FA823216R3030_______0008.pdf
PDF 116 KB Posted
- Attached to
- USAFE F-16 Depot Maintenance
- Solicitation number
- FA8232-16-R-3030
About this file
FA823216R3030_______0008
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
JSY
2. AMENDMENT/MODIFICATION NO.
FA8232-16-R-3030-0008
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ. NO.
F2DCCM6088B001
5. PROJECT NO (If applicable)
6. ISSUED BY CODE
DEPARTMENT OF THE AIR FORCE, DIRECTORATE OF CONTRACTING
AFLCMC WWMK
6072 FIR AVENUE BLDG 1233
HILL AIR FORCE BASE UT 84056-5820
BUYER: Eric A Dumpert/AFLCMC eric.dumpert.1@us.af.mil Phone: (801) 777- 5964 Fax: (000) 000-0000 No Collect Calls
7. ADMINISTERED BY (If other than item 6) CODEFA8232
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE
X
9A. AMENDMENT OF SOLICITATION NO.
FA823216R3030
9B. DATED (SEE ITEM 11)
23-JUN-2016
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
ROUTINE.
15A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR
BY ________________________________________________________
(Signature of person authorized to sign)
15C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16B. UNITED STATES OF AMERICA
BY ____________________________________________________
(Signature of Contracting Officer)
16C. DATE SIGNED
FACILITY CODE
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (REV. 10-83)
PRESCRIBED BY GSA
FAR (48 CFR) 53.243
X
X
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
Amendment/Modification FA8232-16-R-3030-0008
Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION
1. Clarified contract CLINs 0018, 0022, 0023, 1018, 1022, and 1023. Amount of tanks per unit was incorrect. To clarify throughout the contract, there are two 370 tanks (Wing) per Unit of Issue. There is one 300 tank (Center) per Unit of Issue.
2. Corrected CLIN 0010 to correspond with Pricing Attachment.
Request for Proposal FA8232-16-R-3030-0008
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.
The Ordering period will be from 1 November 2016 through 31 October 2020. There is 1 Option Ordering period from 1 November 2020 through 31 Oct 2021.
Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
15 EA
J015 Pre-Induction with inspection and work request Pre-Induction, IAW PWS 1.13 to include removal and replacement of all aircraft nitrogen, liquid oxygen, fuel, and hydrazine.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
IUID Required: Yes Physical Item Markings:
Period of Performance to be established on applicable order. All quantities are estimated. Pricing applicable for period of ordering (See pricing attachment).
Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
15 EA
J015 Post-induction Services Post-maintenance (outgoing) servicing IAW PWS 1.15; to include replacement of all aircraft nitrogen, fuel, liquid oxygen, and hydrazine, inspection, cleaning, securing access plates/panels, weight and balance, ops checks, Engine runs, reinstalling extraneous equipment and functional check flights.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
Item No.
Time & Material Estimated Quantity
U/I Estimated Amount Ceiling Price
2,000 HR
J015 Over And Above Per PWS 1.17 Over and Above, (O&A) including Surge, as Directed by the PCOFixed Composite or Loaded Rates as established.Tasks, labor hours and material to be established on orders issued hereunder.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
15 EA
J015 370-gal Ex Fuel Tank remove/install (Defuel/Storage/Reinstall) Removal, storage, and reinstallation of 370-gal external fuel tank equipment IAW PWS 1.13.1.6.2 and 1.15.4 to include after installation operational checks. Unit price per two tanks.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
IUID Required: Yes Physical Item Markings:
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
15 EA
J015 300-gal Ex Fuel Tank remove/install (Defuel/Storage/Reinstall) Removal, storage, and reinstallation of 300-gal external fuel tank equipment IAW PWS 1.13.1.6.2 and 1.15.4 to include after installation operational checks. Unit price per tank.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
IUID Required: Yes Physical Item Markings:
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
6 EA
J015 Strip where Have Glass (HG) II coating will apply, F-16C Full strip of Have Glass II coatings using plastic media blast (PMB) for C model F-16 aircraft as outlined in PWS 1.14.7
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
6 EA
J015 Strip where Poly coat will apply, F-16C Full strip of Poly coatings using plastic media blast (PMB) for C model F-16 aircraft as outlined in PWS 1.14.7
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
IUID Required: Yes Physical Item Markings:
Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
6 EA
J015 Strip where HG II coating will apply, F-16 D Full strip of HG II using plastic media blast (PMB) for D model F-16 aircraft as outlined in PWS 1.14.7
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
6 EA
J015 Strip where Poly coat will apply, F-16D Full strip of Poly coatings using plastic media blast (PMB) for D model F-16 aircraft as outlined in PWS 1.14.7
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
6 EA
J015 Full Paint, Ap HG II (Full Multi Spec (FMS) 3049/FMS 2026), F-16C Standard Paint application of FMS 3049 and 2026 on F-16C model aircraft IAW PWS 1.14.7
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
6 EA
J015 Full Paint, Apply Poly Coat paint, F-16C Standard Paint application of Poly paint on F-16C model aircraft IAW PWS 1.14.7
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
6 EA
J015 Full Paint, Ap HG II (Full Multi Spec (FMS) 3049/FMS 2026), F-16D Standard Paint application of FMS 3049 and 2026 on D model aircraft IAW PWS 1.14.7
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
6 EA
J015 Apply Poly Coat paint, F-16 D Standard Paint application of Poly paint on D model aircraft IAW PWS 1.14.7
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
6 EA
J015 Scuff Sand and Apply Full Multi Spectral (FMS) 2026 paint, F-16 C Scuff sand & paint of aircraft for C model F-16 aircraft using FMS 2026 paint as outlined in PWS 1.14.7
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
6 EA
J015 Scuff Sand and Apply Poly paint, F-16 C Scuff sand & paint of aircraft for C model F-16 aircraft using Poly paint as outlined in PWS 1.14.7
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
6 EA
J015 Scuff Sand and Apply Full Multi Spectral (FMS) 2026 paint, F-16 D Scuff sand & paint of aircraft for D model F-16 aircraft using FMS 2026 paint as outlined in PWS 1.14.7
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
6 EA
J015 Scuff Sand and Apply Poly paint, F-16 D Scuff sand & paint of aircraft for D model F-16 aircraft using Poly paint as outlined in PWS 1.14.7
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
6 EA
J015 RE
370-gal External Fuel Tank PMB and Paint (HG II) See PWS reference 1.14.7, strip and repaint 370 gal fuel tanks as required utilizing HG II. Unit price is per two tanks.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
IUID Required: Yes Physical Item Markings:
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
6 EA
J015 370-gal Ex Fuel Tank Surface Treat, PMB and Paint, Apply Poly Strip using Plastic Media Blast (PMB) and repaint 370-gal fuel tanks utilizing Poly paint IAW PWS 1.14.7. Unit price per two tanks.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
12 EA
J015 300-gal External Fuel Tank PMB and Paint (HG II) See PWS reference 1.14.7, strip (PMB) and repaint 300 gal fuel tanks as required utilizing HG II. Unit price is per tank.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
12 EA
J015 300-gal External Fuel Tank PMB and Paint (Poly Coat) See PWS reference 1.14.7, strip (PMB) and repaint 300 gal fuel tanks as required utilizing Poly Paint. Unit price is per tank.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
6 EA
J015 370-gal External Fuel Tank Scuff/Sand and Paint (HG II) See PWS reference 1.14.7, scuff/sand and repaint of 370 gal fuel tanks using HG II as required. Unit price is per two tanks.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
6 EA
J015 370-gal External Fuel Tank Scuff/Sand and Paint (Poly Coat) See PWS reference 1.14.7, scuff/sand and repaint of 370 gal fuel tanks using Poly Paint as required. Unit price is per two tanks.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW Sec 1.10.1
Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
12 EA
J015 300-gal External Fuel Tank Scuff/Sand and Paint (HG II) See PWS reference 1.14.7, scuff/sand and repaint of 300 gal fuel tanks using HG II as required. Unit price is per tank.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
12 EA
J015 300-gal External Fuel Tank Scuff/Sand and Paint (Poly Coat) See PWS reference 1.14.7, scuff/sand and repaint of 300 gal fuel tanks using Poly Paint as required. Unit price is per tank.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
5 EA
J015 Inlet RAM Strip and Paint (Document TCTO 2699 when complied ) Inlet Radar Absorbing Material (RAM) Strip and Paint IAW PWS par. 1.14.7.2
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
IUID Required: Yes Physical Item Markings:
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
15 EA
J015 Upper Flange Inspection and Repair, Block 40 (TCTO 2741) Upper Flange Bulkhead inspection and repair on Block 40 aircraft, IAW PWS 1.14.16. Once complete, document accomplishment of TCTO 2741 in AFTO 781 series forms and provide inspection results to program office for input into CIRE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
4 EA
J015 Upper Flange Inspection and Repair, Block 50 (TCTO 2741) Upper Flange Bulkhead inspection and repair on Block 50 aircraft IAW PWS 1.14.16. Once complete, document accomplishment of TCTO 2741 in AFTO 781 series forms and provide inspection results to program office for input into CIRE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
IUID Required: Yes Physical Item Markings:
Firm Fixed Price Quantity U/I Unit Price Amount
4 EA
J015 F-16 Wing Inspection/Repair F-16 Wing Inspection/Repair, including Upper/Lower Skin and Interior Wing Box -36 Inspection, Wing Box Cleaning, Fuel Cells Re-seal, and Faulty Component Replacement IAW PWS 1.14.12. and 1.14.12.1 Unit price is per wing
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
4 EA
J015 Upper Wing Skin Replacement Upper skin replacement IAW PWS 1.14.12. and 1.14.12.1 Unit price is per wing
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
4 EA
J015 Lower Wing Skin Replacement Lower skin replacement, IAW PWS 1.14.12. and 1.14.12.1 price is per wing
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
IUID Required: Yes Physical Item Markings:
Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
4 EA
J015 Wing Attach Fittings Replacement Wing attach fittings replacement IAW PWS 1.14.12. and 1.14.12.1 Unit price is per wing
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
4 EA
J015 Wing Removal & Reinstallation Perform wing removal and reinstallation IAW PWS 1.14.12. Unit price is per wing.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
4 EA
J015 Wing Replacement Perform wing replacement IAW PWS 1.14.12. Unit price is per wing.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
2 EA
J015 Canopy Sill Longeron Replace, F-16C, Both Sides (Left and Right) Both sides (Left and Right) Canopy Sill Longeron replacement on F-16C model aircraft IAW PWS 1.14.14.1
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
1 EA
J015 Canopy Sill Longeron Rep, F-16C, Left or Right, 16RB098 temp strp Left or Right side Canopy Sill Longeron temporary strap repair on F-16C model aircraft, IAW PWS 1.14.15
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
1 EA
J015 Canopy Sill Longeron Rep, F-16C, Left/Right, 16RB098 temp strp Both sides (Left and Right) Longeron temporary strap repair on F-16C model aircraft, IAW PWS 1.14.15
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
2 EA
J015 Canopy Sill Longeron Rep, F-16D Both Sides(2 sides/four lonerons) Both sides (Left and Right), two-piece Longeron replacement on F-16D model aircraft IAW PWS 1.14.14.2
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
1 EA
J015 Canopy Sill Longeron Repair, F-16D, Left Side FS 161 Strap Repair Left side FS 161 Canopy Sill Longeron strap repair on F-16D Model aircraft, IAW PWS 1.14.15
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
1 EA
J015 Canopy Sill Longeron Repair, F-16D, Right Side FS 161 Strap Rep Right side FS 161 Canopy Sill Longeron strap repair on F-16D Model aircraft, IAW PWS 1.14.15
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
1 EA
J015 Canopy Sill Longeron Rep, F-16D, L/R, FS 189 Strap Repair Both sides (Left and Right), FS 189 Canopy Sill Longeron strap repair, F-16D Model aircraft, IAW PWS 1.14.15
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
1 EA
J015 Canopy Sill Longeron Rep, F-16D, L/R, FS 218 Strap Repair Both Sides (Left and Right), FS 218 Canopy Sill Longeron strap repair, F-16D Model aircraft, IAW PWS 1.14.15
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
15 EA
J015 Drop-In Maintenance, FFP based on proposal Drop-in maintenance on USAFE F-16 C/D aircraft IAW PWS 1.14.3. Workload shall be negotiated as FFP for each event (aircraft), or determined as appropriate by the PCO and PM. Hours and Material to be specified on individual orders issued hereunder.
Fully loaded rates in fixed rate agreement apply to labor hours. See contract Attachment 2.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
800 HR
J015 Contract Field Team (CFT) support, FFP based on proposal CFT support for USAFE F-16 C/D aircraft IAW PWS 1.14.10. If the schedule allows, to be negotiated (TBN) as FFP for each event (aircraft), as determined by the PCO. Fully loaded rates in fixed rate agreement apply. Labor hours may be negotiated as determined by the PCO. See contract Attachment 2.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
19 EA
J015 Travel, Cost reimbursed no fee Contractor Field Team Travel, maintenance certification, training, and other meetings as required IAW PWS 1.14.10.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
IUID Required: Yes Physical Item Markings:
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
6 EA
J015 Phase Inspection, FFP with repair proposal Phase inspection with repair proposal, IAW PWS 1.14.11
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
6 EA
J015 Phase Inspection Repair based on proposal Phase inspection required repairs, IAW PWS 1.14.11
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
IUID Required: Yes Physical Item Markings:
Item No.
Time & Material Estimated Quantity
U/I Estimated Amount Ceiling Price
300 HR
J015 Phase Inspection O&A Over and Above requirements directly related to phase inspection/repairs as evaluated and verified by Administrative Contracting Officer and Program Manager, IAW PWS 1.14.11
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
IUID Required: Yes Physical Item Markings:
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
1 EA
J015 Remove and Replace Wing Attach Bolts, (TCTO 2655) Remove and replace wing attach bolts on aircraft IAW 1.14.17.1. Once complete, document accomplishment of TCTO 2655 in AFTO 781 series forms
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
IUID Required: Yes Physical Item Markings:
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
1 EA
J015 Repair Upper Outboard Bulkhead Flange, (TCTO 2672) Repair upper outboard bulkhead flange on aircraft IAW 1.14.17.2. Once complete, document accomplishment of TCTO 2672 in AFTO 781 series forms and provide inspection results to program office for input into CIRE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
IUID Required: Yes Physical Item Markings:
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
1 EA
J015 RE
Inspect Bulkhead Radius Cracks (TCTO 2675), w/ repair proposal Inspect bulkhead radius for cracks on aircraft IAW 1.14.17.3. Once complete, document accomplishment of TCTO 2675 in AFTO 781 series forms and provide inspection results to program office for input into CIRE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
IUID Required: Yes Physical Item Markings:
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
1 EA
J015 Inspect/Repair Aft Lift Sling Points, (TCTO 2679), w/ repair prop Inspect/repair aft lifting sling points on aircraft IAW 1.14.17.4. Once complete, document accomplishment of TCTO 2679 in AFTO 781 series forms
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
IUID Required: Yes Physical Item Markings:
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
1 EA
J015 Install CDU Mod (TCTO 2643/2643C/2643D, 2745,2755) Install CDU modification on aircraft IAW 1.14.17.5. Once complete, document accomplishment of applicable TCTOs in AFTO 781 series forms.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
IUID Required: Yes
Physical Item Markings:
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
1 EA
J015 RE
Install HMIT Mod (TCTO 2647, 2677) Install HMIT modification on aircraft IAW 1.14.17.6. Once complete, document accomplishment of applicable TCTOs in AFTO 781 series forms.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
IUID Required: Yes Physical Item Markings:
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
1 EA
J015 Install ARC-210 COMM-3 Modification, (TCTO 2676) Install ARC-210 COMM-3 modification on aircraft IAW 1.14.17.7. Once complete, document accomplishment of applicable TCTOs in AFTO 781 series forms.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
IUID Required: Yes Physical Item Markings:
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
1 EA Not Separately Priced Not Separately Priced
J015 Contract Data Requirements List (CDRL), Administrative Reporting Contract Data Requirements List (CDRL), Administrative Reporting IAW Contract attachment, Exhibit A, DD Forms 1423, and all other contract CDRL requirements IAW PWS 1.18
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
IUID Required: Yes Physical Item Markings:
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
15 EA
J015 Pre-Induction with inspection and work request
Pre-Induction, IAW PWS 1.13 to include removal and replacement of all aircraft nitrogen, liquid oxygen, fuel, and hydrazine.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
IUID Required: Yes Physical Item Markings:
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
15 EA
J015 Post-induction Services Post-maintenance (outgoing) servicing IAW PWS 1.15; to include replacement of all aircraft nitrogen, fuel, liquid oxygen, and hydrazine, inspection, cleaning, securing access plates/panels, weight and balance, ops checks, Engine runs, reinstalling extraneous equipment and functional check flights.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
Time & Material Estimated Quantity
U/I Estimated Amount Ceiling Price
2,000 HR
J015 Over And Above Per PWS 1.17 Over and Above, (O&A) including Surge, as Directed by the PCOFixed Composite or Loaded Rates as established.Tasks, labor hours and material to be established on orders issued hereunder.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
15 EA
J015 370-gal Ex Fuel Tank remove/install (Defuel/Storage/Reinstall) Removal, storage, and reinstallation of 370-gal external fuel tank equipment IAW PWS 1.13.1.6.2 and 1.15.4 to include after installation operational checks. Unit price per two tanks.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
IUID Required: Yes Physical Item Markings:
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
15 EA
J015 300-gal Ex Fuel Tank remove/install (Defuel/Storage/Reinstall) Removal, storage, and reinstallation of 300-gal external fuel tank equipment IAW PWS 1.13.1.6.2 and 1.15.4 to include after installation operational checks. Unit price per tank.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
IUID Required: Yes Physical Item Markings:
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
6 EA
J015 Strip where Have Glass (HG) II coating will apply, F-16C Full strip of Have Glass II coatings using plastic media blast (PMB) for C model F-16 aircraft as outlined in PWS 1.14.7
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
6 EA
J015 Strip where Poly coat will apply, F-16C Full strip of Poly coatings using plastic media blast (PMB) for C model F-16 aircraft as outlined in PWS 1.14.7
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
IUID Required: Yes Physical Item Markings:
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
6 EA
J015 Strip where HG II coating will apply, F-16 D Full strip of HG II using plastic media blast (PMB) for D model F-16 aircraft as outlined in PWS 1.14.7
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
6 EA
J015 Strip where Poly coat will apply, F-16D Full strip of Poly coatings using plastic media blast (PMB) for D model F-16 aircraft as outlined in PWS 1.14.7
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
6 EA
J015 Full Paint, Ap HG II (Full Multi Spec (FMS) 3049/FMS 2026), F-16C Standard Paint application of FMS 3049 and 2026 on F-16C model aircraft IAW PWS 1.14.7
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
6 EA
J015 Full Paint, Apply Poly Coat paint, F-16C Standard Paint application of Poly paint on F-16C model aircraft IAW PWS 1.14.7
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
6 EA
J015 Full Paint, Ap HG II (Full Multi Spec (FMS) 3049/FMS 2026), F-16D Standard Paint application of FMS 3049 and 2026 on D model aircraft IAW PWS 1.14.7
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
6 EA
J015 Apply Poly Coat paint, F-16 D Standard Paint application of Poly paint on D model aircraft IAW PWS 1.14.7
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
6 EA
J015 Scuff Sand and Apply Full Multi Spectral (FMS) 2026 paint, F-16 C Scuff sand & paint of aircraft for C model F-16 aircraft using FMS 2026 paint as outlined in PWS 1.14.7
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
6 EA
J015 Scuff Sand and Apply Poly paint, F-16 C Scuff sand & paint of aircraft for C model F-16 aircraft using Poly paint as outlined in PWS 1.14.7
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring IAW PWS Sec 1.10.1
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
6 EA
J015 Scuff Sand and Apply Full Multi Spectral (FMS) 2026 paint, F-16 D Scuff sand & paint of aircraft for D model F-16 aircraft using FMS 2026 paint as outlined in PWS 1.14.7
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .