FA824015R7218.pdf
PDF 573 KB Posted
- Solicitation number
- FA8240-15-R-7218
About this file
FA8240-15-R-7218
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 33 (REV. 9-97)
PREVIOUS EDITION NOT USABLE Prescribed by GSA – FAR (48 CFR) 53/214(c)
SOLICITATION, OFFER AND AWARD JRS
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15CFR 7900)
RATING
DO: C9
Page of Page
2. CONTRACT NO. 3. SOLICITATION NO.
FA8240-15-R-7218
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
7. ISSUED BY
DEPARTMENT OF THE AIR FORCE, DIRECTORATE OF CONTRACTING
AFTC/PZ (Hill)
6082 FIR AVE, BLDG 1232
HILL AIR FORCE BASE UT 84056-5820
BUYER: KAITLIN BARNARD/AFTZ/PZSA
KAITLIN.BARNARD@US.AF.MIL
Phone: (801) 777- 9947 Fax: (000) 000-0000 No Collect Calls
FA8240 8. ADDRESS OFFER TO (If other than Item 7)
11. TABLE OF CONTENTS
(X) SEC. DESCRIPTON PAGE(S) (X) Sec. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE PART II - CONTRACT CLAUSES
X A SOLICITATION/CONTRACT FORM
X B SUPPLIES OR SERVICES AND
C DESCRIPTION/SPECS/WORK STATEMENT
D PACKAGING AND MARKING
X E INPECTION AND ACCEPTANCE
X F DELIVERIES OR PERFORMANCE
X G CONTRACT ADMINISTRATION DATA
X H SPECIAL CONTRACT REQUIREMENTS
X I CONTRACT CLAUSES
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER
X J LIST OF ATTACHMENTS
X K REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
PART IV - REPRESENTATIONS AND INSTRUCTIONS
X L INSTRS., CONDS., AND NOTICES TO OFFERORS
X M EVALUATION AND FACTORS FOR AWARD
OFFER (Must be fully completed by offeror)
24. ADMINISTERED BY (If other than Item 7) SCD:C 25. PAYMENT WILL BE MADE BY CODE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
28. AWARD DATE
X
5. DATE ISSUED 6.REQUISITION/PURCHASE NO
NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder”.
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if hand carried, in the depository located in until 3:00 (Hour) local time 31-AUG-2015 (Date).
CAUTION- LATE Submissions, Modifications, and Withdrawals: Section L, Provision No 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this section.
10. FOR INFORMATION
CALL:
A. NAME
KEVIN J HUGIE
B. TELEPHONE (NO COLLECT
CALLS)(801 ) 777 - 4884
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within 180 calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT(See Section I, Clause No 52.232-8)
10 CALENDAR DAYS 20 CALENDAR DAYS 30 CALENDAR DAYS CALENDAR DAYS
14. ACKNOWLEDGEMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated:
AMENDMENT NO. DATE AMENDMENT NO. DATE
15A. NAME AND
ADDRESS OF
OFFEROR
CODE FACILITY 16. NAME AND TITLE OF PERSON
AUTHORIZED TO SIGN OFFER (Type or print)
15B. TELEPHONE NO.
(Include Area Code)
15C.CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE-ENTER
SUCH ADDRESS IN SCHEDULE.
17. SIGNATURE 18. OFFER DATE
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS 20. AMOUNT
21. ACCOUNTING AND APPROPRIATION
SEE SCHEDULE
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN
COMPETITION
10 U.S.C. 2304 (c) ( ) 41 U.S.C. 253 (c)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
SOLICITATION
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
C. E-MAIL ADDRESS
KEVIN.HUGIE@US.AF.MIL
X
Request for Proposal FA8240-15-R-7218
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
Notice to Offeror: funds are not presently available for this effort. No award will be made under this solicitation until funds are received. The Government reserves the right to cancel this soliciation, either before or after the closing date. In the event the Government cancels this soliciation, the Government has no obligation to reimburse an Offeror for any costs.
The CLIN numbering scheme is: 1) first two digits represent the contract year, 2) the next digit represents the Annex, and 3) the last digit represents the CLIN type (Labor, Material, Travel, Award Fee, Data)
For example: 0223 is contract year 3 (option year 2), Annex 2, Travel
0731 is contract year 8 (option year 7), Annex 3, Labor
The number scheme does not apply to the transition CLINs (0001, 0002, 0003, 0004). Also, the J-Tech II Enterprise-level data CLIN is noted as Annex "0."
