FOUO_PDGU_TEP_Table_6Jan16.xlsx
XLSX spreadsheet 44 KB Posted
- Attached to
- Sustainment Upgrade for F-16 Programmable Display Generator Federal contract opportunity
- Solicitation number
- FA8232-16-R-3001
About this file
FOUO_PDGU_TEP_Table_6Jan16
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TEP Table Instructions:
1. Complete prices in the yellow cells and subsequent tabs.
2. Option periods/quantities do not guarantee award; any combination of options periods or quantities may be exercised by the Government and is entirely up to the Government's sole discretion.
3. Each period is assumed to have a duration of 12 months, it is anticipated that each service CLIN have a 12 month PoP
4. Options can be exercised early if the required notifications are provided
5. The pricing used when exercising an option will be the current FY pricing and it will be used throughout the entire period of performance for that option, regardless if the period of performance crosses FY's.
6. Incremental funding anticipated to be provided every 12 months.
| Key: | Performance Periods | ||||||||||||||||||||||||||||||||||||||||||
| Do not complete | |||||||||||||||||||||||||||||||||||||||||||
| Contractor fill noted by yellow | |||||||||||||||||||||||||||||||||||||||||||
| Fills provided by other tabs/attachments - Government will complete | |||||||||||||||||||||||||||||||||||||||||||
| CLIN Titles | CLIN Type | CLIN # | Qty | Period 1 | CLIN # | Qty | Option | ||||||||||||||||||||||||||||||||||||
| Period 2 | CLIN # | Qty | Option | ||||||||||||||||||||||||||||||||||||||||
| Period 3 | CLIN # | Qty | Option | ||||||||||||||||||||||||||||||||||||||||
| Period 4 | CLIN # | Qty | Option | ||||||||||||||||||||||||||||||||||||||||
| Period 5 | CLIN # | Qty | Option | ||||||||||||||||||||||||||||||||||||||||
| Period 6 | CLIN # | Qty | Option | ||||||||||||||||||||||||||||||||||||||||
| Period 7 | CLIN # | Qty | Option | ||||||||||||||||||||||||||||||||||||||||
| Period 8 | CLIN # | Qty | Option | ||||||||||||||||||||||||||||||||||||||||
| Period 9 | CLIN # | Qty | Option | ||||||||||||||||||||||||||||||||||||||||
| Period 10 | Notes | ||||||||||||||||||||||||||||||||||||||||||
| Government Directed Travel | CR | 0001 | 1 | $ - 0 | 1001 | 1 | $ - 0 | 2001 | 1 | $ - 0 | 3001 | 1 | $ - 0 | 4001 | 1 | $ - 0 | 5001 | 1 | $ - 0 | 6001 | 1 | $ - 0 | 7001 | 1 | $ - 0 | 8001 | 1 | $ - 0 | 9001 | 1 | $ - 0 | Do not complete, this CLIN will not be evaluated for TEP purposes. | |||||||||||
| ECP/CCP | FFP | 0002 | 1 | $ - 0 | 1002 | 1 | $ - 0 | 2002 | 1 | $ - 0 | 3002 | 1 | $ - 0 | 4002 | 1 | $ - 0 | 5002 | 1 | $ - 0 | 6002 | 1 | $ - 0 | 7002 | 1 | $ - 0 | 8002 | 1 | $ - 0 | 9002 | 1 | $ - 0 | CLIN will be populated by the government using rates provided in the Labor Rate Matrix multiplied by government generated notional hours | |||||||||||
