Section_J_-_Attachment_02_-_DIDs.pdf
PDF 2 MB Posted
- Solicitation number
- FA8240-15-R-7218
About this file
Section J - Attachment 02
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Source: https://assist.dla.mil -- Downloaded: 2015-03-27T19:47Z Check the source to verify that this is the current version before use.
DATA ITEM DESCRIPTION
Title: CONFIGURATION STATUS ACCOUNTING INFORMATION
Number: DI-CMAN-81253A Approval Date: 20000930 AMSC Number: D7396 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility: D/DUSD(AT&L)SE Applicable Forms: N/A
Use, Relationships: The Configuration Status Accounting (CSA) information provides details about the current configuration of items being developed for and/or used in the DoD inventory;
about documentation and identification numbers relating to those items; and about changes to the items and their configuration documentation. This information is needed to manage and support those items during their life cycle.
This Data Item Description (DID) contains the format, content and preparation instructions for the data product resulting from the work task specified in the contract. This Data Item Description (DID) contains the delivery requirements for CSA information; the format for delivery, either in hard copy or electronic form, must be specified in the contract.
Data Item Description submittal in Extensible Markup Language (XML) is acceptable.
An XML Document Type Definition (DTD), associated XML document template, and other information is available from http://www.geia.org/836/
This DID supersedes DI-CMAN-81253.
Requirements:
1. Reference documents. The applicable issue of the document cited herein, including its approval date and the date of any applicable amendments, notices, and revisions, shall be as specified in the contract.
2. Format and content. CSA information shall be provided in contractor’s format. The content shall include, where applicable, information about the following:
a. specifications generated for this project
b. drawings generated for this project
c. software listings generated for this project
d. supporting documents (such as test procedures, reports, analyses) generated as a part of this project
e. special identifiers utilized to “tag” parts, assemblies, software, used in the product
f. listings of parts installed in each serial-numbered product as delivered and as changed through maintenance and modification activities
g. engineering changes and their implementation activities
h. deviations and activities related to obtaining the consideration
i. configuration audit action items and their closeout
j. for each project document, organizations performing the roles of Current Document Change Authority, Application Activity, and Document Custodian
Source: https://assist.dla.mil -- Downloaded: 2015-03-27T19:48Z
DI-CMAN-81253A
The following references may be useful in defining content: MIL-HDBK-61, Configuration Management Guidance (in the CSA sections of Tables 2-1, 2-2, 2-3, and 2-4 and in paragraph 5 and Table 5-1) and ANSI/EIA-649-1998, National Consensus Standard for Configuration Management (paragraph 5.4) may be used to select/describe the detailed information elements.
END OF DI-CMAN-81253A.
Source: https://assist.dla.mil -- Downloaded: 2015-03-27T19:48Z
Title: Computer Program End Item Documentation
Number: DI-IPSC-80590B Approval Date: 14 Nov 2006 AMSC Number: 7638 Limitation: N/A DTIC Applicable: N/A GIDEP Applicable: None Office of Primary Responsibility: NS/DA023 Applicable Forms: N/A
Use/relationship: Computer program end item documentation defines the requirements for documentation to accompany the delivery of software end items.
This Data Item Description (DID) contains the format and content preparation instructions for each tech data product generated by the specific and discrete task requirement as delineated in the contract.
This DID is applicable for contracts which specify delivery of software developed for the Government.
This DID supersede DI-IPSC-80590A.
Requirements:
1. Reference documents: None
2. Format: The documentation shall be in contractor format.
3. Content:
3.1 Computer listings. A program listing for each computer program in the assembler compiler language as specified in the contract. These listings shall include:
3.1.1 Source programs. A listing containing comments in sufficient detail to allow for easy modification of the program and furnish insight into the relationship of a section of the operation of the total system.
3.1.2 Object programs. Listing of all object programs in the same format as the source programs. Listings shall be annotated to allow for easy reference or comparison to the source coding for that particular program.
3.1.3 Executable programs. All executable programs and databases shall be developed on the media as specified by the DD Form 1423.
4. END OF DI-IPSC-80590B
Source: https://assist.dla.mil -- Downloaded: 2015-03-27T19:44Z
Source: https://assist.dla.mil -- Downloaded: 2015-03-27T19:46Z
Source: https://assist.dla.mil -- Downloaded: 2015-03-27T19:46Z
Title: Status Report
Number: DI-MGMT-80368A Approval Date: 30 OCT 2006 AMSC Number: 7619 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility: NS/DA02 Applicable Forms: N/A
Use/relationship:
The Status Report documents the status of contractor effort towards achieving contract objectives. It identifies accomplishments to date and difficulties encountered, and compare the status achieved to planned goals and the resources expended. It is used by the Government to monitor and evaluate contractor performance.
This Data Item Description (DID) contains format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.
It is not intended that all requirements herein should be applied to every program.
Portions of the DID are subject to tailoring by deletion depending on the specific status reporting requirements of the project.
This DID is related to DI-FNCL-80331, Funds and Man-Hour Expenditure Report which can be used in conjunction with this report if paragraph 3.2.3 below is deleted.
This DID supersede DI-MGMT-80368.
1. Reference documents. None.
2. Format. The Status Report shall be in contractor format.
2.1 Identification. The data indicated below shall be contained on a title page or on the first page of the report.
a. Title/identification of the system/component/program/project.
