AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 33 (REV. 9-97)

PREVIOUS EDITION NOT USABLE Prescribed by GSA – FAR (48 CFR) 53/214(c)

SOLICITATION, OFFER AND AWARD JSY

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15CFR 7900)

RATING

DO: A1

Page of Page

2. CONTRACT NO. 3. SOLICITATION NO.

FA8232-16-R-3030

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

7. ISSUED BY

DEPARTMENT OF THE AIR FORCE, DIRECTORATE OF CONTRACTING

AFLCMC WWMK

6072 FIR AVENUE BLDG 1233

HILL AIR FORCE BASE UT 84056-5820

BUYER: Eric A Dumpert/AFLCMC eric.dumpert.1@us.af.mil Phone: (801) 777- 5964 Fax: (000) 000-0000 No Collect Calls

FA8232 8. ADDRESS OFFER TO (If other than Item 7)

11. TABLE OF CONTENTS

(X) SEC. DESCRIPTON PAGE(S) (X) Sec. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE PART II - CONTRACT CLAUSES

X A SOLICITATION/CONTRACT FORM

X B SUPPLIES OR SERVICES AND

C DESCRIPTION/SPECS/WORK STATEMENT

D PACKAGING AND MARKING

X E INPECTION AND ACCEPTANCE

X F DELIVERIES OR PERFORMANCE

X G CONTRACT ADMINISTRATION DATA

H SPECIAL CONTRACT REQUIREMENTS

X I CONTRACT CLAUSES

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER

X J LIST OF ATTACHMENTS

X K REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

PART IV - REPRESENTATIONS AND INSTRUCTIONS

X L INSTRS., CONDS., AND NOTICES TO OFFERORS

X M EVALUATION AND FACTORS FOR AWARD

OFFER (Must be fully completed by offeror)

24. ADMINISTERED BY (If other than Item 7) SCD:B 25. PAYMENT WILL BE MADE BY CODE

(SEE ESP CLAUSE 252.232-7003.)

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

28. AWARD DATE

X

5. DATE ISSUED 6.REQUISITION/PURCHASE NO

F2DCCM6088B001

NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder”.

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if hand carried, in the depository located in until 2:00 (Hour) local time 8-AUG-2016 (Date).

CAUTION- LATE Submissions, Modifications, and Withdrawals: Section L, Provision No 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this section.

10. FOR INFORMATION

CALL:

A. NAME

Eric A Dumpert

B. TELEPHONE (NO COLLECT CALLS)

(801 ) 777 -5964

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within 120 calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT(See Section I, Clause No 52.232-8)

10 CALENDAR DAYS 20 CALENDAR DAYS 30 CALENDAR DAYS CALENDAR DAYS

14. ACKNOWLEDGEMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated:

AMENDMENT NO. DATE AMENDMENT NO. DATE

15A. NAME AND

ADDRESS OF

OFFEROR

CODE FACILITY

16. NAME AND TITLE OF PERSON

AUTHORIZED TO SIGN OFFER (Type or print)

15B. TELEPHONE NO.

(Include Area Code)

15C.CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE-ENTER

SUCH ADDRESS IN SCHEDULE.

17. SIGNATURE 18. OFFER DATE

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS 20. AMOUNT

$ 49,900,000.00

21. ACCOUNTING AND APPROPRIATION

SEE SCHEDULE

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN

COMPETITION

10 U.S.C. 2304 (c) ( ) 41 U.S.C. 253 (c)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

SOLICITATION

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

C. E-MAIL ADDRESS

eric.dumpert.1@us.af.mil

Request for Proposal FA8232-16-R-3030

PART I - THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.

The Ordering period will be from 1 November 2016 through 31 October 2020. There is 1 Option Ordering period from 1 November 2020 through 31 Oct 2021.

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

15 EA

J015 Pre-Induction with inspection and work request Pre-Induction, IAW PWS 1.13 to include removal and replacement of all aircraft nitrogen, liquid oxygen, fuel, and hydrazine.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

IUID Required: Yes Title Number Date Tailoring IAW PWS Sec 1.10.1

Physical Item Markings:

Period of Performance to be established on applicable order. All quantities are estimated. Pricing applicable for period of ordering (See pricing attachment).

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

15 EA

J015 Post-induction Services Post-maintenance (outgoing) servicing IAW PWS 1.15; to include replacement of all aircraft nitrogen, fuel, liquid oxygen, and hydrazine, inspection, cleaning, securing access plates/panels, weight and balance, ops checks, Engine runs, reinstalling extraneous equipment and functional check flights.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Item No.

Time & Material Estimated Quantity

U/I Estimated Amount Ceiling Price

2,000 HR

J015 Over And Above Per PWS 1.17 Over and Above, (O&A) including Surge, as Directed by the PCOFixed Composite or Loaded Rates as established.Tasks, labor hours and material to be established on orders issued hereunder.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

15 EA

J015 370-gal Ex Fuel Tank remove/install (Defuel/Storage/Reinstall) Removal, storage, and reinstallation of 370-gal external fuel tank equipment IAW PWS 1.13.1.6.2 and 1.15.4 to include after installation operational checks. Unit price per two tanks.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

IUID Required: Yes

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

15 EA

J015 300-gal Ex Fuel Tank remove/install (Defuel/Storage/Reinstall) Removal, storage, and reinstallation of 370-gal external fuel tank equipment IAW PWS 1.13.1.6.2 and 1.15.4 to include after installation operational checks. Unit price per two tanks.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

IUID Required: Yes

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

6 EA

J015 Strip where Have Glass (HG) II coating will apply, F-16C Full strip of Have Glass II coatings using plastic media blast (PMB) for C model F-16 aircraft as outlined in PWS 1.14.7

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

6 EA

J015 Strip where Poly coat will apply, F-16C Full strip of Poly coatings using plastic media blast (PMB) for C model F-16 aircraft as outlined in PWS 1.14.7

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

IUID Required: Yes

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

6 EA

J015 Strip where HG II coating will apply, F-16 D Full strip of HG II using plastic media blast (PMB) for D model F-16 aircraft as outlined in PWS 1.14.7

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

6 EA

J015 Strip where Poly coat will apply, F-16D Full strip of Poly coatings using plastic media blast (PMB) for D model F-16 aircraft as outlined in PWS 1.14.7

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

15 EA

J015 Full Paint, Ap HG II (Full Multi Spec (FMS) 3049/FMS 2026), F-16C Standard Paint application of FMS 3049 and 2026 on F-16C model aircraft IAW PWS 1.14.7

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Firm Fixed Price

Estimated Quantity

U/I Unit Price Amount

6 EA

J015 Full Paint, Apply Poly Coat paint, F-16C Standard Paint application of Poly paint on F-16C model aircraft IAW PWS 1.14.7

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

6 EA

J015 Full Paint, Ap HG II (Full Multi Spec (FMS) 3049/FMS 2026), F-16D Standard Paint application of FMS 3049 and 2026 on D model aircraft IAW PWS 1.14.7

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

6 EA

J015 Apply Poly Coat paint, F-16 D Standard Paint application of Poly paint on D model aircraft IAW PWS 1.14.7

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

6 EA

J015 Scuff Sand and Apply Full Multi Spectral (FMS) 2026 paint, F-16 C Scuff sand & paint of aircraft for C model F-16 aircraft using FMS 2026 paint as outlined in PWS 1.14.7

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

6 EA

J015 Scuff Sand and Apply Poly paint, F-16 C Scuff sand & paint of aircraft for C model F-16 aircraft using Poly paint as outlined in PWS 1.14.7

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

6 EA

J015 Scuff Sand and Apply Full Multi Spectral (FMS) 2026 paint, F-16 D Scuff sand & paint of aircraft for D model F-16 aircraft using FMS 2026 paint as outlined in PWS 1.14.7

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

6 EA

J015 Scuff Sand and Apply Poly paint, F-16 D Scuff sand & paint of aircraft for D model F-16 aircraft using Poly paint as outlined in PWS 1.14.7

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

12 EA

J015 370-gal External Fuel Tank PMB and Paint (HG II) See PWS reference 1.14.7, strip and repaint 370 gal fuel tanks as required utilizing HG II. Unit price is per tank.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

12 EA

J015 370-gal Ex Fuel Tank Surface Treat, PMB and Paint, Apply Poly Strip using Plastic Media Blast (PMB) and repaint 370-gal fuel tanks utilizing Poly paint IAW PWS 1.14.7. Unit price per two tanks.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

12 EA

J015 300-gal External Fuel Tank PMB and Paint (HG II) See PWS reference 1.14.7, strip (PMB) and repaint 300 gal fuel tanks as required utilizing HG II. Unit price is per tank.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

12 EA

J015 300-gal External Fuel Tank PMB and Paint (Poly Coat) See PWS reference 1.14.7, strip (PMB) and repaint 300 gal fuel tanks as required utilizing Poly Paint. Unit price is per tank.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

12 EA

J015 370-gal External Fuel Tank Scuff/Sand and Paint (HG II) See PWS reference 1.14.7, scuff/sand and repaint of 370 gal fuel tanks using HG II as required. Unit price is per tank.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

12 EA

J015 370-gal External Fuel Tank Scuff/Sand and Paint (Poly Coat) See PWS reference 1.14.7, scuff/sand and repaint of 370 gal fuel tanks using Poly Paint as required. Unit price is per tank

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

IAW Sec 1.10.1

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

12 EA

J015 300-gal External Fuel Tank Scuff/Sand and Paint (HG II) See PWS reference 1.14.7, scuff/sand and repaint of 300 gal fuel tanks using HG II as required. Unit price is per tank.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

12 EA

J015 300-gal External Fuel Tank Scuff/Sand and Paint (Poly Coat) See PWS reference 1.14.7, scuff/sand and repaint of 300 gal fuel tanks using Poly Paint as required. Unit price is per tank.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

5 EA

J015 Inlet RAM Strip and Paint (Document TCTO 2699 when complied ) Inlet Radar Absorbing Material (RAM) Strip and Paint IAW PWS par. 1.14.7.2

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

IUID Required: Yes

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

15 EA

J015 Upper Flange Inspection and Repair, Block 40 (TCTO 2741) Upper Flange Bulkhead inspection and repair on Block 40 aircraft, IAW PWS 1.14.16. Once complete, document accomplishment of TCTO 2741 in AFTO 781 series forms and provide inspection results to program office for input into CIRE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Firm Fixed Price Quantity U/I Unit Price Amount

4 EA

J015 Upper Flange Inspection and Repair, Block 50 (TCTO 2741) Upper Flange Bulkhead inspection and repair on Block 50 aircraft IAW PWS 1.14.16. Once complete, document accomplishment of TCTO 2741 in AFTO 781 series forms and provide inspection results to program office for input into CIRE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

IUID Required: Yes

Firm Fixed Price Quantity U/I Unit Price Amount

4 EA

J015 F-16 Wing Inspection/Repair F-16 Wing Inspection/Repair, including Upper/Lower Skin and Interior Wing Box -36 Inspection, Wing Box Cleaning, Fuel Cells Re-seal, and Faulty Component Replacement IAW PWS 1.14.12. and 1.14.12.1 Unit price is per wing

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

15 EA

J015 Upper Wing Skin Replacement Upper skin replacement IAW PWS 1.14.12. and 1.14.12.1 Unit price is per wing

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

4 EA

J015 Lower Wing Skin Replacement Lower skin replacement, IAW PWS 1.14.12. and 1.14.12.1 price is per wing

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

IUID Required: Yes

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

4 EA

J015 Wing Attach Fittings Replacement Wing attach fittings replacement IAW PWS 1.14.12. and 1.14.12.1 Unit price is per wing

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

4 EA

J015 Wing Removal & Reinstallation Perform wing removal and reinstallation IAW PWS 1.14.12. Unit price is per wing.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

4 EA

J015 Wing Replacement Perform wing replacement IAW PWS 1.14.12. Unit price is per wing.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

4 EA

J015 Canopy Sill Longeron Replace, F-16C, Both Sides (Left and Right) Both sides (Left and Right) Canopy Sill Longeron replacement on F-16C model aircraft IAW PWS 1.14.14.1

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

4 EA

J015 Canopy Sill Longeron Rep, F-16C, Left or Right, 16RB098 temp strp Left or Right side Canopy Sill Longeron temporary strap repair on F-16C model aircraft, IAW PWS 1.14.15

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

4 EA

J015 Canopy Sill Longeron Rep, F-16C, Left/Right, 16RB098 temp strp Both sides (Left and Right) Longeron temporary strap repair on F-16C model aircraft, IAW PWS 1.14.15

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

4 EA

J015 Canopy Sill Longeron Rep, F-16D Both Sides(2 sides/four lonerons)

Both sides (Left and Right), two-piece Longeron replacement on F-16D model aircraft IAW PWS 1.14.14.2

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

4 EA

J015 Canopy Sill Longeron Repair, F-16D, Left Side FS 161 Strap Repair Left side FS 161 Canopy Sill Longeron strap repair on F-16D Model aircraft, IAW PWS 1.14.15

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Firm Fixed Price Estimated Quantity

4 EA

J015 Canopy Sill Longeron Repair, F-16D, Right Side FS 161 Strap Rep Right side FS 161 Canopy Sill Longeron strap repair on F-16D Model aircraft, IAW PWS 1.14.15

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

4 EA

J015 Canopy Sill Longeron Rep, F-16D, L/R, FS 189 Strap Repair Both sides (Left and Right), FS 189 Canopy Sill Longeron strap repair, F-16D Model aircraft, IAW PWS 1.14.15

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

4 EA

J015 Canopy Sill Longeron Rep, F-16D, L/R, FS 218 Strap Repair Both Sides (Left and Right), FS 218 Canopy Sill Longeron strap repair, F-16D Model aircraft, IAW PWS 1.14.15

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

4 EA

J015 Drop-In Maintenance, FFP based on proposal Drop-in maintenance on USAFE F-16 C/D aircraft IAW PWS 1.14.3. Workload shall be negotiated as FFP for each event (aircraft), or determined as appropriate by the PCO and PM. Hours and Material to be specified on individual orders issued hereunder.

Fully loaded rates in fixed rate agreement apply to labor hours. See contract Attachment 2.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

800 EA

J015 Contract Field Team (CFT) support, FFP based on proposal CFT support for USAFE F-16 C/D aircraft IAW PWS 1.14.10. If the schedule allows, to be negotiated (TBN) as FFP for each event (aircraft), as determined by the PCO. Fully loaded rates in fixed rate agreement apply. Labor hours may be negotiated as determined by the PCO. See contract Attachment 2.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

6 EA

J015 Travel, Cost reimbursed no fee Contractor Field Team Travel, maintenance certification, training, and other meetings as required IAW PWS 1.14.10.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

IUID Required: Yes

Firm Fixed Price Quantity U/I Unit Price Amount

6 EA

J015 Phase Inspection, FFP with repair proposal Phase inspection with repair proposal, IAW PWS 1.14.11

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

6 EA

J015 Phase Inspection Repair based on proposal Phase inspection required repairs, IAW PWS 1.14.11

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

IUID Required: Yes

Time & Material Estimated Quantity

U/I Estimated Amount Ceiling Price

300 HR

J015 Phase Inspection O&A Over and Above requirements directly related to phase inspection/repairs as evaluated and verified by Administrative Contracting Officer and Program Manager, IAW PWS 1.14.11

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

IUID Required: Yes

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

1 EA

J015 Remove and Replace Wing Attach Bolts, (TCTO 2655) Remove and replace wing attach bolts on aircraft IAW 1.14.17.1. Once complete, document accomplishment of TCTO 2655 in AFTO 781 series forms

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

IUID Required: Yes

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

1 EA

J015 Repair Upper Outboard Bulkhead Flange, (TCTO 2672) Repair upper outboard bulkhead flange on aircraft IAW 1.14.17.2. Once complete, document accomplishment of TCTO 2672 in AFTO 781 series forms and provide inspection results to program office for input into CIRE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

IUID Required: Yes

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

1 EA

J015 Inspect Bulkhead Radius Cracks (TCTO 2675), w/ repair proposal

Inspect bulkhead radius for cracks on aircraft IAW 1.14.17.3. Once complete, document accomplishment of TCTO 2675 in AFTO 781 series forms and provide inspection results to program office for input into CIRE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

IUID Required: Yes

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

1 EA

J015 Inspect/Repair Aft Lift Sling Points, (TCTO 2679), w/ repair prop Inspect/repair aft lifting sling points on aircraft IAW 1.14.17.4. Once complete, document accomplishment of TCTO 2679 in AFTO 781 series forms

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

IUID Required: Yes

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

1 EA

J015 Install CDU Mod (TCTO 2643/2643C/2643D, 2745,2755) Install CDU modification on aircraft IAW 1.14.17.5. Once complete, document accomplishment of applicable TCTOs in AFTO 781 series forms.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

IUID Required: Yes

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

1 EA

J015 Install HMIIT Mod (TCTO 2647, 2677) Install HMIT modification on aircraft IAW 1.14.17.6. Once complete, document accomplishment of applicable TCTOs in AFTO 781 series forms.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

IUID Required: Yes

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

1 EA

J015 Install ARC-210 COMM-3 Modification, (TCTO 2676) Install ARC-210 COMM-3 modification on aircraft IAW 1.14.17.7. Once complete, document accomplishment of applicable TCTOs in AFTO 781 series forms.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

IUID Required: Yes

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

1 EA Not Separately Priced Not Separately Priced

J015 Contract Data Requirements List (CDRL), Administrative Reporting Contract Data Requirements List (CDRL), Administrative Reporting IAW Contract attachment, Exhibit A, DD Forms 1423, and all other contract CDRL requirements IAW PWS 1.18

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

IUID Required: Yes

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

15 EA

J015 Pre-Induction with inspection and work request Pre-Induction, IAW PWS 1.13 to include removal and replacement of all aircraft nitrogen, liquid oxygen, fuel, and hydrazine.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

IUID Required: Yes

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

15 EA

J015 Post-induction Services Post-maintenance (outgoing) servicing IAW PWS 1.15; to include replacement of all aircraft nitrogen, fuel, liquid oxygen, and hydrazine, inspection, cleaning, securing access plates/panels, weight and balance, ops checks, Engine runs, reinstalling extraneous equipment and functional check flights.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Time & Material Estimated Quantity

U/I Estimated Amount Ceiling Price

2,000 HR

J015 Over And Above Per PWS 1.17 Over and Above, (O&A) including Surge, as Directed by the PCOFixed Composite or Loaded Rates as established.Tasks, labor hours and material to be established on orders issued hereunder.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

15 EA

J015 370-gal Ex Fuel Tank remove/install (Defuel/Storage/Reinstall) Removal, storage, and reinstallation of 370-gal external fuel tank equipment IAW PWS 1.13.1.6.2 and 1.15.4 to include after installation operational checks. Unit price per two tanks.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

IUID Required: Yes

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

15 EA

J015 300-gal Ex Fuel Tank remove/install (Defuel/Storage/Reinstall) Removal, storage, and reinstallation of 370-gal external fuel tank equipment IAW PWS 1.13.1.6.2 and 1.15.4 to include after installation operational checks. Unit price per two tanks.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

IUID Required: Yes

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

6 EA

J015 Strip where Have Glass (HG) II coating will apply, F-16C Full strip of Have Glass II coatings using plastic media blast (PMB) for C model F-16 aircraft as outlined in PWS 1.14.7

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

6 EA

J015 Strip where Poly coat will apply, F-16C Full strip of Poly coatings using plastic media blast (PMB) for C model F-16 aircraft as outlined in PWS 1.14.7

Limitations of Liability: Other Than High Value Item

Inspection: Origin

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

IUID Required: Yes

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

6 EA

J015 Strip where HG II coating will apply, F-16 D Full strip of HG II using plastic media blast (PMB) for D model F-16 aircraft as outlined in PWS 1.14.7

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

6 EA

J015 Strip where Poly coat will apply, F-16D Full strip of Poly coatings using plastic media blast (PMB) for D model F-16 aircraft as outlined in PWS 1.14.7

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

15 EA

J015 Full Paint, Ap HG II (Full Multi Spec (FMS) 3049/FMS 2026), F-16C Standard Paint application of FMS 3049 and 2026 on F-16C model aircraft IAW PWS 1.14.7

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Firm Fixed Price Estimated Quantity

6 EA

J015 Full Paint, Apply Poly Coat paint, F-16C Standard Paint application of Poly paint on F-16C model aircraft IAW PWS 1.14.7

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

6 EA

J015 Full Paint, Ap HG II (Full Multi Spec (FMS) 3049/FMS 2026), F-16D Standard Paint application of FMS 3049 and 2026 on D model aircraft IAW PWS 1.14.7

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Firm Fixed Price

Estimated Quantity

U/I Unit Price Amount

6 EA

J015 Apply Poly Coat paint, F-16 D Standard Paint application of Poly paint on D model aircraft IAW PWS 1.14.7

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

6 EA

J015 Scuff Sand and Apply Full Multi Spectral (FMS) 2026 paint, F-16 C Scuff sand & paint of aircraft for C model F-16 aircraft using FMS 2026 paint as outlined in PWS 1.14.7

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

6 EA

J015 Scuff Sand and Apply Poly paint, F-16 C Scuff sand & paint of aircraft for C model F-16 aircraft using Poly paint as outlined in PWS 1.14.7

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

6 EA

J015 Scuff Sand and Apply Full Multi Spectral (FMS) 2026 paint, F-16 D Scuff sand & paint of aircraft for D model F-16 aircraft using FMS 2026 paint as outlined in PWS 1.14.7

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

6 EA

J015 Scuff Sand and Apply Poly paint, F-16 D Scuff sand & paint of aircraft for D model F-16 aircraft using Poly paint as outlined in PWS 1.14.7

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

12 EA

J015 370-gal External Fuel Tank PMB and Paint (HG II) See PWS reference 1.14.7, strip and repaint 370 gal fuel tanks as required utilizing HG II. Unit price is per tank.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

12 EA

J015 370-gal Ex Fuel Tank Surface Treat, PMB and Paint, Apply Poly Strip using Plastic Media Blast (PMB) and repaint 370-gal fuel tanks utilizing Poly paint IAW PWS 1.14.7. Unit price per two tanks.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

12 EA

J015 300-gal External Fuel Tank PMB and Paint (HG II) See PWS reference 1.14.7, strip (PMB) and repaint 300 gal fuel tanks as required utilizing HG II. Unit price is per tank.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

12 EA

J015 300-gal External Fuel Tank PMB and Paint (Poly Coat) See PWS reference 1.14.7, strip (PMB) and repaint 300 gal fuel tanks as required utilizing Poly Paint. Unit price is per tank.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

12 EA

J015 370-gal External Fuel Tank Scuff/Sand and Paint (HG II) See PWS reference 1.14.7, scuff/sand and repaint of 370 gal fuel tanks using HG II as required. Unit price is per tank.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

12 EA

J015 370-gal External Fuel Tank Scuff/Sand and Paint (Poly Coat) See PWS reference 1.14.7, scuff/sand and repaint of 370 gal fuel tanks using Poly Paint as required. Unit price is per tank

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Firm Fixed Price Estimated Quantity

U/I Unit Price Amount

12 EA

J015 300-gal External Fuel Tank Scuff/Sand and Paint (HG II) See…

This is the start of the file's text. The full file is on GovTribe.