| Admin CDRLs | NSP | 0003 | 1 | NSP | 1003 | 1 | NSP | 2003 | 1 | NSP | 3003 | 1 | NSP | 4003 | 1 | NSP | 5003 | 1 | NSP | 6003 | 1 | NSP | 7003 | 1 | NSP | 8003 | 1 | NSP | 9003 | 1 | NSP | PoP will run for the life of the contract | |||||||||||
| NRE (Development) | FFP | 0004 | 1 | $ - 0 | $ - 0 | 1004 | 1 | $ - 0 | $ - 0 | 2004 | 1 | $ - 0 | $ - 0 | 3004 | 1 | $ - 0 | $ - 0 | 4004 | 1 | $ - 0 | $ - 0 | Offeror shall propose IAW it's proposed development schedule bearing in mind the affordability constraints in section L. It is acceptable to bid outyears at zero if they will not be used. | |||||||||||||||||||||
| Block 30 Integration (Option) | FFP | 0005 | 1 | $ - 0 | $ - 0 | 1005 | 1 | $ - 0 | $ - 0 | 2005 | 1 | $ - 0 | $ - 0 | 3005 | 1 | $ - 0 | $ - 0 | 4005 | 1 | $ - 0 | $ - 0 | Price per year will encompass entire price of performing scope of CLIN. Option will only be exercised once, if at all. | |||||||||||||||||||||
| SST/SIL Test Support | FFP | 0006 | 1 | $ - 0 | $ - 0 | 1006 | 1 | $ - 0 | $ - 0 | 2006 | 1 | $ - 0 | $ - 0 | ||||||||||||||||||||||||||||||
| S/W Engineering Support (M6.5 Rehost) | CPFF | 0007 | 1 | $ - 0 | $ - 0 | 1007 | 1 | $ - 0 | $ - 0 | Incremental funding over 24 months | |||||||||||||||||||||||||||||||||
| Software Development Environment Workstation | |||||||||||||||||||||||||||||||||||||||||||
| (Option - single exercise only) | FFP | 0008 | 1 | $ - 0 | $ - 0 | 1008 | 1 | $ - 0 | $ - 0 | 2008 | 1 | $ - 0 | $ - 0 | Price per year will encompass entire price of performing scope of CLIN. Option will only be exercised once, if at all. | |||||||||||||||||||||||||||||
| Moving Map (Option - single exercise only) | FFP | 0009 | 1 | $ - 0 | $ - 0 | 1009 | 1 | $ - 0 | $ - 0 | 2009 | 1 | $ - 0 | $ - 0 | Price per year will encompass entire price of performing scope of CLIN. Option will only be exercised once, if at all. | |||||||||||||||||||||||||||||
| Dev Boards/Emulators | FFP | 0010 | 4 | $ - 0 | $ - 0 | ||||||||||||||||||||||||||||||||||||||
| SIL Test Assets (Production Representative) | FFP | 0011 | 25 | $ - 0 | $ - 0 | 1011 | 25 | $ - 0 | $ - 0 | 2011 | 25 | $ - 0 | $ - 0 | ||||||||||||||||||||||||||||||
| Flight Test Assets (Production Representative) | FFP | 0012 | 10 | $ - 0 | $ - 0 | 1012 | 10 | $ - 0 | $ - 0 | 2012 | 10 | $ - 0 | $ - 0 | 3017 | 4 | $ - 0 | $ - 0 | ||||||||||||||||||||||||||
| Preproduction ICS (Repair) | FFP | 1013AA | 1 | $ - 0 | $ - 0 | 2013AA | 1 | $ - 0 | $ - 0 | 3013AA | 1 | $ - 0 | $ - 0 | 4013AA | 1 | $ - 0 | $ - 0 | Contractor will provide a unit price for ICS. ICS costs per year per supported production unit. For evaluation purposes price multiplied by notional quantity. | |||||||||||||||||||||||||
| Preproduction ICS (Upgrade) | 1013AB | 1 | $ - 0 | 2013AB | 1 | $ - 0 | $ - 0 | 3013AB | 1 | $ - 0 | $ - 0 | 4013AB | 1 | $ - 0 | $ - 0 | Contractor will provide a unit price for ICS to upgrade flight test assets to final production representative configuration. | |||||||||||||||||||||||||||
| Depot Standup Support | FFP | 1014 | 1 | $ - 0 | $ - 0 | 2014 | 1 | $ - 0 | $ - 0 | 3014 | 1 | $ - 0 | $ - 0 | 4014 | 1 | $ - 0 | $ - 0 | Price per year will encompass entire price of performing scope of CLIN. Option will only be exercised once, if at all. | |||||||||||||||||||||||||
| S/W Engineering Support (M6.5 to M8) | FPLOE | 1015 | 1 | $ - 0 | $ - 0 | 2015 | 1 | $ - 0 | $ - 0 | 3015 | 1 | $ - 0 | $ - 0 | 4015 | 1 | $ - 0 | $ - 0 | Government will complete IAW Tab CLIN X015 | |||||||||||||||||||||||||
| TDP CDRLs (Product Drawings and Associated Lists) | FFP | 1016 | 1 | $ - 0 | $ - 0 | 2015 | 1 | $ - 0 | $ - 0 | 3015 | 1 | $ - 0 | $ - 0 | ||||||||||||||||||||||||||||||
| Flight Test Support | FFP | 2018 | 1 | $ - 0 | $ - 0 | 3018 | 1 | $ - 0 | $ - 0 | 4018 | 1 | $ - 0 | $ - 0 | ||||||||||||||||||||||||||||||
| Trial Vehicle Install (TVI)/Kit Proof Asset (Production Representative) | FFP | 2019 | 2 | 3019 | 2 | $ - 0 | $ - 0 | ||||||||||||||||||||||||||||||||||||
| Production Assets | FFP | 3020 | 46 | $ - 0 | $ - 0 | 4020 | 46 | $ - 0 | $ - 0 | 5020 | 156 | $ - 0 | $ - 0 | 6020 | 156 | $ - 0 | $ - 0 | 7020 | 156 | $ - 0 | $ - 0 | 8020 | 59 | $ - 0 | $ - 0 | 9020 | 1 | $ - 0 | $ - 0 | Prices shall calculated by utilizing government generated notional quantities to CLIN X020 tab. | |||||||||||||
| Production Assets Block 30/32 a/c | FFP | 3021 | 75 | $ - 0 | $ - 0 | 4021 | 100 | $ - 0 | $ - 0 | 5021 | 100 | $ - 0 | $ - 0 | 6021 | 25 | $ - 0 | $ - 0 | 7021 | 1 | $ - 0 | $ - 0 | 8021 | 1 | $ - 0 | $ - 0 | 9021 | 1 | $ - 0 | $ - 0 | Prices shall calculated by utilizing government generated notional quantities to CLIN X021 tab. | |||||||||||||
| ICS | FFP | 4022 | 1 | $ - 0 | $ - 0 | 5022 | 1 | $ - 0 | $ - 0 | 6022 | 1 | $ - 0 | $ - 0 | 7022 | 1 | $ - 0 | $ - 0 | 8022 | 1 | $ - 0 | $ - 0 | 9022 | 1 | $ - 0 | $ - 0 | Contractor will provide a unit price for ICS. ICS costs per year per supported production unit. For evaluation purposes price multiplied by notional quantity. | |||||||||||||||||
| Totals | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
CLIN X015
Sheet Instructions:
1. The offeror shall complete the rate for each labor category.
2. These rates will be fixed and will be used for all adjustments to this CLIN upward and downward.
3. The offeror shall ensure that that the total price generated corresponds to the price proposed in the TEP Table and Section B of the RFP.
4. Apply the best match possible to each labor category even if loosely match or duplicative.
5. Any deviations from or alterations to this sheet shall be at the Government's sole discretion.
6. Option hours do not guarantee award; any combination of options hours may be exercised by the Government and is entirely up to the Government's sole discretion.
7. All labor hour rates shall be fully burdened rates including profit, and include all indirect labor, G&A, FCCOM costs, profits, etc. (as applicable)
8. Do not extend labor hour rates beyond two decimal places.
9. One composite rate per labor category per period will apply to all members of the offeror's team (including the prime, inter-divisions, and all subcontractors). No additional labor rate categories will be added during contract performance except at the Government's sole discretion.
| Option Period 2 | Option Period 3 | Option Period 4 | Option Period 5 | ||||||||||
| Labor Category Title | Labor Category Definition | Hours* | Rate | Total | Hours* | Rate | Total | Hours* | Rate | Total | Hours* | Rate | Total |
| Systems Engineer | BS/MS in Eng and 3+ yrs of directly related experience | 2080 | $ - 0 | 2080 | $ - 0 | 2080 | $ - 0 | 2080 | $ - 0 | ||||
| Electronic Eng | BS/MS in EE and 3+ yrs directly related experience | 2080 | $ - 0 | 2080 | $ - 0 | 2080 | $ - 0 | 2080 | $ - 0 | ||||
| Sr Software Eng | BS/MS in SE, CS, IT or EE and 7+ yrs related experience | 2080 | $ - 0 | 2080 | $ - 0 | 2080 | $ - 0 | 2080 | $ - 0 | ||||
| Software Eng (Computer Scientist) | BS/MS in SE, CS, IT or EE and 3+ yrs related experience | 2080 | $ - 0 | 2080 | $ - 0 | 2080 | $ - 0 | 2080 | $ - 0 | ||||
| Embedded Systems Engineer | BS/MS in SE, CS, IT or EE and 7+ yrs related experience | 2080 | $ - 0 | 2080 | $ - 0 | 2080 | $ - 0 | 2080 | $ - 0 | ||||
| ** |
| Grand Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| *Hours provided are Iniital Level of Effort Quantities and may be subject to change at the Government's sole discretion and authority either upward or downward at the rates provided. |
CLIN X020
Sheet Instructions:
1. All prices shall be FFP, fully burdened and contractually binding. They will be used to exercise production options under CLIN X020 Production Assets.
2. If a production asset option is exercised, the minimum number of assets that will be ordered at one time is: 10
3. The offeror may alter column widths, but shall not otherwise alter the spreadsheet.
4. Any deviations from or alterations to this sheet shall be at the Government's sole discretion.
5. Option quantities do not guarantee award; any combination of options quantities may be exercised by the Government and is entirely up to the Government's sole discretion.
Max Sum of Assets to be procured 700
| Quantity Prices | ||||||||||
| 10-50 | 51-100 | 101-150 | 151-200 | 201-250 | 251-300 | 301-400 | 401-500 | 501-600 | 601-700 | |
| Production Assets Option Period 4 | ||||||||||
| Production Assets Option Period 5 | ||||||||||
| Production Assets Option Period 6 | ||||||||||
| Production Assets Option Period 7 | ||||||||||
| Production Assets Option Period 8 | ||||||||||
| Production Assets Option Period 9 | ||||||||||
| Production Assets Option Period 10 |
CLIN X021
Sheet Instructions:
1. All prices shall be FFP, fully burdened and contractually binding. They will be used to exercise production options under CLIN X021 Production Assets.
2. If a production asset option is exercised, the minimum number of assets that will be ordered at one time is: 10
3. The offeror may alter column widths, but shall not otherwise alter the spreadsheet.
4. Any deviations from or alterations to this sheet shall be at the government's sole discretion.
5. Option quantities do not guarantee award; any combination of options quantities may be exercised by the Government and is entirely up to the Government's sole discretion.
| Max Sum of Assets to be procured | 400 | ||||||
| Quantity Prices | |||||||
| 10-50 | 51-100 | 101-150 | 151-200 | 201-250 | 251-300 | 301-400 | |
| Production Assets Option Period 4 | |||||||
| Production Assets Option Period 5 | |||||||
| Production Assets Option Period 6 | |||||||
| Production Assets Option Period 7 | |||||||
| Production Assets Option Period 8 | |||||||
| Production Assets Option Period 9 | |||||||
| Production Assets Option Period 10 |
CLIN descriptions
| CLIN # | CLIN Title | CLIN Descriptions | |
| X001 | Government Directed Travel | Reserve CLINs for future use | |
| X002 | ECP/CCP | Reserve CLINs for future use | |
| X003 | Admin CDRLs | The Contractor shall provide the administration documentation identified in Appendix A and B of the PDGU SOO. | |
| X004 | NRE (Development) | The Contractor shall design, develop, integrate, test, qualify and verify a PDG Upgrade to meet all contractual and Subsystem Requirements Document (SSRD) requirements. | |
| X005 | Block 30 Integration (Option) | The Contractor shall design, develop, integrate, test, qualify and verify a PDG Upgrade to meet all contractual and Subsystem Requirements Document (SSRD) objective requirements for the block 30/32 aircraft. | |
| X006 | SST/SIL Test Support | The Contractor shall support the testing of the SIL asset. (SOO para 3.2.7.3) | |
| X007 | S/W Engineering Support (M6.5 Rehost) | The Contractor shall modify, verify, and integrate the USG-provided functionally representative software baseline with the PDG Upgrade hardware. (SOO para 3.2.3.5.1) | |
| X008 | Software Development Environment Workstation | ||
| (Option - single exercise only) | The Contractor shall provide a Software Development Environment along with any required software development tools. (SOO para 3.2.3.5.1) | ||
| X009 | Moving Map (Option - single exercise only) | The Contractor shall provide the software need to meet the Moving Maps objective requirement. (SRD para 3.2.1.5.8) | |
| X010 | Dev Boards/Emulators | The Contractor shall provide functionally representative hardware emulators along with necessary documentation and training to support the re-host efforts. (SOO para 3.2.7.1) | |
| X011 | SIL Test Assets (Production Representative) | The Contractor shall deliver the PDGU for the USG F-16 system integration test program. The systems shall support software development, system, integration, and ground test |
during the development phase. The Contractor shall upgrade these assets to the final production-representative configuration, to include IUID requirements, within one (1) year after the end of EMD. (SOO para 3.2.4.5) X012 Flight Test Assets (Production Representative) The Contractor shall deliver the PDGU for the USG F-16 flight test program. The systems shall support software development, system, integration, and flight test during the development phase. The Contractor shall upgrade these assets to the final production-representative configuration, to include IUID requirements, within one (1) year after the end of EMD. (SOO para 3.2.4.5) X013 Preproduction ICS (interim contractor support) The Contractor shall inspect all preproduction assets sent in for repair. The Contractor shall address No Fault Found, Standard Repair, Over and Above, and Beyond Economical Repair (BER) assets. (SOO para 4.5)
| X014 | Depot Standup Support | The Contractor shall support the establishment of a USG Depot repair capability for the PDGU. (SOO para 4.3) |
| X015 | S/W Engineering Support (M6.5 to M8) | The Contractor shall provide on-site support to the 309th SMXG drawing on the experience and lessons learned with the original re-host. (SOO para 3.2.3.5.2) |
| X016 | TDP CDRLs | The Contractor shall provide the technical data and documentation identified in Appendix A and B of the PDGU SOW. |
| X017 | TPS (ITA) | The Contractor shall develop and deliver compatible TPS, ITAs, shall perform Integration Acceptance Test of the TPS/ITA at the Depot in Ogden, UT, shall provide a training |
program for USAF personnel at the 309th SMXG, Ogden, UT on the operation and maintenance of the TPS/ITA and will provide all provisioning data required for depot activation. (SOO para 4.4)
| X018 | Flight Test Support | The Contractor shall support the testing of the Flight Test assets. (SOO para 3.2.7.4) |
| X019 | TVI/Kit Proof Asset (Production Representative) | The Contractor shall provide a Technical Validation Inspection (TVI) asset for Kit Proof of the PDGU. |
| X020 | Production Assets | The Contractor shall accomplish all required tasks to establish a production capacity to produce the PDG Upgrade. |
| X021 | Production Assets Block 30 a/c | The Contractor shall accomplish all required tasks to establish a production capacity to produce the PDG Upgrade. |
| X022 | ICS (interim contractor support) | The Contractor shall inspect all assets sent in for repair. The Contractor shall address No Fault Found, Standard Repair, Over and Above, and Beyond Economical Repair (BER) |
assets. The Contractor shall provide repair data information back to the USG on all equipment repairs/findings on each repair order and order modification. (SOO para 4.5)