Transition Period
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 EA
Transition Reference Transition Plan Annex 1 412 TW
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 EA 1 JUL 2016 30 SEP 2016
Proposed Period of Performance
A TBD 1 EA
Transition Period
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 EA
Transition Reference Transition Plan Annex 2 NTTR
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 EA 1 JUL 2016 30 SEP 2016
Proposed Period of Performance
A TBD 1 EA
Transition Period
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 EA
Transition Reference Transition Plan Annex 3 UTTR
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 EA 1 JUL 2016 30 SEP 2016
Proposed Period of Performance
A TBD 1 EA
Transition Period
Item No.
Firm Fixed Price
Transition Period
Quantity U/I Unit Price Amount
1 EA
Transition Reference Transition Plan Annex 4 NAWCWD
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 EA 1 JUL 2016 30 SEP 2016
Proposed Period of Performance
A TBD 1 EA
Base Year - Data - J-Tech II Enterprise Level
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
Data in Support of the J-Tech II Enterprise-level PWS Data Item Numbers AA01 - AA08 Exhibit: AA
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2016 30 SEP 2017
Proposed Period of
A TBD 1 LO
Base Year - Labor - Annex 1
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Estimated Total Price
1 LO
Labor in Support of Annex 1 Engineering and Technical Support Services for Annex 1 412 TW (IAW the Enterprise-leve PWS, Annex-level PWS, and TDD) THE AWARD FEE SHALL BE NO LESS THAN 4% OF THE ESTIMATED TOTAL LABOR COSTS. THE AWARD
FEE ASSOCIATED WITH THIS LABOR CLIN SHALL BE PROPOSED AT CLIN 0014
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2016 30 SEP 2017
Proposed Period of
Base Year - Material - Annex 1
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Material in Support of Annex 1 Material for AFTC Annex 1 412 TW (IAW the PWS, Annex Specific PWS, and TDD)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of
A TBD 1 LO 1 OCT 2016 30 SEP 2017
Proposed Period of Performance
A TBD 1 LO
Base Year - Travel - Annex 1
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Travel in Support of Annex 1 Travel for AFTC Annex 1 412 TW (IAW the PWS, Annex Specific PWS, and TDD)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2016 30 SEP 2017
Proposed Period of Performance
A TBD 1 LO
Base Year - Award Fee - Annex 1
Item No.
Cost Plus Award Fee Quantity U/I Award Fee
1 LO
Award Fee in Support of Annex 1 Award Fee for AFTC Annex 1 412 TW.
THE AWARD FEE SHALL BE NO LESS THAN 4% OF THE ESTIMATED TOTAL LABOR COSTS (CLIN 0011)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination
Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2016 30 SEP 2017
Proposed Period of Performance
A TBD 1 LO
Award Fee Period Award Fee Available Award Fee Earned
1 Oct - 30 Mar $_________________ $_________________
1 Apr - 30 Sep $_________________ $_________________
Award Fee is earned on a six-month basis. The Contractor is to divide the Award Fee amount for this CLIN into two equal amounts (rounded to the nearest dollar) . One of the two amounts will be included in the 1 Oct - 31 Mar Award Fee Pool and the other will be included in the 1 Apr - 30 Sep Award Fee Pool. The Award Fee Earned will be the Award Fee Available multiplied by the Award Fee Score.
Unearned Award Fee shall not carry from one Award Fee Period to another.
Example: Award Fee Available = $1,000,000 Award Fee Score = 90 percent Award Fee Earned = .90 X $1,000,000 = $900,000 Award Fee Period: 1 Oct - 30 Mar
Base Year - Data - Annex 1
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
Data in Support of Annex 1 Data Item Number AB01 Exhibit: AB
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2016 30 SEP 2017
Proposed Period of Performance
A TBD 1 LO
Base Year - Labor - Annex 2
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Estimated Total Price
1 LO
Labor in Support of Annex 2 Engineering and Technical Support Services for Annex 2 NTTR (IAW the PWS, Annex Specific PWS, and TDD).
THE AWARD FEE SHALL BE NO LESS THAN 4% OF THE ESTIMATED TOTAL LABOR COSTS. THE AWARD
FEE ASSOCIATED WITH THIS LABOR CLIN SHALL BE PROPOSED AT CLIN 0024
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2016 30 SEP 2017
Proposed Period of
Base Year - Material - Annex 2
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Material in Support of Annex 2 Material for Annex 2 NTTR (IAW the PWS, Annex Specific PWS, and TDD).
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2016 30 SEP 2017
Proposed Period of Performance
A TBD 1 LO
Base Year - Travel - Annex 2
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Travel in Support of Annex 2 Travel for Annex 2 NTTR (IAW the PWS, Annex Specific PWS, and TDD).
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2016 30 SEP 2017
Proposed Period of Performance
A TBD 1 LO
Base Year - Award Fee - Annex 2
Item No.
Cost Plus Award Fee Quantity U/I Award Fee
Base Year - Award Fee - Annex 2
1 EA
Award Fee in Support of Annex 2 Award Fee for the Annex 2 NTTR.
THE AWARD FEE SHALL BE NO LESS THAN 4% OF THE ESTIMATED TOTAL LABOR COSTS (CLIN 0021)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 EA 1 OCT 2016 30 SEP 2017
Proposed Period of Performance
A TBD 1 EA
Award Fee Period Award Fee Available Award Fee Earned
1 Oct - 30 Mar $_________________ $_________________
1 Apr - 30 Sep $_________________ $_________________
Award Fee is earned on a six-month basis. The Contractor is to divide the Award Fee amount for this CLIN into two equal amounts (rounded to the nearest dollar) . One of the two amounts will be included in the 1 Oct - 31 Mar Award Fee Pool and the other will be included in the 1 Apr - 30 Sep Award Fee Pool. The Award Fee Earned will be the Award Fee Available multiplied by the Award Fee Score.
Unearned Award Fee shall not carry from one Award Fee Period to another.
Example: Award Fee Available = $1,000,000 Award Fee Score = 90 percent Award Fee Earned = .90 X $1,000,000 = $900,000 Award Fee Period: 1 Oct - 30 Mar
Base Year - Data - Annex 2
Firm Fixed Price Quantity U/I Unit Price Amount
Base Year - Data - Annex 2
1 LO Not Separately Priced Not Separately Priced
Data in Support of Annex 2 Data Item Number AC01
Exhibit: AC
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2016 30 SEP 2017
Proposed Period of Performance
A TBD 1 LO
Base Year - Labor - Annex 3
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Estimated Total Price
1 LO
Labor in Support of Annex 3 Engineering and Technical Support Services for Annex 3 UTTR (IAW the PWS, Annex Specific PWS, and TDD) THE AWARD FEE SHALL BE NO LESS THAN 4% OF THE ESTIMATED TOTAL LABOR COSTS. THE AWARD
FEE ASSOCIATED WITH THIS LABOR CLIN SHALL BE PROPOSED AT CLIN 0034
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2016 30 SEP 2017
Proposed Period of
Base Year - Material - Annex 3
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Material in Support of Annex 3 Material for Annex 3 UTTR (IAW the PWS, Annex Specific PWS, and TDD)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2016 30 SEP 2017
Proposed Period of Performance
A TBD 1 LO
Base Year - Travel - Annex 3
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Travel in Support of Annex 3 Travel for AFTC Annex 3 UTTR (IAW the PWS, Annex Specific PWS, and TDD)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of
A TBD 1 LO 1 OCT 2016 30 SEP 2017
Proposed Period of Performance
A TBD 1 LO
Base Year - Award Fee - Annex 3
Item No.
Cost Plus Award Fee Quantity U/I Award Fee
1 EA
Award Fee in Support of Annex 3 Award Fee for Annex 3 UTTR THE AWARD FEE SHALL BE NO LESS THAN 4% OF THE ESTIMATED TOTAL LABOR COSTS (CLIN 0031)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 EA 1 OCT 2016 30 SEP 2017
Proposed Period of Performance
A TBD 1 EA
Award Fee Period Award Fee Available Award Fee Earned
1 Oct - 30 Mar $_________________ $_________________
1 Apr - 30 Sep $_________________ $_________________
Award Fee is earned on a six-month basis. The Contractor is to divide the Award Fee amount for this CLIN into two equal amounts (rounded to the nearest dollar) . One of the two amounts will be included in the 1 Oct - 31 Mar Award Fee Pool and the other will be included in the 1 Apr - 30 Sep Award Fee Pool. The Award Fee Earned will be the Award Fee Available multiplied by the Award Fee Score.
Unearned Award Fee shall not carry from one Award Fee Period to another.
Example: Award Fee Available = $1,000,000 Award Fee Score = 90 percent
Base Year - Data - Annex 3
Firm Fixed Price Quantity U/I Unit Price Amount
EA Not Separately Priced Not Separately Priced
Data in Support of Annex 3 Data Item Numbers AD01 - AD02 Exhibit: AD
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 EA 1 OCT 2016 30 SEP 2017
Proposed Period of Performance
A TBD 1 EA
Base Year - Labor - Annex 4
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Estimated Total Price
1 LO
Labor in Support of Annex 4 Engineering and Technical Support Services for Annex 4 NAWCWD (IAW the PWS, Annex Specific PWS, and TDD) THE AWARD FEE SHALL BE NO LESS THAN 4% OF THE ESTIMATED TOTAL LABOR COSTS. THE AWARD
FEE ASSOCIATED WITH THIS LABOR CLIN SHALL BE PROPOSED AT CLIN 0044
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination
Required Period of Performance
A TBD 1 LO 1 OCT 2016 30 SEP 2017
Proposed Period of
Base Year - Material - Annex 4
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Material in Support of Annex 4 Material for AFTC Annex 4 NAWCWD (IAW the PWS, Annex Specific PWS, and TDD)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2016 30 SEP 2017
Proposed Period of Performance
A TBD 1 LO
Base Year - Travel - Annex 4
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Travel in Support of Annex 4 Travel for AFTC Annex 4 NAWCWD (IAW the PWS, Annex Specific PWS, and TDD)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2016 30 SEP 2017
Proposed Period of Performance
A TBD 1 LO
Base Year - Award Fee - Annex 4
Item No.
Cost Plus Award Fee Quantity U/I Award Fee
1 LO
Award Fee in Support of Annex 4 Award Fee for AFTC Annex 4 NAWCWD THE AWARD FEE SHALL BE NO LESS THAN 4% OF THE ESTIMATED TOTAL LABOR COSTS (CLIN 0041)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2016 30 SEP 2017
Proposed Period of Performance
A TBD 1 LO
Award Fee Period Award Fee Available Award Fee Earned
1 Oct - 30 Mar $_________________ $_________________
1 Apr - 30 Sep $_________________ $_________________
Award Fee is earned on a six-month basis. The Contractor is to divide the Award Fee amount for this CLIN into two equal amounts (rounded to the nearest dollar) . One of the two amounts will be included in the 1 Oct - 31 Mar Award Fee Pool and the other will be included in the 1 Apr - 30 Sep Award Fee Pool. The Award Fee Earned will be the Award Fee Available multiplied by the Award Fee Score.
Unearned Award Fee shall not carry from one Award Fee Period to another.
Example: Award Fee Available = $1,000,000 Award Fee Score = 90 percent
Base Year - Data - Annex 4
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced
Data in Support of Annex 4 Data Item Numbers AE01 - AE09 Exhibit: AE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2016 30 SEP 2017
Proposed Period of Performance
A TBD 1 LO
Option Year 1 - Data - J-Tech II Enterprise Level -
Item No.
Firm Fixed Price
1 LO Not Separately Priced Not Separately Priced
Option Year 1 - Data - J-Tech II Enterprise Level -
Data in Support of the J-Tech II Enterprise-level PWS Data Item Numbers BA01 - BA08 Exhibit: BA
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2017 30 SEP 2018
Proposed Period of Performance
A TBD 1 LO
Option Year 1 - Labor - Annex 1
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Estimated Total Price
1 LO
Labor in Support of Annex 1 Engineering and Technical Support Services for Annex 1 412 TW (IAW the PWS, Annex Specific PWS, and TDD) THE AWARD FEE SHALL BE NO LESS THAN 4% OF THE ESTIMATED TOTAL LABOR COSTS. THE AWARD FEE
ASSOCIATED WITH THIS LABOR CLIN SHALL BE PROPOSED AT CLIN 0114
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2017 30 SEP 2018
Proposed Period of
Option Year 1 - Material - Annex 1
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Material in Support of Annex 1 Material for AFTC Annex 1 412 TW (IAW the PWS, Annex Specific PWS, and TDD)
Priority: 4B
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2017 30 SEP 2018
Proposed Period of Performance
A TBD 1 LO
Option Year 1 - Travel - Annex 1
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Travel in Support of Annex 1 Travel for AFTC Annex 1 412 TW (IAW the PWS, Annex Specific PWS, and TDD)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2017 30 SEP 2018
Proposed
A TBD 1 LO
Option Year 1 - Award Fee - Annex 1
Item No.
Cost Plus Award Fee Quantity U/I Award Fee
1 LO
Award Fee in Support of Annex 1 Award Fee for Annex 1 412 TW THE AWARD FEE SHALL BE NO LESS THAN 4% OF THE ESTIMATED TOTAL LABOR COSTS (CLIN 0111)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2017 30 SEP 2018
Proposed Period of Performance
A TBD 1 LO
Award Fee Period Award Fee Available Award Fee Earned
1 Oct - 30 Mar $_________________ $_________________
1 Apr - 30 Sep $_________________ $_________________
Award Fee is earned on a six-month basis. The Contractor is to divide the Award Fee amount for this CLIN into two equal amounts (rounded to the nearest dollar) . One of the two amounts will be included in the 1 Oct - 31 Mar Award Fee Pool and the other will be included in the 1 Apr - 30 Sep Award Fee Pool. The Award Fee Earned will be the Award Fee Available multiplied by the Award Fee Score.
Unearned Award Fee shall not carry from one Award Fee Period to another.
Example: Award Fee Available = $1,000,000 Award Fee Score = 90 percent
Option Year 1 - Data - Annex 1
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
Data in Support of Annex 1 Data Item Number BB01 Exhibit:: BB
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2017 30 SEP 2018
Proposed Period of Performance
A TBD 1 LO
Option Year 1 - Labor - Annex 2
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Estimated Total Price
1 LO
Labor in Support of Annex 2 Engineering and Technical Support Services for Annex 2 NTTR (IAW the PWS, Annex Specific PWS, and TDD).
THE AWARD FEE SHALL BE NO LESS THAN 4% OF THE ESTIMATED TOTAL LABOR COSTS. THE AWARD FEE
ASSOCIATED WITH THIS LABOR CLIN SHALL BE PROPOSED AT CLIN 0124
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required
A TBD 1 LO 1 OCT 2017 30 SEP 2018
Proposed Period of Performance
A TBD 1 LO
Option Year 1 - Material - Annex 2
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Material in Support of Annex 2 Material for Annex 2 NTTR (IAW the PWS, Annex Specific PWS, and TDD).
Priority: 4B
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2017 30 SEP 2018
Proposed Period of Performance
A TBD 1 LO
Option Year 1 - Travel - Annex 2
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Travel in Support of Annex 2 Travel for Annex 2 NTTR (IAW the PWS, Annex Specific PWS, and TDD).
Limitations of Liability: Other Than High Value Item
Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2017 30 SEP 2018
Proposed Period of Performance
A TBD 1 LO
Option Year 1 - Award Fee - Annex 2
Item No.
Cost Plus Award Fee Quantity U/I Award Fee
1 LO
Award Fee in Support of Annex 2 Award Fee for Annex 2 NTTR THE AWARD FEE SHALL BE NO LESS THAN 4% OF THE ESTIMATED TOTAL LABOR COSTS (CLIN 0121)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2017 30 SEP 2018
Proposed Period of Performance
A TBD 1 LO
Award Fee Period Award Fee Available Award Fee Earned
1 Oct - 30 Mar $_________________ $_________________
1 Apr - 30 Sep $_________________ $_________________
Award Fee is earned on a six-month basis. The Contractor is to divide the Award Fee amount for this CLIN into two equal amounts (rounded to the nearest dollar) . One of the two amounts will be included in the 1 Oct - 31 Mar Award Fee Pool and the other will be included in the 1 Apr - 30 Sep Award
Fee Pool. The Award Fee Earned will be the Award Fee Available multiplied by the Award Fee Score.
Unearned Award Fee shall not carry from one Award Fee Period to another.
Example: Award Fee Available = $1,000,000 Award Fee Score = 90 percent
Option Year 1 - Data - Annex 2
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
Data in Support of Annex 2 Data Item Numbers BC01 Exhibit: BC
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2017 30 SEP 2018
Proposed Period of Performance
A TBD 1 LO
Option Year 1 - Labor - Annex 3
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Estimated Total Price
1 LO
Labor in Support of Annex 3 Engineering and Technical Support Services for Annex 3 UTTR (IAW the PWS, Annex Specific PWS, and TDD) THE AWARD FEE SHALL BE NO LESS THAN 4% OF THE ESTIMATED TOTAL LABOR COSTS. THE AWARD FEE
ASSOCIATED WITH THIS LABOR CLIN SHALL BE PROPOSED AT CLIN 0134
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2017 30 SEP 2018
Proposed Period of
Option Year 1 - Material - Annex 3
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Material in Support of Annex 3 Material for Annex 3 UTTR (IAW the PWS, Annex Specific PWS, and TDD)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2017 30 SEP 2018
Proposed Period of Performance
A TBD 1 LO
Option Year 1 - Travel - Annex 3
Item No.
Cost Reimbursement - No Fee
Option Year 1 - Travel - Annex 3
Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Travel in Support of Annex 3 Travel for Annex 3 UTTR (IAW the PWS, Annex Specific PWS, and TDD)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2017 30 SEP 2018
Proposed Period of Performance
A TBD 1 LO
Option Year 1 - Award Fee - Annex 3
Item No.
Cost Plus Award Fee Quantity U/I Award Fee
1 LO
Award Fee in Support of Annex 3 Award Fee for Annex 3 UTTR THE AWARD FEE SHALL BE NO LESS THAN 4% OF THE ESTIMATED TOTAL LABOR COSTS (CLIN 0131)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2017 30 SEP 2018
Proposed Period of
Award Fee Period Award Fee Available Award Fee Earned
1 Oct - 30 Mar $_________________ $_________________
1 Apr - 30 Sep $_________________ $_________________
Award Fee is earned on a six-month basis. The Contractor is to divide the Award Fee amount for this CLIN into two equal amounts (rounded to the nearest dollar) . One of the two amounts will be included in the 1 Oct - 31 Mar Award Fee Pool and the other will be included in the 1 Apr - 30 Sep Award Fee Pool. The Award Fee Earned will be the Award Fee Available multiplied by the Award Fee Score.
Unearned Award Fee shall not carry from one Award Fee Period to another.
Example: Award Fee Available = $1,000,000 Award Fee Score = 90 percent
Option Year 1 - Data - Annex 3
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
Data in Support of Annex 3 Data Item Numbers BD01 - BD02 Exhibit: BD
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2017 30 SEP 2018
Proposed Period of
Option Year 1 - Labor - Annex 4
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Estimated Total Price
1 LO
Labor in Support of Annex 4 Engineering and Technical Support Services for Annex 4 NAWCWD (IAW the PWS, Annex Specific PWS, and TDD) THE AWARD FEE SHALL BE NO LESS THAN 4% OF THE ESTIMATED TOTAL LABOR COSTS. THE AWARD FEE
ASSOCIATED WITH THIS LABOR CLIN SHALL BE PROPOSED AT CLIN 0144
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2017 30 SEP 2018
Proposed Period of
Option Year 1 - Material - Annex 4
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Material in Support of Annex 4 Material for Annex 4 NAWCWD (IAW the PWS, Annex Specific PWS, and TDD)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required
A TBD 1 LO 1 OCT 2017 30 SEP 2018
Proposed Period of Performance
A TBD 1 LO
Option Year 1 - Travel - Annex 4
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Travel in Support of Annex 4 Travel for Annex 4 NAWCWD (IAW the PWS, Annex Specific PWS, and TDD)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2017 30 SEP 2018
Proposed Period of Performance
A TBD 1 LO
Option Year 1 - Award Fee - Annex 4
Item No.
Cost Plus Award Fee Quantity U/I Award Fee
1 LO
Award Fee in Support of Annex 4 Award Fee for Annex 4 NAWCWD THE AWARD FEE SHALL BE NO LESS THAN 4% OF THE ESTIMATED TOTAL LABOR COSTS (CLIN 0141)
Limitations of Liability: Other Than High Value Item
Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2017 30 SEP 2018
Proposed Period of Performance
A TBD 1 LO
Award Fee Period Award Fee Available Award Fee Earned
1 Oct - 30 Mar $_________________ $_________________
1 Apr - 30 Sep $_________________ $_________________
Award Fee is earned on a six-month basis. The Contractor is to divide the Award Fee amount for this CLIN into two equal amounts (rounded to the nearest dollar) . One of the two amounts will be included in the 1 Oct - 31 Mar Award Fee Pool and the other will be included in the 1 Apr - 30 Sep Award Fee Pool. The Award Fee Earned will be the Award Fee Available multiplied by the Award Fee Score.
Unearned Award Fee shall not carry from one Award Fee Period to another.
Example: Award Fee Available = $1,000,000 Award Fee Score = 90 percent
Option Year 1 - Data - Annex 4
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
Data in Support of Annex 4 Data Item Numbers BE01 - BE09 Exhibit: BE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination
Required Period of Performance
A TBD 1 LO 1 OCT 2017 30 SEP 2018
Proposed Period of Performance
A TBD 1 LO
Option Year 2 - Data - J-Tech II Enterprise Level
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
Data in Support of the J-Tech II Enterprise-level PWS Data Item Numbers CA01 - CA08 Exhibit: CA
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2018 30 SEP 2019
Proposed Period of Performance
A TBD 1 LO
Option Year 2 - Labor - Annex 1
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Estimated Total Price
1 LO
Labor in Support of Annex 1 Engineering and Technical Support Services for Annex 1 412 TW (IAW the PWS, Annex Specific PWS, and TDD) THE AWARD FEE SHALL BE NO LESS THAN 4% OF THE ESTIMATED TOTAL LABOR COSTS. THE AWARD FEE
ASSOCIATED WITH THIS LABOR CLIN SHALL BE PROPOSED AT CLIN 0214
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2018 30 SEP 2019
Proposed Period of
Option Year 2 - Material - Annex 1
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Material in Support of Annex 1 Material for Annex 1 412 TW (IAW the PWS, Annex Specific PWS, and TDD)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2018 30 SEP 2019
Proposed Period of Performance
A TBD 1 LO
Option Year 2 - Travel - Annex 1
Item No.
Option Year 2 - Travel - Annex 1
Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Travel in Support of Annex 1 Travel for Annex 1 412 TW (IAW the PWS, Annex Specific PWS, and TDD)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2018 30 SEP 2019
Proposed Period of Performance
A TBD 1 LO
Option Year 2 - Award Fee - Annex 1
Item No.
Cost Plus Award Fee Quantity U/I Award Fee
1 LO
Award Fee in Support of Annex 1 Award Fee for Annex 1 412 TW THE AWARD FEE SHALL BE NO LESS THAN 4% OF THE ESTIMATED TOTAL LABOR COSTS (CLIN 0211)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2018 30 SEP 2019
Proposed Period of
Award Fee Period Award Fee Available Award Fee Earned
1 Oct - 30 Mar $_________________ $_________________
1 Apr - 30 Sep $_________________ $_________________
Award Fee is earned on a six-month basis. The Contractor is to divide the Award Fee amount for this CLIN into two equal amounts (rounded to the nearest dollar) . One of the two amounts will be included in the 1 Oct - 31 Mar Award Fee Pool and the other will be included in the 1 Apr - 30 Sep Award Fee Pool. The Award Fee Earned will be the Award Fee Available multiplied by the Award Fee Score.
Unearned Award Fee shall not carry from one Award Fee Period to another.
Example: Award Fee Available = $1,000,000 Award Fee Score = 90 percent
Option Year 2 - Data - Annex 1
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
Data in Support of Annex 1 Data Item Number CB01 Exhibit: CB
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2018 30 SEP 2019
Proposed Period of
Option Year 2 - Labor - Annex 2
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Estimated Total Price
1 LO
Labor in Support of Annex 2 Engineering and Technical Support Services for Annex 2 NTTR (IAW the PWS, Annex Specific PWS, and TDD).
THE AWARD FEE SHALL BE NO LESS THAN 4% OF THE ESTIMATED TOTAL LABOR COSTS. THE AWARD FEE
ASSOCIATED WITH THIS LABOR CLIN SHALL BE PROPOSED AT CLIN 0224
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2018 30 SEP 2019
Proposed Period of
Option Year 2 - Material - Annex 2
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Material in Support of Annex 2 Material for Annex 2 NTTR (IAW the PWS, Annex Specific PWS, and TDD).
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required
A TBD 1 LO 1 OCT 2018 30 SEP 2019
Proposed Period of Performance
A TBD 1 LO
Option Year 2 - Travel - Annex 2
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Travel in Support of Annex 2 Travel for Annex 2 NTTR (IAW the PWS, Annex Specific PWS, and TDD).
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2018 30 SEP 2019
Proposed Period of Performance
A TBD 1 LO
Option Year 2 - Award Fee - Annex 2
Item No.
Cost Plus Award Fee Quantity U/I Award Fee
1 LO
Award Fee in Support of Annex 2 Award Fee for the Annex 2 NTTR THE AWARD FEE SHALL BE NO LESS THAN 4% OF THE ESTIMATED TOTAL LABOR COSTS (CLIN 0221)
Limitations of Liability: Other Than High Value Item
Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2018 30 SEP 2019
Proposed Period of Performance
A TBD 1 LO
Award Fee Period Award Fee Available Award Fee Earned
1 Oct - 30 Mar $_________________ $_________________
1 Apr - 30 Sep $_________________ $_________________
Award Fee is earned on a six-month basis. The Contractor is to divide the Award Fee amount for this CLIN into two equal amounts (rounded to the nearest dollar) . One of the two amounts will be included in the 1 Oct - 31 Mar Award Fee Pool and the other will be included in the 1 Apr - 30 Sep Award Fee Pool. The Award Fee Earned will be the Award Fee Available multiplied by the Award Fee Score.
Unearned Award Fee shall not carry from one Award Fee Period to another.
Example: Award Fee Available = $1,000,000 Award Fee Score = 90 percent
Option Year 2 - Data - Annex 2
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
Data in Support of Annex 2 Data Item Number CC01
Exhibit: CC
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination
Required Period of Performance
A TBD 1 LO 1 OCT 2018 30 SEP 2019
Proposed Period of Performance
A TBD 1 LO
Option Year 2 - Labor - Annex 3
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Estimated Total Price
1 LO
Labor in Support of Annex 3 Engineering and Technical Support Services for Annex 3 UTTR (IAW the PWS, Annex Specific PWS, and TDD) THE AWARD FEE SHALL BE NO LESS THAN 4% OF THE ESTIMATED TOTAL LABOR COSTS. THE AWARD FEE
ASSOCIATED WITH THIS LABOR CLIN SHALL BE PROPOSED AT CLIN 0234
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2018 30 SEP 2019
Proposed Period of Performance
A TBD 1 LO
Option Year 2 - Material - Annex 3
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Material in Support of Annex 3 Material for Annex 3 UTTR (IAW the PWS, Annex Specific PWS, and TDD)
Priority: 4B
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2018 30 SEP 2019
Proposed Period of Performance
A TBD 1 LO
Option Year 2 - Travel - Annex 2
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Travel in Support of Annex 3 Travel for Annex 3 UTTR (IAW the PWS, Annex Specific PWS, and TDD)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2018 30 SEP 2019
Proposed Period of Performance
A TBD 1 LO
Option Year 2 - Award Fee - Annex 3
Item No.
Cost Plus Award Fee Quantity U/I Award Fee
1 LO
Option Year 2 - Award Fee - Annex 3
Award Fee in Support of Annex 3 Award Fee for Annex 3 UTTR THE AWARD FEE SHALL BE NO LESS THAN 4% OF THE ESTIMATED TOTAL LABOR COSTS (CLIN 0231)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2018 30 SEP 2019
Proposed Period of Performance
A TBD 1 LO
Award Fee Period Award Fee Available Award Fee Earned
1 Oct - 30 Mar $_________________ $_________________
1 Apr - 30 Sep $_________________ $_________________
Award Fee is earned on a six-month basis. The Contractor is to divide the Award Fee amount for this CLIN into two equal amounts (rounded to the nearest dollar) . One of the two amounts will be included in the 1 Oct - 31 Mar Award Fee Pool and the other will be included in the 1 Apr - 30 Sep Award Fee Pool. The Award Fee Earned will be the Award Fee Available multiplied by the Award Fee Score.
Unearned Award Fee shall not carry from one Award Fee Period to another.
Example: Award Fee Available = $1,000,000 Award Fee Score = 90 percent
Option Year 2 - Data - Annex 3
Firm Fixed Price
1 LO Not Separately Priced Not Separately Priced
Option Year 2 - Data - Annex 3
Data in Support of Annex 3 Data Item Numbers CD01 - CD02 Exhibit: CD
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2018 30 SEP 2019
Proposed Period of Performance
A TBD 1 LO
Option Year 2 - Labor - Annex 4
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Estimated Total Price
1 LO
Labor in Support of Annex 4 Engineering and Technical Support Services for Annex 4 NAWCWD (IAW the PWS, Annex Specific PWS, and TDD) THE AWARD FEE SHALL BE NO LESS THAN 4% OF THE ESTIMATED TOTAL LABOR COSTS. THE AWARD FEE
ASSOCIATED WITH THIS LABOR CLIN SHALL BE PROPOSED AT CLIN 0244
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2018 30 SEP 2019
Proposed Period of
Option Year 2 - Material - Annex 4
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Material in Support of Annex 4 Material for Annex 4 NAWCWD (IAW the PWS, Annex Specific PWS, and TDD)
Priority: 4B
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2018 30 SEP 2019
Proposed Period of Performance
A TBD 1 LO
Option Year 2 - Travel - Annex 4
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Travel in Support of Annex 4 Travel for Annex 4 NAWCWD (IAW the PWS, Annex Specific PWS, and TDD)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2018 30 SEP 2019
Proposed
A TBD 1 LO
Option Year 2 - Award Fee - Annex 4
Item No.
Cost Plus Award Fee Quantity U/I Award Fee
1 LO
Award Fee in Support of Annex 4 Award Fee for Annex 4 NAWCWD THE AWARD FEE SHALL BE NO LESS THAN 4% OF THE ESTIMATED TOTAL LABOR COSTS (CLIN 0241)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2018 30 SEP 2019
Proposed Period of Performance
A TBD 1 LO
Award Fee Period Award Fee Available Award Fee Earned
1 Oct - 30 Mar $_________________ $_________________
1 Apr - 30 Sep $_________________ $_________________
Award Fee is earned on a six-month basis. The Contractor is to divide the Award Fee amount for this CLIN into two equal amounts (rounded to the nearest dollar) . One of the two amounts will be included in the 1 Oct - 31 Mar Award Fee Pool and the other will be included in the 1 Apr - 30 Sep Award Fee Pool. The Award Fee Earned will be the Award Fee Available multiplied by the Award Fee Score.
Unearned Award Fee shall not carry from one Award Fee Period to another.
Example: Award Fee Available = $1,000,000 Award Fee Score = 90 percent
Option Year 2 - Data - Annex 4
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
Data in Support of Annex 4 Data Item Numbers CE01 - CE09 Exhibit: CE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
A TBD 1 LO 1 OCT 2018 30 SEP 2019
Proposed Period of Performance
A TBD 1 LO
Option Year 3 - Data - J-Tech II Enterprise Level
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced
Data in Support of the J-Tech II Enterprise-level PWS Data Item Numbers DA01 - DA08 Exhibit: DA
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of
A TBD 1 LO 1 OCT 2019 30 SEP 2020
Proposed Period of Performance
A TBD 1…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .