentation must be submitted to the PCO/ACO for approval prior to the purchase. Contractor shall maintain all supporting documentation along with
Not Separately Priced Quantity U/I Unit Price Amount…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .