PD003.ATSTS.05072018.pdf
PDF 374 KB Posted
- Attached to
- Air Turbine Starter Test Stands
- Solicitation number
- FA8224-18-R-0020
About this file
Draft of PD #003 for Air Turbine Starter Test Stands: Note that changes have been made to this document from the previously posted version, please review thoroughly.
View the file
Other files
Show 40 more
Latest 50 of 66 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
7 May 2018
DISTRIBUTION STATEMENT A. Approved for public release: Distribution is unlimited.
PD #003
Purchase Description (PD) for
300 PSIG NOMINAL COMPRESSED AIR SYSTEM
Prepared by:
COMMODITIES SUPPORT MAINTENANCE GROUP
309TH CMXG
HILL AFB UT 84056
PD003 2
THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK
PD003 3
TABLE OF CONTENTS
1. SCOPE
1.1. Scope Statement
2. APPLICABLE DOCUMENTS
2.1. Government Documents
2.2. General Industry Regulations
3. REQUIREMENTS
3.1. General
3.2. Compressors
3.3. Air Quality
3.4. Piping
3.5. Storage
3.6. Safety
3.8. Hose Requirements
3.9. Life Cycle Sustainment
Appendix A
PD003 4
1. SCOPE
1.1. Scope Statement. The purpose of this Purchase Description (PD) is to define the technical requirements for the 300psig nominal compressed air system.
2. APPLICABLE DOCUMENTS
2.1. Government Documents. The following specifications, standards, and handbooks of the exact revision listed below form a part of this specification to the extent specified herein.
2.1.1. Technical Orders. None.
2.1.2. Department of Defense Standards. None.
2.2. General Industry Regulations. Test stand design shall conform to the following:
2.2.1. NFPA 70: National Electric Code (NEC), latest edition
2.2.2. 29 CFR 1910 Occupational and Health Administration (OSHA) General Industry
Regulations
3. REQUIREMENTS
3.1. General. The air system shall connect to the three existing pneumatic component test stands in Room 112 and the existing test stand connection on the south wall of Room 106. The air system design shall consist of new piping from the location of the compressors up to the test stand connection points. The design shall include isolation valves close to each test stand.
3.2. Compressors. The air system shall include a minimum of two (2) compressors, each capable of producing a minimum of 0.5 pounds per minute @ 300 ± 20 psig nominal pressure. The compressors shall be staged with pressure switches so that they run on demand. The compressor controller shall allow the compressors to alternate being the primary supply to keep operating hours more even. Each compressor shall have the ability to be isolated for maintenance while the other(s) remain in operation.
3.3. Air Quality. The air system shall be clean, oil free (<4ppm), and dry (<0°F dew point.) The system shall include a 25 micron or better air filter that can be isolated and depressurized for maintenance.
PD003 5
3.4. Piping. Air supply piping, and valves, shall be non-corrosive material (e.g. stainless steel, anodized aluminum IAW the latest revision of ASME B31.3) rated for all expected temperatures and pressures. Piping shall be sized to match the existing line sizes of the existing pneumatic component test stands.
3.5. Storage. The air system shall include a minimum 50 gallon storage tank. The storage tank shall have an automatic adjustable condensate drain valve.
3.6. Safety. The air system shall conform to the General Industry Requirements listed in paragraph 2.2. The system shall have a safety relief valve.
3.7. Energy Efficiency. To fullest extent possible, the contractor shall incorporate energy efficiencies into the test system design and function (e.g. expected process time, pre-heat, state of equipment during idle time, etc.).
3.8. Hose Requirements. The air system shall not utilize hoses.
3.9. Life Cycle Sustainment. The overall system design (e.g. components, hardware, software, etc.) shall be reliable, accessible, and maintainable and also allow the Government to competitively select service providers for all future repairs without involving the original manufacturer of the system. Wherever possible, the contractor shall use components that are commercially available, commonly used in comparable industry equipment, interchangeable with other brands, and competitively priced. The ATS system design shall not force the
Government into a sole-source condition with the original manufacturer of the system when repairs or replacement parts are required. The system design shall not require the Government or a Government contractor to perform any reverse engineering in order to make system repairs.
PD003 6
APPENDIX A. ACRONYMNS AND ABBREVIATIONS
NEC National Electric Code
OSHA Occupational and Health Administration
PD Purchase Description
PSIG Pounds per Square Inch – Gauge