Attachment_16_-_PWS_Attachment_6_-_Unclassified_OCONUS_Engine_Runs.pdf

PDF 227 KB Posted

Attached to
USAFE F16 DEPOT Federal contract opportunity
Solicitation number
FA823220R0002
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document contains a Performance Work Statement (PWS) and information regarding a forthcoming solicitation for US Air Force F-16 depot support services. The PWS outlines procedures for contractor performance of unclassified engine runs and maintenance on USAF aircraft located at overseas depots. Key details include:

  • The contractor shall remove specified classified equipment from aircraft and perform unclassified engine motoring and runs according to safety procedures. Removed equipment will be reinstalled by USAF prior to flight.

  • Core defined depot work includes aircraft painting, non-destructive inspections, and radar absorbing material repairs. Programmed work covers major modifications and repairs such as longeron replacement, bulkhead repairs, wing work, and avionic upgrades. Additional unplanned maintenance will also be supported.

  • Solicitation FA8232-20-R-0002 will be issued for a 5-year IDIQ contract valued at $250 million to provide depot services for USAFE F-16s and other aircraft at a contractor facility within the competition circle, as well as contractor field team support worldwide excluding combat zones. Foreign participation is allowed. Questions should be directed to the specified contracting officers.

View the file

Other files for this federal contract opportunity

Other files attached to USAFE F16 DEPOT, newest first.
File Type Posted
Amendment 5 Question set 9.pdf PDF
Amendment_5_Question_and_Answer_Set_8_USAFE.pdf PDF
Amendment 5 Question and Answer Set 7.docx DOCX document
Amendment 5 Attachment_1_USAFE_Pricing_Table_2_Apr_20.xlsx XLSX spreadsheet
Amendment_4_Attachment_2_-_PWS_USAFE_F-16_Depot_31_Mar_20.pdf PDF
Amendment_4_Attachment_1_USAFE_Pricing_Table_31_Mar_20.xlsx XLSX spreadsheet
Amendment_4_Question and Answer Set 6 Amendment 4.pdf PDF
Amendment_4_Attachment_4_USAFE_Section_L_31_Mar_20.pdf PDF
Amendment_3_CLIN_0074_0075_stock_number_prices_19_March_20.xlsx XLSX spreadsheet
Amendment_3_Attachment_6_Attachment_L-1_past_performance_information.pdf PDF
Amendment_3_FA823220R0002_______0003.pdf PDF
Amendment_3_Attachment_2_-_PWS_USAFE_F-16_Depot_18_Mar_20.pdf PDF
Amendment_3_Attachment_17_-_GFP_17_Mar_20.pdf PDF
Amendment_3_Attachment_11_-_PWS_Attachment_1_-_USAFE_USG_Provided_Materials_17_Mar_20.xlsx XLSX spreadsheet
Amendment_3_Attachment_1_USAFE_Pricing_Table_17_Mar_20.pdf PDF
Amendment_2_Question_set_4_USAFE_9_March_20.pdf PDF
FA823220R0002_______0002.pdf PDF
Attachment_1_USAFE_Pricing_Table_6_Mar_20.pdf PDF
Attachment_17_-_GFP_6_Mar_20.pdf PDF
Attachment_11_-_PWS_Attachment_1_-_USAFE_USG_Provided_Materials_6_Mar_20.pdf PDF
Attachment_11_-_PWS_Attachment_1_-_USAFE_USG_Provided_Materials_6_Mar_20.xlsx XLSX spreadsheet
Attachment_1_USAFE_Pricing_Table_6_Mar_20.xlsx XLSX spreadsheet
Amendment_1_Question_set_3_USAFE_6_Mar_20.docx DOCX document
Amendment_1_Question Set 2 - 27_Feb_20 USAFE.pdf PDF
Amendment_1_Attachment_1_-_USAFE_Pricing_Table_19_Feb_20.xlsx XLSX spreadsheet
Amendment_1_Attachment_5_USAFE_Section_M_19_Feb_20.pdf PDF
Amendment_1_FA823220R0002_______0001_20_Feb_20.pdf PDF
Amendment_1_Attachment_2_-_PWS_USAFE_F-16_Depot_19_Feb_20.pdf PDF
Amendment_1_Question Set 1 - USAFE_19_Feb_20.pdf PDF
Amendment_1_Attachment_1_-_USAFE_Pricing_Table_19_Feb_20.pdf PDF
Attachment_7_-_Attachment_L-2_-_Cover_Letter_Template.pdf PDF
Attachment_15_-_PWS_Attachment_5_-_Contractor_Provided_Tooling.xlsx XLSX spreadsheet
Attachment_13_-_PWS_Attachment_3_-_SLEP_Tool_Replacement_List.xlsx XLSX spreadsheet
Attachment_9_-_Attachment_L-4_-_Client_Authorization_Letter_sample.pdf PDF
Attachment_8_-_Attachment_L-3_-_Sample_Consent_Letter.pdf PDF
Attachment_4_USAFE_Section_L_24_Jan_20.pdf PDF
Attachment_14_-_PWS_Attachment_4_-_Required_Wing_Tooling.xlsx XLSX spreadsheet
Attachment_6_-_Attachment_L-1_-_Past_Performance_Information_Sheet.pdf PDF
Attachment_1_-_USAFE_Pricing_Table.xlsx XLSX spreadsheet
Attachment_10_-_Attachment_L-5_-_Past_Performance_Questionnaire.pdf PDF
FA823220R0002.pdf PDF
Attachment_12_-_PWS_Attachment_2_-_Additional_SLEP_Modification_Tooling.pdf PDF
Attachment_3a_USAFE_CDRLs.pdf PDF
Attachment_2_-_PWS_USAFE_F-16_Depot.pdf PDF
Attachment_5_USAFE_Section_M_24_Jan_20.pdf PDF
Attachment_11_-_PWS_Attachment_1_-_USAFE_USG_Provided_Materials.xlsx XLSX spreadsheet
Attachment_17_-_GFP.pdf PDF
Attachment_3b_USAFE_CDRLs_Option_CLINs.pdf PDF
FA823220R002_Synopsis.docx DOCX document
Attachment_1.docx DOCX document
Show all 50

USAFE F16 DEPOT has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PWS Attachment 6 – Unclassified OCONUS Engine Runs

Purpose: In order to maintain paint, repair and modification schedule for USAF Bk 40/50 aircraft undergoing maintenance at OCONUS depots, and to reduce the cost and maintenance burden for USAF personnel to travel to perform preliminary F-110-GE-100/-129 engine runs, the Contractor shall perform unclassified engine motoring and runs in accordance with the following aircraft configuration and process. This process meets the intent of the F-16 System Safety evaluation titled ‘Hazard Risk Assessment of Engine Run With Equipment Removed”, dated 24 April 2012.

Aircraft Configuration:

1. The following items will be removed and properly stored by USAF personnel prior to aircraft induction into an OCONUS depot. All listed items will be removed for motoring or engine runs performed by the contractor and shall be installed and operationally checked by USAF personnel prior to Functional Check Flight or first flight.

2. The equipment list below is removed at owning unit before an aircraft is inducted into the OCONUS depot. Engine run and FCF will be performed without listed equipment. After delivery to the owning unit, all listed classified items installation and follow-on operational checkouts will be performed by unit personnel at owning unit facility.

KY-58 (Secure Voice Processor) CCU (Cockpit Control Unit)

ALE-47 CHAFF/FLARE PROGRAMMER

ECM Panel (Electronic Counter Measures Panel, 9921CT1)

SUPERHETERODYNE RECEIVER (SHR)

SUPERHETERODYNE CONTROLLER (SHC)

AP: ANALYSIS PROCESSOR (9911A6)

ALR-56M/ALR-69: C/D BAND RECEIVER POWER SUPPLY

AFT DF RECEIVER (R/H 9911A8, L/H 9911A7)

RIGHT STRAKE DF RECEIVER(9911A1)

LEFT STRAKE DF RECEIVER(9911A2)

KIV-6 MODE 4 COMPUTER

AN/ALQ-131,184,188 POD

AN/ALE-50

AN/ALE-50 TOWED DECOY

KIT-1C

MIDS LVT (The Multifunction Information Distribution System Low Volume Terminal)

MMC (MODULAR MISSION COMPUTER)

APSP (Advanced Programmable Signal Processor)/PSP ARC-210 (UHF/VHF Radio, 2325A1) EGI (Embedded GPS/INS) PDG/CPDG (Color) Programmable Display Generator

CIT/KIV-77/78

PWS Attachment 6 – Unclassified OCONUS Engine Runs

Engine Motor/Run Process:

1. Aircraft preparation prior to engine run and/or tow:

a. The following process will be implemented as safety/securing for all removed items.

i. Each connector, harness and air duct shall be protected by covering with a plastic bag or plastic shipping cap.

ii. All connectors/harnesses will be attached to the nearest primary support or to the main wire harness bundle using lacing.

iii. All corresponding doors shall be closed.

b. Aircraft Center of Gravity limits shall be verified per 1F-16()-5-2 for weight and balance and aircraft shall not be towed with less than 1000 pounds of weight on the nose landing gear.

c. Glare Shield Warning Lights (e.g., HYD/OIL PRESS, ENGINE, ENG FIRE) and Caution Lights (e.g., SEC, FUEL/OIL HOT, FWD and AFT FUEL LOW) shall be checked for proper operation per JG33-00-05 (CAUTION, WARNING, AND

ADVISORY LIGHTS, OPERATIONAL CHECKOUT)

d. Main Fuel Shutoff Valve shall be checked prior to engine run for proper operation to ensure control from the cockpit is available.

e. The intercom and the COMM 1 control installed in the cockpit will be checked for proper operation per JG23-20-01 (UHF RADIO operational checkout) and JG23-40- 01 (Interphone system operational checkout).

2. Engine motor/run procedure:

a. All procedures listed in TO 1F-16CG-2-70JG-00-11 and TO 1F-16CJ-2-70JG-00-1 shall be complied with fully.

b. Fuel Flow, RPM, FTIT, Oil Pressure, Nozzle Position, and Hydraulic Pressure indicators shall be checked for proper function and availability during engine operation.

c. Engine operation shall only be conducted by properly trained and certified Contractor technicians or USAF personnel.

d. Equipment and facilities used for engine operation shall be approved and certified for use, as necessary, by DCMA prior to use.

e. Emergency services will be available, as necessary.

Follow-on Maintenance

1. All non-classified follow-on maintenance checks will be performed by the Contractor.

2. All classified equipment installations and follow-on maintenance checks will be performed by

USAF personnel with the exception of the following operations (these non-Safety of Flight items will be carried forward in the aircraft maintenance records):

• FUNCTIONAL CHECKOUT OF AIM-9 (OR LAU-129) MISSILE LAUNCHER

• CRASH SURVIVABLE FLIGHT DATA RECORDER BUILT IN TEST (BIT)

• CRASH SURVIVABLE FLIGHT DATA RECORDER OPERATIONAL FLIGHT

PROGRAM IDENTIFICATION CHECK

• RADAR THREAT WARNING SYSTEM OPERATIONAL CHECKOUT

3. A follow-on classified configuration engine run may be required by USAF personnel based on maintenance performed.

File details come from the government source that posted it. Updated .