Source: https://assist.dla.mil -- Downloaded: 2014-11-17T20:40Z
DI-MGMT-80368A
b. Type of report (e.g., monthly, interim, final).
c. Period covered by the report.
d. Contract number.
e. Preparing activity or contractor’s title.
f. Security classification, when required.
g. Distribution Statement.
2.2 Page size. The report shall be on 8 ½ by 11 inch (metric A4) paper.
3. Content. The report shall contain the following:
3.1 Summary. The summary shall include a brief statement of the overall project status , covering the accomplished technical activities and development, objectives of efforts, summary results of efforts, identification of major problems/deficiencies with impact, and recommended solutions.
3.2 Body of report. The Status Report shall contain the following items, where applicable:
3.2.1 Milestone/task status. The status of each milestone/task as defined by the statement of work or contract, as applicable:
a. A statement as to whether or not the program/project/task is on schedule; if not, the effort planned to meet the schedule shall be indicated. Include an overall status of each milestone, task, or unit of work. Include update schedule sheets, milestone charts, or task synopsis sheets identifying phase of task and percentage of completion of each task, technical instruction, or order.
b. A comparison of achieved end-product performance capabilities projected against contract baseline values, requirements, or allocations.
c. Effort expended on each task to date, and a brief description of technical developments and accomplishments.
d. Key dates in any testing program and description of tests performed and significant test results. If applicable, a description of the amount and type of down time on the equipment or system under test.
e. A list of all designs completed and a brief description of each item. For designs in process, provide estimated dates for design and drawing completion.
f. A narrative of outstanding problems existing as of the previous status report, and their resolution status. 2
DI-MGMT-80368A
g. New problem areas encountered or anticipated, their effect on the overall work effort/project and steps being taken to remedy problem situations.
h. Significant results of conferences, trips, or directives for the Contracting officer’s representatives.
i. Any other information which may cause significant changes in the program schedule.
3.2.2 Future plans. Summary of future plans, recommendations and proposals both for the next reporting period and for any long term plans.
3.2.3 Itemized man-hours and costs. Itemized man-hour and cost expenditure incurred for the reporting period by category and task, total contractual expenditures, and funds remaining as of the reporting date.
3.2.4 Contract deliveries status. The status of each deliverable end item, including data deliverables, as required by the contract. Provide item and contract identification, shipping/transmittal data, acceptance status, security classification, and schedule due date information.
3.2.5 Report preparer. Name of person(s) preparing report and telephone number(s).
3.3 Appendices. Appendices where applicable, for tables, references, charts, or other descriptive material. Each appendix shall be identified and referenced in the appropriate area of the report.
4. END OF DI-MGMT-80368A
Source: https://assist.dla.mil -- Downloaded: 2015-06-09T12:53Z
Source: https://assist.dla.mil -- Downloaded: 2015-03-09T18:20Z
Source: https://assist.dla.mil -- Downloaded: 2015-03-09T18:20Z
DATA ITEM DESCRIPTION Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503.
1. TITLE
COST/SCHEDULE STATUS REPORT (C/SSR)
2. IDENTIFICATION NUMBER
DI-MGMT-81467
3. DESCRIPTION/PURPOSE
This report is prepared by contractors and provides summarized contract cost and schedule performance information for program management purposes. The report (Sample Format 1) contains the following information: contract and program identification; contract data, including original and current contract values and the management estimate at completion (EAC); performance data which consists of cost and schedule performance information by summary level Work Breakdown Structure (WBS) elements; and narrative explanations, which presents information on significant cost and schedule variances and other contract problems or areas of interest.
4. APPROVAL DATE (YYMMDD)
951019
5. OFFICE OF PRIMARY RESPONSIBILITY (OPR)
OUSD(A&T)API/PM
6a. DTIC APPLICABLE 6b. GIDEP APPLICABLE
7. APPLICATION/INTERRELATIONSHIP
7.1 This Data Item Description (DID) contains the format and content preparation instructions for the data product generated by the specific and discrete task requirements as delineated in the contract.
7.2 This DID may be used in conjunction with the Contract Funds Status Report DID, DI-MGMT-81468, and the Contract Work Breakdown Structure DID, DI-MGMT-81334. This DID and the Cost Performance Report (CPR) DID, DI-MGMT-81466, will not be used on the same contract.
7.3 The C/SSR will be used to collect cost and schedule performance information on contracts over 12 months in duration where application of the CPR is not appropriate. There are no specific application thresholds for the C/SSR. However, application to contracts of less than $5 million (constant fiscal year 1990 dollars) should be evaluated carefully to ensure that only the minimum information necessary for effective management control is required.
7.4 C/SSR data elements will reflect the output of the contractor's C/SSR management procedures (refer to DFARS 252.242-7005). The definitions of terms contained in the Cost/Schedule Control Systems Criteria (C/SCSC) (refer to DFARS 252.242-7001) may be used as guidance in completing Columns (2) through (9) of the C/SSR with the exception of the definitions for Budgeted Cost for Work Scheduled (BCWS) and Budgeted Cost for Work Performed (BCWP). Application of the C/SSR does not invoke the unique requirements or disciplines of the C/SCSC, such as the use of work packages for determining BCWP. The contractor may use C/SCSC compliant practices if they constitute the contractor's normal way of doing business.
The method of deriving the BCWP will be left to the discretion of the reporting contractor and will be subject to negotiation, if necessary, and inclusion in the contract. While the contractor must be in a position to explain the method used for determining the BCWP, the in-depth demonstration review referred to in DFARS 252.242-7001 will not be required.
(Continued on page 2)
8. APPROVAL LIMITATION 9a. APPLICABLE FORMS
DD Form 2735 9b. AMSC NUMBER
D7121
10. PREPARATION INSTRUCTIONS
10.1 Format. Contractor formats should be substituted whenever they contain all the required data elements at the specified reporting levels in a form suitable for DOD management.
10.2 Content. The Cost/Schedule Status Report shall contain the following:
10.2.1 Contractor. Enter the contractor's name and location in Block 1.
10.2.2 Contract. Enter the contract name, number, type, and share ratio, if applicable, in Block 2.
10.2.3 Program. Enter in Block 3.a. the name, number, acronym and/or type, model, series, or other designation of the prime items purchased under the contract. Enter the program phase in Block 3.b. (Concept Exploration and Definition, Demonstration and Validation, and Engineering and Manufacturing Development are considered RDT&E. Production programs are those that have passed Milestone III.) (Continued on page 2)
11. DISTRIBUTION STATEMENT
Distribution Statement A: Approved for public release; distribution is unlimited.
DD Form 1664, APR 89 Previous editions are obsolete Page 1 of 6 Source: https://assist.dla.mil -- Downloaded: 2014-11-17T21:53Z
10/19/95 DI-MGMT-81467
Block 7, Application/Interrelationship (Continued)
7.5 Data reported on the C/SSR will pertain to all authorized contract work, including both priced and unpriced effort. The Government and the contractor may agree to exclude from C/SSR reporting portions of the contract for which performance reporting is not needed, such as firm fixed price contract line items. Data reported will normally be limited to level 3 of the WBS or higher. However, if a cost/schedule performance problem occurs at a lower level, the Program Manager (PM) may request information on an exception basis until the problem is resolved.
7.6 Reporting frequency will be specified in the contract. C/SSRs will not be required more frequently than monthly. Reports may reflect data as of the end of the calendar month or as of the contractor's accounting period cut-off date. Reports normally are due 25 days after the end of the report period.
7.7 Certain aspects of the report are subject to negotiation between the Government and the contractor, such as:
7.7.1 The variance thresholds which, if exceeded, require problem analysis and narrative explanations. Variance thresholds should be reviewed periodically, and changed if necessary, to ensure they continue to provide appropriate visibility without requiring excessive information. Refer to Chapter Three of the C/SSR Joint Guide for examples of the various methods for establishing variance thresholds.
7.7.2 The WBS elements reported in the Performance Data section. The level of detail will normally be limited to level 3 or higher, but lower levels may be selected for high-cost or -risk areas. Reporting levels should be reviewed periodically, and changed if necessary, to ensure they continue to provide appropriate visibility without requiring excessive information.
7.8 Contractor formats should be substituted for C/SSR formats whenever they contain all the required data elements at the specified reporting levels in a form suitable for DOD management use. The American National Standards Institute (ANSI) X12 standards (transaction sets 839 for cost and 806 for schedule), or the United Nations Electronic Data Interchange for Administration, Commerce and Transport (EDIFACT) equivalent, will be used for Electronic Data Interchange.
7.9 In all cases, the C/SSR CDRL is subject to "tailoring." Tailoring is defined as deleting requirements from this DID. Requiring more information in the C/SSR CDRL than specified in this DID is prohibited by DOD regulation.
All negotiated reporting provisions will be specified in the contract.
7.10 This DID supersedes DI-F-6010A.
Block 10, Preparation Instructions (Continued)
10.2.4 Report Period. Enter the beginning and ending dates of the period covered by the report in Block 4.
10.2.5 Signature, Title and Date. The contractor's authorized representative will sign the report and enter his/her title and the date in Block 5.
10.3 Contract Data.
10.3.1 Original Contract Target Cost. Enter in Block 6.a. the dollar value (excluding fee or profit) negotiated in the original contract. For a cost plus fixed fee contract, enter the estimated cost negotiated. For an incentive contract, enter the definitized contract target cost.
Source: https://assist.dla.mil -- Downloaded: 2014-11-17T21:53Z
10.3.2 Negotiated Contract Changes. Enter in Block 6.b. the cumulative cost (excluding fee or profit) applicable to definitized contract changes which have occurred since the beginning of the contract. Changes to estimated costs for cost plus fixed fee contracts will include only amounts for changes in the contract work scope; changes for cost growth will not be included.
10.3.3 Current Target Cost. Enter the sum of Block 6.a. and Block 6.b. in Block 6.c. The amount shown should equal the current dollar value (excluding fee or profit) on which contractual agreement has been reached.
10.3.4 Estimated Cost of Authorized, Unpriced Work. Enter in Block 6.d. the estimated cost (excluding fee or profit) for contract changes for which written authorization has been received but for which contract prices have not been negotiated.
10.3.5 Contract Budget Base (CBB). Enter the sum of Block 6.c. and Block 6.d. in Block 6.e.
10.3.6 Management Estimate at Completion. Enter in Block 6.f. the contractor's most likely EAC. The estimate should include actual costs to date plus a knowledgeable projection of future performance. The estimate should be based on the agreed work scope as reflected in the CBB (Block 6.e.).
The contractor may include an estimate for management reserve (MR), if applicable. The contractor also may include a realistic estimate for program risk or probable future business conditions. If the management EAC differs from the value in Column (8) of Block 7.e., the difference shall be discussed in the Narrative Explanation section.
10.3.7 Variance at Completion. Enter the difference between Block 6.e. and Block 6.f. in Block 6.g.
10.3.8 Over Target Baseline (OTB) Date. If applicable, enter in Block 6.h.
the report period ending date of the C/SSR in which the latest approved OTB first appears. The Government and the contractor must agree on the terms of an OTB prior to its establishment. The contractor shall not implement an OTB without prior written approval from the Contracting Officer.
10.4 Performance Data.
10.4.1 Work Breakdown Structure (WBS) Elements. Enter in Column 1 of Block 7.a. the name of the WBS elements for which cost information is being reported. WBS elements or levels required will be those specified in the contract. Organizational categories may be used in lieu of WBS elements if the Government and the contractor agree that such categories would be more beneficial.
10.4.2 Cost of Money (COM). Enter in Columns (2) through (9) of Block 7.b.
the appropriate COM figures. If COM has been included in the costs reported above, then COM will be shown as a non-add entry on this line with an appropriate notation. When a facility has two or more contracts with cost reporting requirements, the contractor shall ensure that all COM values are derived from the same accounting source.
10.4.3 General and Administrative (G&A). Enter in Columns (2) through (9) of Block 7.c. the appropriate G&A costs. If G&A has been included in the costs reported above, then G&A will be shown as a non-add entry on this line with an appropriate notation. If a G&A classification is not used, no entry will be made other than an appropriate notation to that effect.
10.4.4 Undistributed Budget (UB). Enter in Column (7) of Block 7.d. the amount of budget applicable to authorized contract effort which has not been identified to WBS elements at or below the reporting level. Enter in Column
(8) of Block 7.d. an estimate for the scope of work represented by the amount shown in Column (7) of Block 7.d. Enter the difference, if any, between Column (7) and Column (8) in Column (9) of Block 7.d. All UB must be explained in the Narrative Explanation section.
10.4.5 Subtotal - Performance Measurement Baseline (PMB). Enter in Columns
(2) through (9) of Block 7.e. the totals of the distributed budgets, actuals and estimates for the WBS elements, COM, G&A and UB in Blocks 7.a. through 7.d.
10.4.6 Management Reserve (MR). Enter in Column (7) of Block 7.f. the amount of budget identified as MR as of the end of the report period. Amounts of MR applied during the reporting period will be explained in the Narrative Explanation section. MR application will be explained in terms of amounts applied, WBS elements to which applied, and reasons for application.
10.4.7 Total. Enter the sum of the direct and indirect budgets and costs in Columns (2) through (7). The total in Column (7) will equal the value in Block 6.e. unless an OTB has been implemented.
10.4.8 Data Elements. For each WBS element in Block 7.a. and the categories in Blocks 7.b. through 7.g., enter the following information where applicable:
10.4.8.1 Budgeted Cost for Work Scheduled (BCWS) (Column 2). Enter the numerical representation of the value of all work scheduled to be accomplished (in-process and complete) as of the reporting cut-off date.
10.4.8.2 Budgeted Cost for Work Performed (BCWP) (Column 3). Enter the numerical representation of the value of all work accomplished (in-process and complete) as of the reporting cut-off date.
10.4.8.3 Actual Cost of Work Performed (ACWP) (Column 4). Enter the actual costs (direct and indirect) applicable to work accomplished as of the reporting cut-off date. Actual costs and budgeted costs will be reported on a comparable basis.
10.4.8.4 Schedule Variance (Column 5). Enter the difference between the BCWS and the BCWP by subtracting Column (2) from Column (3). A negative figure indicates an unfavorable variance and should be shown in parentheses.
Variances exceeding established thresholds shall be fully explained in the Narrative Explanation section.
10.4.8.5 Cost Variance (Column 6). Enter the difference between the BCWP and the ACWP by subtracting Column (4) from Column (3). A negative figure indicates an unfavorable variance and should be shown in parentheses.
Variances exceeding established thresholds shall be fully explained in the Narrative Explanation section.
10.4.8.6 Budget at Completion (BAC) (Column 7). Enter the total budget identified to each WBS element listed in Column (1). Assigned budgets will consist of the original budgets plus or minus budget adjustments resulting from contract changes, internal replanning, or application of MR.
10.4.8.7 Estimate at Completion (EAC) (Column 8). Enter the contractor's latest revised estimate of cost at completion including estimated overrun/underrun for all authorized work. The estimated cost at completion consists of the sum of the actual cost to date plus the latest estimate of cost for work remaining.
10.4.8.8 Variance at Completion (VAC) (Column 9). Enter the difference between the BAC and the EAC by subtracting Column (8) from Column (7). A negative figure indicates an unfavorable variance and should be shown in parentheses. Variances exceeding established thresholds shall be fully explained in the Narrative Explanation section.
10.5 Narrative Explanations.
10.5.1 Provide a summary analysis of overall contract performance, including significant existing or potential problems and corrective actions taken or required, to include government action where required.
10.5.2 Explain cost, schedule and EAC variances that meet variance analysis thresholds provided in the contract. Explanations of these variances must be explicit and comprehensive, and must clearly identify the nature of the problems being experienced, the impact on the total contract, and the corrective actions taken or required. See Chapter Three of the C/SSR Joint Guide for examples of variance threshold methodologies. While this DID does not require the reporting of current period cost performance data, the PM may tailor the C/SSR CDRL DD Form 1423 to require current period variance analysis.
10.5.3 Normally, the amount shown in Block 7.g. of Column (7), total BAC (also called Total Allocated Budget (TAB)), will equal the amount shown in Block 6.e., CBB. This relationship is necessary to ensure that the BCWS and the BCWP provide meaningful indicators of contractual progress. If the TAB exceeds the CBB, it is an indication that an OTB has been implemented. In this case, the contractor shall reflect in Block 6.h. the report period end date of the C/SSR in which the latest approved OTB first appeared and shall provide the following information in the Narrative Explanation section of the C/SSR in which the latest approved OTB first appeared: the reasons for the OTB; the identity of the WBS element(s) to which additional budget was added;
and the approval authority for the latest approved OTB. The Government and the contractor shall agree on what OTB information will appear in subsequent C/SSR submissions. Refer to Chapter Four of the C/SSR Joint Guide for more information on OTBs.
C O
S T
/S C
H E
D U
L E
S T
A T
U S
R E
P O
R T b
C O
S T
O F
M O
N E
Y c
G E
N E
R A
L
A D
M
IN
IS
T
R A
T
IV
E d
U N
D
IS
T R
IB
U
T E
D B
U D
G E
T e
S U
B T
O T
A L
P e rf o rm a n c e
A U
T H
O R
IZ
E
D C
O N
T R
A C
T O
R R
E P
R E
S E
N T
A T
IV
E c
S
IG
N A
T U
R E d
D A
T E
S
IG
N E
D
(Y
Y M
M D
D a
N A
M E
L a s t, F ir s t, M id d le I n it ia l)
C O
N T
R A
C T
D A
T A a
O R
IG
IN
A L
C O
N T
R A
C T
T A
R G
E T
C O
S T b
N E
G O
T
IA
T E
D C
O N
T R
A C
T C
H A
N G
E S c
C U
R R
E N
T T
A R
G E
T C
O S
T a b d
E
S T
IM
A
T E
D C
O S
T O
F A
U T
H O
R
IZ
U N
P R
IC
E
D W
O R
K e
C O
N T
R A
C T
B U
D G
E T
B A
S E c d
P E
R F
O R
M A
N C
E D
A T
A
IT
E
M
(1
C U
M U
L A
T
IV
E T
O D
A T
E A
T C
O M
P L
E T
IO
N
B U
D G
E T
E D
(7
E S
T
IM
A T
E D
(8
V A
R
IA
N C
E
(9
B U
D G
E T
E D
C O
S T
W O
R K
S C
H E
D U
L E
D
(2
W O
R K
P E
R F
O R
M E
D
(3
A C
T U
A L
C O
S T
W
R K
P E
R F
O R
M E
D
(4
S C
H E
D U
L E
(5
C O
S T
(6
V A
R
IA
N C
E
C L
A S
S
IF
IC
A
T
IO
(W h e n f il le d i n
C L
A S
S
IF
IC
A
T
IO
(W h e n f il le d i n a
W O
R K
B R
E A
K D
O W
S
R U
C T
U R
E E
L E
M E
N T
C O
N T
R A
C T
O R a
N A
M E b
P H
A S
E
X o n e
R D
T
E P
R O
D U
C T
IO
N b
L O
C A
T
IO
N
A d d re s s a n d Z
IP
C o d e
C O
N T
R A
C T a
N A
M E b
N U
M B
E R
P R
O G
R A
M a
N A
M E
R E
P O
R T
P E
R
IO
D a
F R
O M
Y
Y M
M D
D b
(Y
M
M D
D c
T Y
P E d
S H
A R
E R
A T
IO
b
T
IT
L f.
M A
N A
G E
M E
N T
E S
T
IM
A T
E A
T C
O M
P L
E T
IO
N g
V A
R
IA
N C
E A
T C
O M
P L
E T
IO
N e f.
h
O V
E R
T A
R G
E T
B A
S E
L
IN
E D
A
Y
M M
D e a su re m e n t B a se li n e f.
A
N A
G E
M E
N T
R E
S E
R V
E g
T O
T A
L
D O
L L
A R
S I
N
SAMPLE FORMAT 1. Cost/Schedule Status Report Page 6 of 6
Title: Contract Funds Status Report (CFSR)
Number: DI-MGMT-81468 Approval Date: 19 OCT 1995 AMSC Number: D7122 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility:
Applicable Forms: N/A
Use/relationship:
The Contract Funds Status Report (CFSR), DD Form 1586, Sample Format 1, is designed to supply funding data about defense contracts to Program Managers for: (a) updating and forecasting contract funds requirements, (b) planning and decision making on funding changes to contracts, (c) developing funds requirements and budget estimates in support of approved programs, (d) determining funds in excess of contract needs and available for deobligation, and (e) obtaining rough estimates of termination costs.
This Data Item Description (DID) contains the format and content preparation instructions for the data product generated by the specific and discrete task requirements as delineated in the contract.
This DID may be used in conjunction with the Contract Work Breakdown Structure DID, DI-MGMT-81334, the Cost Performance Report DID, DI-MGMT-81466, and the Cost/Schedule Status Report DID, DI-MGMT-81467.
Contractual Application. The CFSR is applicable to contracts over 6 months in duration.
No specific application thresholds are established, but application to contracts of less than $1,000,000 (constant fiscal year (FY) 1990 dollars) should be evaluated carefully to ensure only the minimum information necessary for effective management control is required. The CFSR will not be applied to firm fixed price contracts (as defined in FAR 16.202) unless unusual circumstances require specific funding visibility. CFSRs may be applied to unpriced portions of firm fixed price contracts that are estimated to be in excess of twenty (20) percent of the initial contract value. Only those parts of the CFSR essential to the management of each acquisition will be required. The FAA Program Manager will determine the need for contract funds information and apply only those portions of the CFSR deemed appropriate. To ensure that only minimum data is required over the life of the contract, provisions should be included in the contract to review reporting requirements at least annually and change them, if necessary, at no charge to the Government.
Level of Reporting. If a contract is funded with a single appropriation, a single line entry at the total contract level should be considered for CFSR reporting. Reporting by line item or WBS element will be limited to only those items or elements needed to support funds management requirements. A reduced level of reporting may be implemented on contracts (a) with a dollar value between $250,000 and $1,000,000 (constant FY 1990 dollars); (b) that are for time and material; or (c) for which only limited funding requirements information is needed.
Multiple Appropriations. Where two or more appropriation sources are used for funding a single contract, contractors will segregate funds data by appropriation accounting reference. The procuring agency will supply the appropriation numbers applicable to individual line items or WBS elements. If a single line item or WBS element is funded by more than one appropriation, methods for segregating and reporting such information will be negotiated and specified in the contract.
Electronic Data Interchange. The American National Standards Institute (ANSI) X12 standard (transaction set 839), or the United Nations Electronic Data Interchange For Commerce, Administration and Transport (EDIFACT) equivalent, will be used for EDI transmission.
Frequency and Submission. The CFSR will be a contractual requirement as set forth in the Contract Data Requirements List (CDRL) DD Form 1423. Unless otherwise provided in the contract, the CFSR will be prepared as of the end of each calendar quarter or contractor accounting period nearest the end of each quarter. The required number of copies of the CFSR will be forwarded within 25 calendar days after the "as of" date of the report, or as otherwise specified in the contract. In the event of exceptional circumstances which call for increased frequency in reporting, such frequency will not be more often than monthly and will be negotiated and specified in the contract.
Explanations of Terms.
Open Commitments. For this report, a commitment represents the estimated obligation of the contractor (excluding accrued expenditures) to vendors or subcontractors (based on the assumption that the contract will continue to completion).
Accrued Expenditures. For this report, include recorded or incurred costs as defined within the Allowable Cost, Fee and Payments Clause (FAR 52.216-7) for cost type contracts or the Progress Payments Clause (FAR 52.232-16) for fixed price type contracts, plus the estimated fee or profit earned. Such costs include:
Actual payments for services or items purchased directly for the contract.
Costs incurred, but not necessarily paid, for storeroom issues, direct labor, direct travel, direct other in-house costs and allocated indirect costs.
Progress payments made to subcontractors.
Pension costs provided they are paid at least quarterly.
Termination Costs. Although this report is prepared on the basis that the contract will continue to completion, it is necessary to report estimated termination cost by government fiscal year and generally by more frequent intervals on incrementally funded contracts. The frequency will be dependent on the funding need dates (i.e., quarterly) and should be compatible with the contract funding clauses, Limitation of Funds clause (cost type contracts) or Limitation of Obligation clause (fixed price type contracts).
Termination costs include such items as loss of useful life of special tooling, special machinery and equipment; rental cost of unexpired leases; and settlement expenses. The definition of termination costs is included in FAR 31.205-42. In the event the Special Termination Costs clause (DFARS 252.249-7000) is authorized, then costs defined therein will be eliminated from the estimated termination costs.
The CFSR DID may be “tailored” in Block 16 of CDRL DD Form 1423. Tailoring is defined as deleting requirements from a DID. Requiring more information in the CFSR CDRL DD Form 1423 than specified in this DID is prohibited by DOD regulation. All negotiated reporting provisions will be specified in the contract’s CDRL.
This DID supersedes DI-F-6004B.
Requirements:
Format. Contractor formats should be substituted whenever they contain all the required data elements at the specific reporting levels in a form suitable for FAA management.
Content. The CFSR shall contain the following information:
Item 1 - Contract Number. Enter the assigned contract number and the latest modification number on which contractual agreement has been reached
Item 2 - Contract Type. Enter the type of contract as identified in FAR Part 16 (e.g., Cost Plus Fixed Fee (CPFF), Fixed Price Incentive (FPI), etc.).
Item 3 – Contract Funding For. Enter the applicable type as follows:
Multi-Year Procurement (MYP) Incrementally Funded Contract (INC) Contract for a Single Year (SYC)
For FY. For contracts which are financed with funds appropriated in more than one fiscal year, a report is required for each fiscal year’s funds where the separate year’s funds in the contract are associated with specific quantities of hardware or services to be furnished. The fiscal year (s) being reported will be shown in this block and that year’s share of the total target prices (initial and adjusted) will be shown in Items 9 and 10.
Item 4 - Appropriation. Enter the appropriation name (i.e., Research, Development, Test and Evaluation, Aircraft Procurement, etc.) in this block.
Item 5 - Previous Report Date. Enter the cut-off date of the previous report. (Year, Month, Day)
Item 6 - Current Report Date. Enter the cut-off date applicable to this report.
(Year, Month, Day)
Item 7 - Contractor. Enter the name, division (if applicable), and mailing address of the reporting contractor.
Item 8 - Program. Identify the program by name or enter the type, model and series or other military designation of the prime item or items purchased on the contract.
If the contract is for services or a level-of effort (i.e., research, flight test, etc.), the title of the service should be shown.
Item 9 - Initial Contract Price. Enter the dollar amounts for the initial negotiated contract target price (or estimated price for non-incentivized contracts) and contract ceiling price when appropriate. For contracts which are financed with funds appropriated in more than one fiscal year, only the share of the total initial target and ceiling associated with the fiscal year shown in Item 3 will be entered.
Item 10 - Adjusted Contract Price. Enter the dollar amounts for the adjusted contract target price (initial negotiated contract plus supplemental agreements) and adjusted contract ceiling price or estimated ceiling price where appropriate. For contracts which are financed with funds appropriated in more than one fiscal year, only the share of the total adjusted target and ceiling associated with the fiscal year shown in Item 3 will be entered.
Item 11 - Funding Information.
Column a. - Line Item/Work Breakdown Structure (WBS) Element. Enter the line item or WBS elements specified for CFSR coverage in the contract.
Column b. - Appropriation Identification. Enter the appropriation number supplied by the FAA Component for the contract or, if applicable, each line item or WBS element) will be shown in Items 9 and 10.
Column c. - Funding Authorized To Date. Enter dollar amounts of contract funding authorized under the contract from the beginning of the fiscal year(s) shown in Item 3 through the report date shown in Item 6.
Column d. - Accrued Expenditures Plus Open Commitments Total. For contract work authorized, enter the total of (a) the cumulative accrued expenditures incurred through the end of the reporting period, and (b) the open commitments on the "as of" date of the report. Enter the total applicable to funds for the fiscal year(s) covered by this report as shown in Item 3.
Separation of Open Commitments and Accrued Expenditures. On selected contracts, the separation of open commitments and accrued expenditures by line item or WBS element may be a negotiated requirement in the contract. Utilization of this provision should be held to the minimum essential to support information needs of the procuring agency. In the event this separation of data is not available in the contractor's accounting system or cannot be derived without significant effort, provision should be made to permit use of estimates. The procedures used by the contractor in developing estimates shall be explained in the Remarks section of the report.
Notice of Termination. When a Notice of Termination has been issued, potential termination liability costs will be entered in this column. They will be identified to the extent possible with the source of liability (prime or subcontract).
Column e. - Contract Work Authorized - Definitized. For the fiscal year(s) shown in Item 3, enter the estimated price for the authorized work on which contractual agreement has been reached, including profit/fee, incentive and cost sharing associated with projected over/underruns. Amounts for contract changes will not be included in this item unless they have been priced and incorporated in the contract through a supplemental agreement.
Column f. - Contract Work Authorized - Not Definitized. Enter the contractor's estimate of the funds requirements for performing required work (e.g., additional agreements or changes) for which firm contract prices have not yet been agreed to in writing by the parties to the contract. Report values only for items for which written orders have been received. For incentive type contracts, show total cost to the Government (recognizing contractor participation). Enter in the Remarks section a brief but complete explanation of the reason for the change in funds.
Column g. - Subtotal. Enter the total estimated price for all work authorized on the contract (Column e. plus Column f.).
Column h. - Forecast - Not Yet Authorized. Enter an estimate of funds requirements, including the estimated amount for fee or profit, for changes proposed by the Government or by the contractor, but not yet directed by the contracting officer. In the Remarks section state each change document number and estimated value of each change.
Column i. - Forecast - All Other Work. Enter an estimate of funds requirements for additional work anticipated to be performed (not included in a firm proposal) which the contractor, based on his knowledge and experience, expects to submit to the Government within a reasonable period of time.
Column j. - Subtotal. Enter an estimate of total requirements for forecast funding (the sum of Column h. plus Column i.). Specific guidelines on what the contractor may include in the funding forecast section may be made a part of the contract.
Column k. - Total Requirements. Enter an estimate of total funds requirements for contract work authorized and forecast (the sum of Column g.
plus Column j.).
Column l. - Funds Carryover. For incrementally funded contracts only, report the amount by which the prior federal fiscal year funding was in excess of the prior year's requirement. If there is no carryover, report zero. Specific instructions for the use of this item may be made a part of the contract.
Column m. - Net Funds Required. Enter an estimate of net funds required, subtracting funds carryover in Column 1. from total requirements in Column k.
Column Totals. Totals should be provided for Columns c. through m. for all line items or WBS elements reported.
Item 12 - Contract Work Authorized (With Fee/Profit) - Actual Or Projected.
Data entries will be as follows: In the first column, actuals cumulative to date; in all other columns except the last, projected cumulative amounts from the start of the contract to the end of the period indicated in the column heading; in the last column, the projected cumulative amounts from the start to the end of the contract or fiscal year being reported.
When the contractor has developed a range of estimates at completion, the most likely estimate shall be used to develop the projected cumulative data in this item.
Column Headings. Columns 2 through 9 will be headed to indicate periods covering the life of the contract or fiscal year being reported and may be headed to show months, quarters, half years and/or fiscal years as prescribed by the procuring agency.
Data Composition. Projected data should include all planned obligations, anticipated accruals, anticipated over/under targets (total cost to the Government recognizing contractor participation), G&A, and fee/profit. For award fee contracts, the fee actually awarded will be included in Column 1, Actual to Date.
The contractor shall describe in the Remarks section the amount, by period, and rationale for any award fee projections included in Columns 2 through 10.
Item 12.a. - Open Commitments. In the first column enter commitments open as of the date of the report. In subsequent columns enter the commitments projected to be open as of the end of each period indicated by the column headings. The amount entered will be the projected cumulative commitments less the planned cumulative expenditures as of the end of time period indicated. At the end of the contract, the amount will be zero.
Item 12.b. - Accrued Expenditures. In the first column enter actuals to date. In subsequent columns enter the projected cumulative accrued expenditures as of the end of each period indicated by the column headings.
Item 12.c. - Total (12.a. and 12.b.). In the columns provided, enter the total contract work authorized - actuals to date (Column 1) or projected (Columns 2 through 10). This total is the sum of open commitments and accrued expenditures projected through the periods indicated by the column headings.
Significant changes in the amount or timephasing of this item shall be explained in the Remarks section.
Item 13 - Forecast Of Billings To The Government. In the first column enter the cumulative amount received from the Government plus any unpaid billings to the Government through the current report date, including amounts applicable to progress or advance payments. In succeeding columns enter the amount expected to be billed to the Government during each period reported (assuming the contract will continue to completion). Amounts will not be cumulative.
Item 14 - Estimated Termination Costs. In the columns provided, enter the estimated costs that would be necessary to liquidate all government obligations if the contract were to be terminated in that period. These entries are the amounts required in addition to the amounts shown in Item 12. Applicable fee/profit should be included.
These entries may consist of "rough order of magnitude" estimates and will not be construed as providing formal notification having contractual significance. This estimate will be used to assist the Government in budgeting for the potential incurrence of such cost. On contracts with Limitation of Funds/Obligation clauses, where termination costs are included as part of the funding information in Block 11, enter the amounts required for termination reserve on this line.
Remarks Section.
General. This section shall contain any additional information or remarks which support or explain data submitted in this report. At a minimum, the contractor shall present the following information: (a) explanations of funds changes; (b) procedures used to develop estimates of open commitments and accrued expenditures; (c) the amount and rationale for any award fee projections included in Item 12; (d) explanations of significant changes in the amount or timephasing of actual or projected total contract work authorized; and (e) any other information deemed significant or noteworthy. The contractor also shall provide a projected contract completion date that supports the funding projections in Item 12.
Changes. The Remarks section shall contain information regarding changes, as indicated below. A change in a line item shall be reported when the dollar amount reported in Item 11, Column k. of this submission differs from that reported in the preceding submission. The movement of dollar amounts from one column to another (Item 11, Columns e. through j.), indicating a change in the firmness of funds requirements, need not be reported in this section. Change reporting shall include the following: the location of the changed entry (page, line, and column); the dollar amount of the change; and a narrative explanation of the cause of each change.
End of DI-MGMT-81468
Title: CONTRACTOR'S PERSONNEL ROSTER
Number: DI-MGMT-81834A Approval Date: 20130118 AMSC Number: N9316 Limitation: N/A DTIC Applicable: No GIDEP Applicable: N/A Office of Primary Responsibility: SH/MS10 Applicable Forms: N/A
Use/relationship:
This roster shall be used to list all contractor personnel assigned to the contract.
This Data Item Description (DID) contains the content and preparation instructions for data product resulting from the work task specified in the contract.
Requirements:
1. Format. The Roster shall be in contractor’s format.
2. Content. The Roster shall contain an alphabetical listing of the names of all contractor personnel assigned to the contract.
2.1 The roster shall identify the following for each employee:
a. Change Status: Add/Change/Remove
b. Start Date
c. End Date
d. First Name
e. Middle Name
f. Last Name
g. Position Title
h. Email Address
i. Work Phone Number
j. Physical Work Location – Base Name
k. Physical Work Location - City
l. Physical Work Location - State
m. Physical Work Location – Building Number
n. Physical Work Location – Room Number
o. Contract Number
p. Contract Name
q. Contracting Supervisor
r. Government Support POC
s. Supporting Code
2.2 The roster shall identify work schedules for full time and part time employees and shall include current CAC and clearance information for each.
3. End of DI-MGMT-81834A.
Source: https://assist.dla.mil -- Downloaded: 2015-03-27T19:41Z
Title: Phase-Out Transition Plan
Number: DI-MGMT-81945 Approval Date: 20130916
AMSC Number: N9430 Limitation: N/A
DTIC Applicable: N/A GIDEP Applicable: N/A
Office of Primary Responsibility: AS/PMA-207
Applicable Forms: N/A
Use/relationship:
The Phase-Out Transition Plan provides a detailed description of the transfer of full assumption of duties at each site to the follow-on contractor.
This Data Item Description (DID) contains format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract and described in the Performance Work Statement (PWS). It should be tailored to the minimum data requirements of the applicable contract or purchase order.
1. Format. Contractor format is acceptable.
2. Content. The Phase-Out Transition Plan shall include:
a. A written comprehensive plan explaining actions required to complete the total transition effort within a sixty (60) calendar day transition period.
b. Details of accounts and subscription services to be terminated or transferred.
c. Process to conduct a full joint inventory and transference of all Government
Furnished Material inventory including all records.
d. Status of all items in inventory as well as the items that have been inducted into repair facilities, being modified or are being purchased.
e. Details for the removal of all contractor owned items.
f. Critical path schedule for risk mitigation of the transition period.
g. Plan to make training and certification records available of contractor personnel who are considering employment with the succeeding contractor.
3. End of DI-MGMT-81945.
Source: https://assist.dla.mil -- Downloaded: 2015-05-19T15:28Z
Source: https://assist.dla.mil -- Downloaded: 2015-02-26T19:02Z
Source: https://assist.dla.mil -- Downloaded: 2015-03-27T19:38Z
Source: https://assist.dla.mil -- Downloaded: 2015-03-27T19:38Z
| DI-ADMN-81505 |
| DI-CMAN-81253A |
| DI-ISPC-80950B |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .