Draft of SOW for Air Turbine Starter Test Stands: Note that changes are anticipated on this document prior to solicitation release.
View the file
Other files
Show 40 more
Latest 50 of 66 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW) for Air Turbine Starter (ATS) Test Stands And Process Air Systems
Prepared by:
COMMODITIES SUPPORT MAINTENANCE GROUP
309TH CMXG
HILL AFB UT 84056
THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK
TABLE OF CONTENTS
| 1. SCOPE | 5 |
| 1.1. Scope | 5 |
| 2. APPLICABLE DOCUMENTS | 5 |
| 2.2. General Industry Publications | 5 |
| 2.3. Order of Precedence | 5 |
| 3. REQUIREMENTS | 6 |
| 3.2. Program Management | 6 |
| 3.2.1. Program Manager | 6 |
| 3.2.2. Monthly Status Report | 6 |
| 3.2.3. Conferences and Program Reviews | 6 |
| 3.4. Removal of Existing Equipment and Installation of New Equipment | 7 |
| 3.4.1. Equipment Removal | 7 |
| 3.4.2. Equipment Installation | 8 |
| 3.4.3. Equipment Connections. | 8 |
| 3.4.4. Facility Modifications. | 8 |
| 3.4.5. Tools and Equipment | 8 |
| 3.4.6. Size Restrictions | 9 |
| 3.4.7. Shipping | 9 |
| 3.4.8. Protection | 9 |
| 3.4.9. Removal and Installation | 9 |
| 3.5. Training. | 9 |
| 3.6. Item Unique Identification (IUID) Requirements | 9 |
| 3.7. Caution Plates | 10 |
| 3.8. Information Assurance (IA) | 10 |
| 4. DOCUMENTATION | 11 |
| 4.1. Operation and Maintenance Manual for ATS Test Stands | 11 |
| 4.2. Test Stand Engineering Data | 11 |
| 4.2.3. Drawing Package for the Process Air System for Pneumatic Component Testing | 13 |
| 4.2.4. Drawing Package for 300 psi Air System | 13 |
| 4.3. Commercial Parts | 14 |
| 4.4. Calibration Quality Standard and Traceability | 14 |
| 4.5. Acceptance Test Plan and Report | 14 |
| 4.6. Computer Program Identification Number (CPIN) | 15 |
| 5. DATA DELIVERABLES | 15 |
| 6. GOVERNMENT FURNISHED EQUIPMENT (GFE) | 16 |
| 6.1. Assets Loaned by the Government | 16 |
| 6.2. GFE Protection. | 16 |
| 6.3. Damage Reporting | 16 |
| 7. AVAILABLE FACILITY SERVICES. | 17 |
| 7.1. Electrical | 17 |
| 7.2. Shop Air | 17 |
| 7.3. Cooling Water | 17 |
| 7.4. Natural Gas. Natural gas line to existing furnace is available. | 17 |
| 8. ACCESS TO FACILITIES AND PROPERTY | 18 |
| 9. DATA RIGHTS | 18 |
| 10. WARRANTY | 18 |
| Appendix A | 19 |
| Appendix B | 20 |
| Appendix C | 21 |
| Appendix D | 27 |
1. SCOPE
1.1. Scope. This Statement of Work (SOW) defines the tasks associated with the procurement required to replace three (3) existing Air Turbine Starter (ATS) test stands with two (2) new ATS test stands that meet the requirements of Purchase Description (PD) #001, replacing the existing 300 psi facility air system with a new process air system that meets the requirements of PD #002 and installing a new 300 psi process air system that meets the requirements of PD #003. The Contractor shall provide all equipment, adapters, tools, supplies, labor, and management necessary for the entire design, delivery, installation, and training.
2. APPLICABLE DOCUMENTS
2.1. Government Documents.
2.1.1. Specifications, Standards, and Handbooks. The following specifications, standards, and handbooks of the exact revision listed below form a part of this SOW to the extent specified herein.
2.1.2. Other Government Documents, Drawings, and Publications.
Table 21 Purchase Descriptions
| PD NUMBER |
| PD TITLE |
| 001 |
| Two (2) Air Turbine Starter Test Stands |
| 002 |
| Process Air System for Pneumatic Component Testing |
| 003 |
| 300 PSIG Nominal Compressed Air System |
Table 23 Drawings
| DRAWING NUMBER |
| CAGE CODE |
| NOMENCLATURE |
| 9579776 Rev M |
| 98752 |
| Product Data Specification |
| 9579777 Rev B |
| 98752 |
| Clarification of Detailed Test Criteria for Electrical and Avionics Items |
2.2. General Industry Publications. All work shall conform to the following:
2.2.1. NFPA 70: National Electric Code (NEC), latest edition
2.2.2. 29 CFR 1910 Occupational and Health Administration (OSHA) General Industry Regulations
2.3. Order of Precedence. In the event of a conflict between the text of this document and the references cited herein, the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained.
3. REQUIREMENTS
3.1. System. The Contractor shall design, build, and install an entire system that integrates all of the requirements found in this document and PD #001, PD #002, and PD #003.
3.2. Program Management
3.2.1. Program Manager. The contractor shall identify to the Government and maintain a single point of contact (Program Manager) for all matters under this contract. The contractor shall also ensure that all program management personnel assigned to the program shall be available, as required, to meet program objectives.
The contractor shall identify to the Government and maintain a single point of contact (Program Manager) for all matters under this contract.
3.2.2. Monthly Status Report. The contractor shall submit a monthly status report, due by the 5th of every month, which shall cover actions to date as well as a projection of planned work for the remaining effort. Reports shall document tasks, issues, actions, and deliverables. Problem areas shall be identified with proposed solutions and outcomes. (CDRL A001, DI-MGMT-80227, Contractor’s Progress, Status and Management Report)
3.2.3. Conferences and Program Reviews
3.2.3.1. Kick Off Meeting. The kick off meeting shall take place within 72 hours of the contract award. This can take place via telecom.
3.2.3.2. Post Award Conference. The Government will convene a post-award conference with the contractor at Hill AFB within 60 days after contract award. The Procuring Contracting Officer (PCO) will coordinate the actual date, time, and location of the conference with the contractor. The purpose of this conference will be to review the requirements of this SOW and the applicable Purchase Description, tour the facility where the equipment will be installed, and provide the opportunity for the contractor to ask questions. This conference also allows the contractor to present possible design options. The duration of this conference is not expected to exceed one (1) week, but may be scheduled longer if requested in advance by the contractor. The contractor’s program manager and lead design engineer of the test stands shall be present for this event. The contractor shall record meeting minutes and deliver them to the Government within one (1) week for review. (CDRL A002, DI-ADMN-81250, Conference Minutes)
3.2.3.3. Preliminary Design Review. The Contractor shall conduct a Preliminary Design Review (PDR) within 120 days after contract award. The design review shall be held at a location that is mutually agreeable to both parties, or via teleconference. The purpose of the PDR is to allow Hill AFB personnel to review the preliminary mechanical and electrical test equipment diagrams, preliminary software methodology (e.g. proposed architecture) and provide early feedback to the contractor. The contractor shall provide preliminary copies of the system diagrams, a proposed list of major components, and a brief description of the proposed software methodology. This information shall be e-mailed (or mailed on CD ROM) to the Government representative one week in advance of the conference call. File Transfer Protocol (FTP) is not permitted unless there is an existing Air Force approved site. The contractor shall record meeting minutes and deliver them to the Government within one (1) week for review. (CDRL A002, DI-ADMN-81250, Conference Minutes)
3.2.3.4. Intermediate Design Reviews. The Contractor shall conduct at least two Intermediate Design Review (IDR). The purpose of the IDR is to ensure that the Contractor’s designs and plans are aligned with the PD requirements. The Contractor shall provide preliminary drawings and manuals to the Government in advance of the meeting. The contractor shall record meeting minutes and deliver them to the Government within one (1) week for review. (CDRL A002, DI-ADMN-81250, Conference Minutes)
3.2.3.5. Critical Design Review. The Contractor shall conduct a Critical Design Review (CDR). The design review shall be held at a location that is mutually agreeable to both parties, or via teleconference. The purpose of the CDR is to perform a thorough review of technical manual and drawing package in preparation for Government final approval. The contractor shall also provide the test plan for the Factory Acceptance Test for review at the CDR. (CDRL A002, DI-ADMN-81250, Conference Minutes)
3.2.3.6. Acceptance Testing. The Contractor shall host at their facility a Factory Acceptance Test (FAT) to demonstrate the capabilities of the ATS test stands of PD #001 using the Contractor developed test plan. The test plan shall demonstrate to the maximum extent possible, that the test equipment meets the requirements of PD #001. Whereas it may not be possible to demonstrate full capability at the Contractor’s facility, the FAT may be concluded at Hill AFB after installation. During the FAT, the Government will conduct a configuration audit of the test stands using the latest revision of the drawings as a baseline. The contractor shall include validation testing of each Unit Under Test (UUT) as part of their test plan. (CDRL A003, DI-NDTI-80566A, Test Plan)The Contractor shall host at their facility a Factory Acceptance Test (FAT) IAW CDRL A003. The test plan shall demonstrate to the maximum extent possible, that the test equipment meets the requirements of PD #001. During the FAT, the Government will conduct a configuration audit of the test stands using the latest revision of the drawings as a baseline. The contractor shall include validation testing of each Unit Under Test (UUT) as part of their test plan. Upon completion of the FAT, the Contractor shall deliver an Acceptance Test Report (CDRL A012).Whereas it may not be possible to demonstrate full capability at the Contractor’s facility, the final acceptance testing shall be concluded at Hill AFB after installation. (CDRL A003, DI-NDTI-80566, Test Plan and CDRL A012, DI-NDTI-80809, Test Report)
3.3. Removal of Existing Equipment and Installation of New Equipment
3.3.1. Equipment Removal. The Contractor shall disassemble, remove, and palletize the existing equipment listed in Table 31. The palletized components shall be placed in a designated location outside building 240 (no more than 50 feet away). The Government will drain hazardous chemicals prior to removal; however, the contractor shall take necessary precautions for any residual material. The contractor shall remove all unused equipment when replacing the existing test stand and air system. Upon removal of the existing equipment, the contractor shall cap off, and seal, any areas exposed to the exterior of the building.
Table 31 Equipment to be removed
300 psi air system and piping
300 psi air system cooling system and piping
300 psi air system gas furnace and controller
2 each 300 psi air compressors
3 each existing ATS test stands
300 psi Furnace and Piping
Table 32 Optional equipment to be reused
3 each 5,000 gallon air storage tanks
3 each existing ATS test stand concrete pads
2 each existing air compressor concrete pads
Existing door interlocks and test in progress lights
Existing air ventilation louvers
Existing I-beams above test stands
2 each existing air bypass mufflers
2 each existing exhaust fans and ducts
2each existing exhaust vents(brake dust vents)
Existing conduit trays
Existing stainless steel valves
3.3.2. Equipment Installation. The Contractor shall install the equipment listed in Table 33.
Table 33 Equipment to be installed
1 test stand in room 103 & 1 test stand in room 104 (PD #001)
New process air system (PD #002)
New 300 psi air system (PD #003)
3.3.3. Equipment Connections. The Contractor shall reconnect any previously connected equipment to the new process air systems. (See PD #002 and PD #003)
3.3.4. Facility Modifications. The Contractor shall not make any facility structural modifications without prior written approval from the Government’s technical representative. This includes any work being done on the roof.
3.3.5. Tools and Equipment. The Contractor shall be responsible to furnish all tools and equipment required to remove existing equipment and install new equipment. The Government will not furnish any tools or equipment.
3.3.6. Size Restrictions. The Contractor shall consider existing facility limitations (e.g. door sizes, hallway width, etc.) when determining equipment installation/removal paths. The Government does not guarantee the accuracy of the drawings provided in Appendix D.
3.3.7. Shipping. The Contractor shall be responsible for all equipment shipping costs, to include all rigging, loading/unloading, transportation from the shipping dock to the permanent location of the equipment.
3.3.8. Protection. Any equipment installed outside the building shall be adequately protected from the environment and vehicles. Where necessary, the Contractor shall install shields and barriers (e.g. bollards) to protect both the equipment and pedestrians from harm.
3.3.9. Removal and Installation. Contractor shall minimize impact to current Air Turbine Starter testing during the removal and installation processes. The contractor shall submit a removal and installation plan that allows the Government to continue testing throughout the final acceptance process.
3.4. Training. The Contractor shall provide the trainings listed in Table 34.
Table 34
| Training Type |
| Number of Hours |
| Number of People |
| ATS Test Stand Software (Admin) and Source Code |
| 20 |
| 3 |
| ATS Test Stand Operation |
| 40 |
| 3 |
| ATS Test Stand Calibration |
| 8 |
| 3 |
| ATS Test Stand Maintenance |
| 8 |
| 3 |
| 125 PSI Air System Operation |
| 4 |
| 3 |
| 125 PSI Air System Maintenance |
| 8 |
| 3 |
| 300 PSI Air System Operation |
| 1 |
| 3 |
| 300 PSI Air System Maintenance |
| 1 |
| 3 |
3.5. Item Unique Identification (IUID) Requirements. Item Unique Identification (IUID) Requirements. The IUID Program requires each qualifying Air Force (AF) asset to be uniquely identified with a permanent marking that can sustain its information throughout the life of the asset. The test stand shall contain a Unique Identification (UID) marking in accordance with MIL-STD-130N. The contractor shall have a thorough understanding of IUID marking requirements, marking equipment, databases and their interfaces, engineering evaluation requirements, verification, and data and configuration management relating to IUID marking. The contractor shall maintain the IUID tags (markings) in accordance with MIL-STD-130N, dated 17 December 2007, contract clauses, DFARS (252.211-7003, 252.211-7007), and the contractor's IUID Marking Plan. The contractor shall report using the IUID registry, located on the internet at: http://www.acq.osd.mil/dpap/pdi/uid/ data_submission_information.html. All assets subject to marking must be recorded in the DoD IUID Registry.The IUID Program requires each qualifying Air Force (AF) asset to be uniquely identified with a permanent marking that can sustain its information throughout the life of the asset. The test stand shall contain a Unique Identification (UID) marking in accordance with MIL-STD-130N. The contractor shall report using the IUID registry, located on the internet at: http://www.acq.osd.mil/dpap/pdi/uid/ data_submission_information.html.
3.5.1. IUID Marking/Labeling Plan. The contractor’s IUID Marking Plan shall fully detail and document the strategy and scope to be used to meet MIL-STD-130N, DoD Standard Practice Identification Marking of US Military Property. The plan shall be approved by 530 CMMXS/MXDEA prior to implementation. (CDRL A004, DI-MGMT-81803, Item Unique Identification (IUID) Marking Plan)
3.5.2. IUID Marking Activity and Verification Report. The contractor shall provide an IUID Marking Activity and Verification Report. A key attribute for the report is the Verification column which indicates pass/fail for each item’s Data Matrix Symbol Quality. (CDRL A005, DI-MGMT-81804A, Item Unique Identification (IUID) Marking Activity, Validation and Verification Report)
3.5.3. Access Security. The contractor shall incorporate system security features that will only allow authorized users to make IUID Data Labels or access reports. This should include user access verification using the DoD IUID registry with furnished authorization codes and passwords.
3.6. Caution Plates. The manufacturer shall furnish corrosion-resistant caution plates secured to the system in a visible location with all important cautions to be observed by the operator. The plate shall be permanently marked. If more than one plate is required to alert the operator and/or maintenance personnel in one or more areas, caution plates shall be furnished and installed identifying potential hazards to human safety such as high voltage, pressure, and temperature.
3.7. Information Assurance (IA). The following paragraphs layout the IA Management Plan. (CDRL A006, DI-MGMT-80227, IA Management Plan)
3.7.1. IA Management. The contractor shall maintain appropriate IA management and incorporate tools into system software that provide DoD-approved malware protection/prevention and tracking in accordance with AFI 33-138.
3.7.2. IA Program. The contractor shall perform a virus scan prior to all shipments addressing most current virus scanning software. The Government project engineer shall be notified upon discovery of any virus or malware associated with the equipment being procured.
3.7.3. IA Reporting/Tracking. The Contracting Officer (CO) shall be notified upon discovery of any virus or malware associated with the equipment being procured. Be aware that an IA reporting/tracking process is mandatory for subject procurement. Ensure the following:
3.7.3.1. Malicious Logic. In accordance with AFI 33-138, the contractor and 309 CMXG/EN shall promptly report any incident meeting the requirements as defined in paragraph 5.4, Incidents Defined, to the USAF and cooperate with USAF investigations. Affected assets shall be immediately quarantined. The contractor shall notify the Contracting Officer’s Representative (COR) by telephone within 24 hours upon verification of virus. The contractor shall not perform any remedial action of affected USAF equipment without direction from the CO.
3.7.3.2. Malicious Logic Protection. The contractor shall ensure incoming and outgoing non-volatile storage devices, via utilization of human and technological preventative measures such as good cyber hygiene and virus scanning, are free of malicious logic.
3.7.3.3. Removable Media. The contractor shall ensure all removable media devices (hard drives, thumb drives, CDs, etc.) are free of malicious logic before and after use.
3.8. Life Cycle Sustainment. The overall system design (e.g. components, hardware, software, etc.) shall be reliable, accessible, and maintainable and also allow the Government to competitively select service providers for all future repairs without involving the original manufacturer of the system. Wherever possible, the contractor shall use components that are commercially available, commonly used in comparable industry equipment, interchangeable with other brands, and competitively priced. The ATS system design shall not force the Government into a sole-source condition with the original manufacturer of the system ATS manufacturer when repairs or replacement parts are required. The system design shall not require the Government or a Government contractor to perform any reverse engineering in order to make system repairs.
4. DOCUMENTATION
The Contractor shall provide the following documentation:
4.1. Operation and Maintenance Manual for ATS Test Stands. The contractor shall provide a commercial style operation and maintenance manual that will be evaluated by the Government in accordance with MIL-PRF-32216A. The manual shall include adequate detail to properly operate, maintain, calibrate, and troubleshoot the equipment for an anticipated period of 15 years. The manual shall include calibration instructions. The manual need not include content regarding the installation, shipping, storage, or packaging of the test stand and related equipment. (CDRL A007, TM-86-01P, Technical Manual Contract Requirement (TMCR))The contractor shall provide a commercial style operation and maintenance manual. The manual shall include adequate detail to properly operate and maintain the equipment for an anticipated period of 15 years. The manual shall include calibration instructions. The manual need not include content regarding the installation, shipping, storage, or packaging of the test stand and related equipment. (CDRL A007, TM-86-01P, Technical Manual Contract Requirement (TMCR))
4.2. Test Stand Engineering Data. The contractor shall develop/produce/maintain and deliver a Technical Data Package (TDP) that accurately depicts the final product. The TDP shall represent the approved, tested, and accepted configuration of the defined delivered item(s). TDP data includes, but is not limited to, Computer Aided Design (CAD) data, CAD models, model based definition data sets, Gerber data, Master Bill of Materials (BOM) and parts list, schematics, wiring diagrams, and equipment layout. The TDP shall provide the necessary design, engineering, manufacturing, testing and quality assurance requirements information necessary to enable the procurement or manufacture of an interchangeable item that duplicates the physical and performance characteristics of the original product without additional design engineering effort or recourse to the original design activity. For any third party items procured for this effort, the contractor shall provide the OEM’s original nomenclature, key characteristics, and data sheets as part of the TDP. Vendor Item Control Drawings shall be used to specify the requirements for purchased items when such items have been approved for use in the design and are used without alteration, selection or source qualification (testing of an item prior to procurement action to ensure that it satisfies the specified requirements). All engineering product definition data created using Government funding, as a result of this contract, shall be considered a part of the TDP and shall be delivered to the Government with unlimited rights. The TDP shall be delivered in accordance with Air Force Product Data Specification drawing 9579776 Revision M (CAGE 98752), reference attached DD Form 1423 Block 16. (CDRL A009, DI-SESS-81000, Product Drawings/Models and Associated Lists)
4.2.1. Engineering Data Guidance Conference. The contractor shall support and co-chair a Guidance Conference with AFLCMC/LZPEM for engineering data within 60 days after contract award. The Conference shall be convened at a site and on a date agreed upon by the Government contracting officer and the contractor. The contractor shall prepare an agenda and record the minutes of the Guidance Conference. The contractor shall address, discuss, and provide status on the following: (CDRL A008, DI-ADMN-81249, CDRL A002, Conference Agenda; DI-ADMN-81250, Conference Minutes)
a. Understanding of all CDRL requirements, applicable DIDs, specifications and standards.
b. TDP review requirements and schedules.
c. TDP delivery requirements and schedules.
d. Contractor’s drafting practices/procedures/TDP drawing formats/CAD programs.
e. The contractor's quality assurance procedures relating to TDP documents, including quality control of subcontractor and vendor data.
f. The role of subcontractors and vendors who may deliver TDP documents under this contract.
g. The contractor's configuration management system, including methods for releasing documents, approving documents, and incorporating changes into documents.
h. Digital Technical Data Package (TDP) deliverables.
Note: Guidance Conference may be held in conjunction with other meetings or conferences.
4.2.2. In-Process Review (IPR) of the TDP. The contractor shall host, support, and co-chair an IPR of the engineering drawings and associated lists and other documentation to be included in the TDP. The IPR shall be conducted only after the contractor's quality assurance personnel have completely reviewed the data and determined that data are of sufficient quality that Government time will be effectively utilized during the review. IPR may be scheduled when data has reached the 50% percent completion point and shall be held, when possible, in conjunction with other reviews (i.e., PDR, CDR). The contractor shall notify AFLCMC/LZPEM a minimum of 30 days prior to the anticipated date of completion point. The IPR shall focus on the contractor's progress in the preparation of the TDP. The contractor shall support and provide the necessary resources, i.e., meeting agenda, conference room, applicable data, minutes, and appropriate personnel available to answer any questions to perform the IPR effectively. The contractor shall correct all discrepancies identified in the IPR. All subcontractor/vendor data shall be made available for review. If the quantity of subcontractor/vendor data is of sufficient magnitude, the Government may schedule a separate IPR at the subcontractor's/vendor's facility. (CDRL A008, DI-ADMN-81249, CDRL A002, Conference Agenda; DI-ADMN-81250, Conference Minutes)
a. Understanding of all CDRL requirements, applicable DIDs, specifications
b. and standards.
c.
b. TDP review requirements and schedules.
d.
e. c TDP delivery requirements and schedules.
f. d. Contractor’s drafting practices/procedures/TDP drawing formats/CAD programs.
g. e. The contractor's quality assurance procedures relating to TDP documents, including quality control of subcontractor and vendor data.
h. f. The role of subcontractors and vendors who may deliver TDP documents under this contract.
i. g. The contractor's configuration management system, including methods for releasing documents, approving documents, and incorporating changes into documents.
j. h. Digital Technical Data Package (TDP) deliverables.
Note: Guidance Conference may be held in conjunction with other meetings or conferences.
4.2.3. In-Process Review (IPR) of the TDP. The contractor shall host, support, and co-chair an IPR of the engineering drawings and associated lists and other documentation to be included in the TDP. The IPR shall be conducted only after the contractor's quality assurance personnel have completely reviewed the data and determined that data are of sufficient quality that Government time will be effectively utilized during the review. IPR may be scheduled when data has reached the 50% percent completion point and shall be held, when possible, in conjunction with other reviews (i.e., PDR, CDR). The contractor shall notify AFLCMC/LZPEM a minimum of 30 days prior to the anticipated date of completion point. The IPR shall focus on the contractor's progress in the preparation of the TDP. The contractor shall support and provide the necessary resources, i.e., meeting agenda, conference room, applicable data, minutes, and appropriate personnel available to answer any questions to perform the IPR effectively. The contractor shall correct all discrepancies identified in the IPR. All subcontractor/vendor data shall be made available for review. If the quantity of subcontractor/vendor data is of sufficient magnitude, the Government may schedule a separate IPR at the subcontractor's/vendor's facility. (CDRL A008, DI-ADMN-81249, CDRL A002, Conference Agenda; DI-ADMN-81250, Conference Minutes)
4.2.4. Drawing Package for the Process Air System for Pneumatic Component Testing. The contractor shall produce a commercial style drawing package that accurately depicts the final installed product as described in PD #002. Additionally, the contractor shall provide drawing updates for any configuration changes made during the warrantee period. The drawing package shall be adequate to allow the Government the ability to competitively maintain the equipment for an anticipated period of 15 years without involving the original contractor. (CDRL A009, DI-SESS-81000)
4.2.5. Drawing Package for 300 psi Air System. The contractor shall produce a commercial style drawing package that accurately depicts the final installed product as described in PD #003. Additionally, the contractor shall provide drawing updates for any configuration changes made during the warrantee period. The drawing package shall be adequate to allow the Government the ability to competitively maintain the equipment for an anticipated period of 15 years without involving the original contractor. (CDRL A009, DI-SESS-81000)
4.2.6. Relationship of Contractor with Subcontractors/Vendors. The contractor shall levy on sub-contractors and sub-vendors the same requirements for Technical Data Packages (TDPs) as are levied on them by this contract. This requirement shall apply at all tiers of sub-contractor/vendor levels associated with the program.
4.2.7. Engineering Data Updates and Revisions. The contractor shall (and shall cause subcontractors and vendors to) update and maintain engineering data for the item(s) designed/ developed/modified/produced and funded by this contract for the life of this contract and shall incorporate all changes in accordance with the following:
a. All engineering changes shall be incorporated into the applicable engineering data within 90 days after engineering release/Air Force concurrence or at intervals of five changes, whichever occurs first, except a change involving safety, which shall be incorporated immediately.
b. All engineering changes shall be incorporated into the applicable engineering data prior to delivery of data for review.
c. All engineering changes shall be incorporated into the applicable engineering data prior to delivery of final media.
d. Revisions to existing engineering drawings/models and associated lists and other documentation to be included in the TDP for which the contractor is the current design activity shall result in the delivery of the entire revised document and associated data file. For example, when a portion of a document is revised the entire document shall be delivered.
4.3. Commercial Parts. The Contractor shall provide commercial literature (i.e. data sheets) for all major commercial of-the-shelf components (i.e. motors, flow meters, pressure transducers, compressors, power supplies, etc.). (CDRL A010, DI-TMSS-80527C, Evaluated according to MIL-PRF-32216, Commercial Off-The-Shelf (COTS) Manual and Supplemental Data)
4.4. Calibration quality standard. Calibration quality standard and traceability with calibration measurement requirement summary (CMRS).
4.5. Calibration Quality Standard and Traceability. With Calibration Measurement Requirement Summary (CMRS) for ATS Test Stands. The contractor shall ensure the developed system is capable of being calibrated and its calibration is verified in accordance with Air Force Metrology and Calibration (AFMETCAL) requirements. Calibration and measurement traceability shall be identified and documented in accordance with MIL-STD-1839D. MIL-HDBK-1839C shall be used for interpretive guidance to clarify requirements invoked by MIL-STD-1839D. The contractor shall provide a means to perform calibration to meet these requirements. The contractor shall provide all proprietary/unique software and peculiar/special hardware required to perform calibration and calibration verification. The contractor shall develop and deliver a system calibration procedure verifying system performance to the performance specification contained within this purchase specification. The contractor shall deliver the CMRS in accordance with CDRL A011, DI-QCIC-80278C, Calibration and Measurement Requirements Summary (CMRS).
4.5.1. Special Hardware/Software Licenses Requirements. Any special equipment, fixtures, tools, standards etc. required for calibration, and not common to a secondary calibration laboratory, must be supplied. Any unique accessories including software required for calibration of this item shall be furnished by the manufacturer. All special hardware, or software, used to adjust calibration items, shall be included with the test stand. A list of peripheral support TDME equipment required to accomplish the calibration/alignment/adjustments of the unit must be provided with the Air Turbine Starter (ATS) test stand. Any unique accessories including software required for calibration of this item shall be furnished by the manufacturer.
4.6. Acceptance Test Plan and Report. The contractor shall provide an Acceptance Test Plan (ATP) that includes an Acceptance Test Report (ATR) provided in the contractor’s format in accordance with CDRL A012 and CDRL A013. This plan shall outline procedures for providing objective evidence that the new test equipment meets each requirement outlined in this purchase specification. This plan shall be provided to the Government representative 10 days in advance of the scheduled tests to allow opportunity for review and feedback. The ATP shall contain the following critical events: (CDRL A012, DI-NDTI-80566A, Test Plan and CDRL A013, DI-NDTI-80809B, Test Report)
4.6.1. Physical Configuration Audit. The Government and the contractor shall conduct a Physical Configuration Audit jointly (at the contractor’s facility) with the Government chairing the audit. The Physical Configuration Audit shall verify the drawings reflect the “as built” configuration of all developed or modified portions of the hardware. A product baseline shall be established upon completion of and Government acceptance of the Physical Configuration Audit Plan. A complete preliminary copy of the drawing package shall be delivered 15 days prior to the Physical Configuration Audit Report. (CDRL A014, DI-SESS-81646B, Physical Configuration Audit (PCA) Plan and CDRL A015, DI-SESS-81022D, Physical Configuration Audit (PCA) Plan)
4.7. Computer Program Identification Number (CPIN). The contractor shall request a CPIN number and imbed it in the executive software such that the CPIN number and revision are visible to an operator or calibration technician. The contractor shall provide two copies of the install disk for the executive software. Each disc (CD or DVD) shall be labeled with the following information: CPIN number, Revision, Date, Classification, Units (e.g. 1 of 1, 1 of 2, etc.) and the Title. (CDRL A016, DI-MISC-81454C, Automated Computer Program ID Number (ACPIN) Data and Control Record) e.
f.
g.
h.
Commercial Parts. The Contractor shall provide commercial literature (i.e. data sheets) for all major commercial of-the-shelf components (i.e. motors, flow meters, pressure transducers, compressors, power supplies, etc.). (CDRL A018, DI-TMSS-80527C, Evaluated according to MIL-PRF-32216, Commercial Off-The-Shelf (COTS) Manual and Supplemental Data) Calibration Quality Standard and Traceability – With Calibration Measurement Requirement Summary (CMRS) for ATS Test Stands. The contractor shall ensure the developed system is capable of being calibrated and its calibration is verified in accordance with Air Force Metrology and Calibration (AFMETCAL) requirements. Calibration and measurement traceability shall be identified and documented in accordance with MIL-STD-1839D. MIL-HDBK-1839C shall be used for interpretive guidance to clarify requirements invoked by MIL-STD-1839D. The contractor shall provide a means to perform calibration to meet these requirements. The contractor shall provide all proprietary/unique software and peculiar/special hardware required to perform calibration and calibration verification. The contractor shall develop and deliver a system calibration procedure verifying system performance to the performance specification contained within this purchase specification. The contractor shall deliver the CMRS in accordance with CDRL A010. (CDRL A010, DI-QCIC-80278, Calibration and Measurement Requirements Summary (CMRS)) Special Hardware/Software Licenses Requirements. Any special equipment, fixtures, tools, standards, software, etc. required for calibration and not common to a secondary calibration laboratory shall be supplied.
4.3. Acceptance Test Plan and Report. The contractor shall provide an Acceptance Test Plan (ATP) that includes an Acceptance Test Report (ATR) provided in the contractor’s format in accordance with CDRL A011 and CDRL A012. This plan shall outline procedures for providing objective evidence that the new test equipment meets each requirement outlined in this purchase specification. This plan shall be provided to the Government representative in advance of the scheduled tests to allow opportunity for review and feedback. The ATP shall contain at a minimum a functional configuration audit, a physical configuration audit, simulated fault insertion demonstrating possible abnormal test conditions, and verification of test capability for all UUTs. (CDRL A011, DI-NDTI-80566, Test Plan and CDRL A012, DI-NDTI-80809, Test Report) Physical Configuration Audit. The Government and the contractor shall conduct a Physical Configuration Audit jointly (at the contractor’s facility) with the Government chairing the audit. The Physical Configuration Audit shall verify the drawings reflect the “as built” configuration of all developed or modified portions of the hardware. A product baseline shall be established upon completion of and Government acceptance of the Physical Configuration Audit Plan. A complete preliminary copy of the drawing package shall be delivered 15 days prior to the Physical Configuration Audit Report. (CDRL A013, DI-SESS-81646, Physical Configuration Audit (PCA) Plan and CDRL A014, DI-SESS-81022, Physical Configuration Audit (PCA) Plan) Computer Program Identification Number (CPIN). The contractor shall request a CPIN number and imbed it in the executive software such that the CPIN number and revision are visible to an operator or calibration technician. The contractor shall provide two copies of the install disk for the executive software. Each disc (CD or DVD) shall be labeled with the following information: CPIN number, Revision, Date, Classification, Units (e.g. 1 of 1, 1 of 2, etc.) and the Title. (CDRL A015, DI-MISC-81454C, Automated Computer Program ID Number (ACPIN) Data and Control Record)
5. DATA DELIVERABLES
The contractor shall provide a technical data package as stated in Table 51 Technical data package:
Table 51 Technical data package
| Deliverable |
| CDRL# |
| DID |
| Reference |
| Contractor's Progress, Status and Management Report |
| A001 |
| DI-MGMT-80227 |
| 3.2.2 |
| Post Award Conference Minutes |
| A002 |
| DI-ADMN-81250B |
| 3.2.3.2 |
| Preliminary Design Review (PDR) Minutes |
| A002 |
| DI-ADMN-81250B |
| 3.2.3.3 |
| Intermediate Design Reviews (IDR) Minutes |
| A002 |
| DI-ADMN-81250B |
| 3.2.3.4 |
| Critical Design Review (CDR) Minutes |
| A002 |
| DI-ADMN-81250B |
| 3.2.3.5 |
| Factory Acceptance Test (FAT) Plan |
| A003 |
| DI-NDTI-80566A |
| 3.2.3.6 REF _Ref464043180 \r \h \* MERGEFORMAT 3.3 |
| Item Unique Identification (IUID) Marking/Labeling Plan |
| A004 |
| DI-MGMT-81803 |
| 3.5.1 REF _Ref442875453 \r \h 3.6.1 |
| IUID Marking Activity and Verification Report |
| A005 |
| DI-MGMT-81804A |
| 3.5.2 REF _Ref442875459 \r \h 3.6.2 |
| Information Assurance (IA) Management PlanIA Management Plan |
| A006 |
| DI-MGMT-80227 |
| 3.7 REF _Ref511795106 \r \h 3.8 |
| Technical Manual Contract Requirement (TMCR) |
| A007 |
| TM-86-01P |
| 4.1 |
| Product Drawings/Models and Associated Lists |
| A009 |
| DI-SESS-81000E |
| 4.2, 4.2.3, 4.2.4 |
| Conference Agenda (Engineering Data Guidance) |
| A008 |
| DI-ADMN-81249 |
| 4.2.1 REF _Ref473807543 \r \h \* MERGEFORMAT 4.2.1 |
| Conference Minutes (Engineering Data Guidance) |
| A002 |
| DI-ADMN-81250B |
| 4.2.1 REF _Ref473807543 \r \h \* MERGEFORMAT 4.2.1 |
| Conference Agenda (IPR) of the TDP |
| A008 |
| DI-ADMN-81249 |
| 4.2.2 REF _Ref473807790 \r \h \* MERGEFORMAT 4.2.2 |
| Conference Minutes (IPR) of the TDP |
| A002 |
| DI-ADMN-81250B |
| 4.2.2 REF _Ref473807790 \r \h \* MERGEFORMAT 4.2.2 |
| Commercial Off-The-Shelf (COTS) Manual and Supplemental Data) |
| A010 |
| DI-TMSS-80527C |
| 4.3 |
| Calibration and Measurement Requirements Summary (CMRS) |
| A010A011 |
| DI-QCIC-80278C |
| 4.4 REF _Ref473618781 \r \h \* MERGEFORMAT 4.4 |
| Acceptance Test Plan (ATP) |
| A011A012 |
| DI-NDTI-80566A |
| 4.6 REF _Ref473618806 \r \h \* MERGEFORMAT 4.5 |
| Acceptance Test Report (ATR) |
| A012A013 |
| DI-NDTI-80809B |
| 4.6 REF _Ref473618806 \r \h \* MERGEFORMAT 4.5 |
| Physical Configuration Audit (PCA) Plan |
| A013A014 |
| DI-SESS-81646B |
| 4.6.1 REF _Ref473808229 \r \h \* MERGEFORMAT 4.5.1 |
| Physical Configuration Audit (PCA) Report |
| A014A015 |
| DI-SESS-81022D |
| 4.6.1 REF _Ref473808229 \r \h \* MERGEFORMAT 4.5.1 |
| Automated Computer Program ID Number (ACPIN) Data and Control RecordAutomated Computer Program ID Number (ACPIN) Data and Control Record (ACPIN) Data and Control Record |
| A015A016 |
| DI-MISC-81454C |
| 4.7 REF _Ref473808435 \r \h \* MERGEFORMAT 4.6 |
| Safety Program |
| A016A017 |
| DI-SAFT-81626 |
| APPENDIX C Section I - A |
| Mishap Notification |
| A017A018 |
| DI-SAFT-81563 |
| APPENDIX C Section I - B |
| Commercial Off-The-Shelf (COTS) Manual and Supplemental Data |
| A018 |
| DI-TMSS-80527C |
| REF _Ref496098763 \r \h 4.3 |
6. GOVERNMENT FURNISHED EQUIPMENT (GFE)
6.1. Assets Loaned by the Government. The Government will furnish the assets listed in Appendix B for the purpose of test stand development and Factory Acceptance Testing. These parts will be delivered to the contractor as soon as possible after the Post Award Conference.
6.2. GFE Protection. The contractor shall protect all GFE by keeping it in a secured facility when not in use.
6.3. Damage Reporting. The contractor shall report any suspected damage of GFE to the Government Representative within 24 hours.
6.4. Shipping of GFE. The Government will be responsible for all costs associated with shipping of the GFE to the contractor, and the contractor shall be responsible for all costs associated with shipping of the GFE to the Government.
7. AVAILABLE FACILITY SERVICES. The following facility services will be made available to the Contractor. It shall be the responsibility of the Contractor to route new piping, cables, conduit, hangers, insulation, etc. from the existing facility connection points. If insufficient facility services are available, it shall be the responsibility of the Contractor to install and modify the facility after written approval from, and coordination with, the Government’s technical representative. This includes the removal, and installation, of any transformers required.
7.1. Electrical.
7.1.1. There are currently two transformers, TR-1 and TR-2, of 4160 VAC, 3 Phase, 60 Hz, 1500kVA (each), which shall not be reused.
7.1.2. There are currently two transformers, TR-1 and TR-2, of 4160 VAC, 3 Phase, 60 Hz. Each transformer is 1500kVA.
7.1.2.1. If more power is needed than what is available, the contractor shall purchase new transformers, and all necessary equipment, to provide the required power to the new ATS test stands and air system. The contractor is not responsible for the installation of the new transformers and exterior wiring. The contractor shall coordinate with base CE and the current contractor responsible for exterior electrical installations. The contractor shall be responsible for the installation of the distribution panel and all internal wiring.
7.1.2.2. The 4160V power shall not be reused. If more power is needed than what is available, the contractor shall purchase new transformers, and all necessary equipment, to provide the required power to the new ATS test stands and air system.
7.1.2.3. If more power is needed, the contractor shall provide transformers that produce a maximum of 480 VAC, 3 Phase, 60 Hz power.
7.1.2.4. The contractor is not responsible for the installation of the transformers and exterior wiring. The contractor shall be responsible for the installation of the distribution panel and all internal wiring.
7.1.2.5. If necessary, the contractor shall provide transformers that produce a maximum of 480 VAC, 3 Phase, 60 Hz power.
7.1.3. 480 VAC, 3 Phase, 60 Hz.
7.1.4.
7.1.5. Existing test stands in Rooms 103, 104, and 105 each currently have dedicated 30A breakers.
7.1.5.1. See Appendix D for further detail on the available 480V. Any 480V used in the current ATS test stands, and its air system, can be reused for the future system.
7.1.6. 120 VAC, 60 Hz, Rooms 103, 104, and 105 each currently have dedicated 20A breakers. Additional 20A breakers are available.
7.2. Shop Air. 100 psig, 1/2” pipe size
7.3. Cooling Water. Not available.
7.4. Natural Gas. Natural gas line to existing furnace is available.
8. ACCESS TO FACILITIES AND PROPERTY. The Contracting Officer will assist with security and access requirements. To obtain access to Hill Air Force Base (AFB), each employee will need to have (or be escorted by a person that has) a base entrance pass. Contractor shall provide a list to the Government Representative not less than 7 business days prior to the date access to the base is required. The list will be computer generated or typed and organized alphabetically by the visitor’s last name. The list will include last name, first name, driver’s license number, and state listed on license of all guests that will need access. The Pass and Registration Office is open from 0800-1600, Monday thru Thursday and 0800 -1530 on Friday and is located in Building #408, 5830 F Ave, Hill AFB.
9. DATA RIGHTS
9.1. The The contractor shall provide unlimited data rights to all data and Software produced/developed as a result of this contract and shall provide government purpose rights for data and software developed prior to award of this contract as asserted in any Data Rights Assertion Table, or if none, then as described in the Statement of Work or elsewhere in the contract. The delivery of data and software as described the Technical Data Package (TDP) and deliverables (CDRLs) shall include, but are not limited to: all software, source code, CAD files, CAD models, schematics, wiring diagrams, Gerber files, and equipment layout. The contractor shall comply with those contract clauses and definitions with respect to the government rights in technical data and software and CDRLs shall conform with DFARS 252.227-7013 and DFARS 252.227-7014, including any other applicable contact clause referenced or intended to be referenced in the contract.contractor shall provide unlimited rights to all data produced as a result of this contract and shall provide government purpose rights for data developed prior to award of this contract. This includes, but is not limited to, all software, source code, CAD files, CAD models, schematics, wiring diagrams, Gerber files, and equipment layout.
10. WARRANTY
10.1. Warrant commencement.
10.2. The contractor shall provide a written warranty document which shall commence after commissioning of all equipment and acceptance of all data deliverables. The document shall describe in detail the terms and timeline of the warranty, as well as outline the process for making warranty claims. The document shall prepared in the contractor’s preferred format.
10.3. Length of warranty. The test stand shall come with a written industry standard two (2) year warranty starting at the date of final acceptance.
10.4. Replacement of defective parts. During this warranty period, the contractor shall be responsible for the replacement of any defective parts, systems or software, the failure of which is due to faulty materials, workmanship, design or inadequate service life. Components normally consumed during this period, e.g. filters, shall be excluded from this requirement.
10.5. Warranty certificate. The warranty certificate shall contain at a minimum, the following information:
a. Part numbers/serial numbers of the new test systems
b. Contract number
c. Warranty start and end date
d. The contractor’s contact information
e. Explanation of warranty coverage
Appendix A. ACRONYMNS AND ABBREVIATIONS
| AFB |
| Air Force Base |
| AFMAN |
| Air Force Manual |
| AFMETCAL |
| Air Force Metrology and Calibration |
| ATP |
| Acceptance Test Plan |
| ATR |
| Acceptance Test Report |
| ATS |
| Air Turbine Starter |
| CDR |
| Critical Design Review |
| CDRL |
| Contract Data Requirements List |
| COR |
| Contracting Officer Representative |
| CMRS |
| Calibration and Measurement Requirement Summary |
| CPIN |
| Computer Program Identification Number |
| DID |
| Data Item Description |
| DoD |
| Department of Defense |
| FAT |
| Factory Acceptance Test |
| FCA |
| Functional Configuration Audit |
| FTP |
| File Transfer Protocol |
| GFE |
| Government Furnished Equipment |
| IA |
| Information Assurance |
| IDR |
| Intermediate Design Review |
| IUID |
| Item Unique Identification |
| NSN |
| National Stock Number |
| OSHA |
| Occupational Safety and Health Administration |
| PCA |
| Physical Configuration Audit |
| PCO |
| Procuring Contracting Officer |
| PD |
| Purchase Description |
| PDR |
| Preliminary Design Review |
| SOW |
| Statement of Work |
| TBD |
| To Be Determined |
| TMCR |
| Technical Manual Contract Requirements |
| TOC |
| Table of Contents |
| USAF |
| United States Air Force |
| UUT |
| Unit Under Test |
Appendix B. GOVERNMENT FURNISHED EQUIPMENT (GFE)
| Part Number |
| Description |
| NSN |
| Qty |
| Unit Price |
| 356660-1-5 |
| ATS100-138 |
| 2995-00-492-1489 |
| 1 |
| $31,294.53 |
| 353719-80 |
| Mounting Adapter 138 |
| 2995-00-015-8722 |
| 1 |
| $181.98 |
| 4371-672M |
| V-Clamp 138,97,440 |
| 5342-01-010-5951 |
| 1 |
| $34.30 |
| 383694-1-3 |
| ATS100-302 |
| 2995-00-998-5303 |
| 1 |
| $71,032.55 |
| 284850-1-1 |
| ATS100-302 Adapter |
| 4920-00-760-9637 |
| 1 |
| $1,388.00 |
| 3505124-6-1 |
| ATS100-97C |
| 2995-01-277-9247 |
| 1 |
| $44,770.68 |
| 353992 |
| Mounting Adapter 97C |
| 2995-00-675-3013 |
| 1 |
| $999.66 |
| 4371-672M |
| V-Clamp 138,97,440 |
| 5342-01-010-5951 |
| 1 |
| $34.30 |
| 39-26802-501 |
| Seal, Starter Exhaust |
| 5330-00-545-8165 |
| 1 |
| 53.37 |
| 39-26817-1 |
| Retainer, Starter Exhaust Seal |
| 1560-00-377-7501 |
| 1 |
| 39.01 |
| 39-26817-2 |
| Retainer, Starter Exhaust Seal |
| 1560-00-377-7587 |
| 1 |
| 14.68 |
| 39-26817-501 |
| Retainer |
| 1560-00-531-6105 |
| 1 |
| 54.64 |
| NAS602-9P |
| Screw, Machine |
| 5305-00-995-2117 |
| 10 |
| 5.97 |
| MS21042L08 |
| Nut, Self-Locking, Hexagon |
| 5310-00-807-1473 |
| 10 |
| 18.66 |
| 3505188-4-1 |
| ATS100-395B |
| 2995-01-048-9580 |
| 1 |
| $28,859.03 |
| 36E84-18QF |
| 36E84-18QF |
| 2995-01-194-8153 |
| 1 |
| $26,668.92 |
| 5883229-101 |
| Mounting Adapter 18QF, 2QC |
| 2995-01-011-0841 |
| 1 |
| $563.78 |
| 2483677 |
| V-Clamp 18QF |
| 5342-00-159-3980 |
| 1 |
| $84.58 |
| 2495990 |
| Drive Coupling 18QF |
| 2925-01-148-7646 |
| 1 |
| $722.57 |
| 3505672-1 |
| ATS100-421 |
| 2995-01-227-6650 |
| 1 |
| $26,668.92 |
| 3505230-1-1 |
| ATS100-422 |
| 2995-00-337-5116 |
| 1 |
| $26,668.92 |
| 36E153-6E |
| 36E153-6E |
| 2995-01-140-2105 |
| 1 |
| $34,252.71 |
| U8773 |
| Mounting Adapter 6E |
| 4920-01-250-5521 |
| 1 |
| 2496839 |
| Drive Coupling |
| 2995-01-151-7673 |
| 1 |
| $834.54 |
| 3505492-5-2 |
| ATS100-440 |
| 2995-01-187-4162 |
| 1 |
| $36,374.32 |
| A51895/4-300S |
| Inlet Clamp 440 |
| 5342-01-160-2368 |
| 1 |
| MS20392-5P31 |
| Inlet Gasket 440 |
| 5330-01-472-4535 |
| 1 |
| 3505492-6-2 |
| ATS100-440 |
| 2995-01-187-4163 |
| 1 |
| $37,224.52 |
| A51895/4-300S |
| Inlet Clamp 440 |
| 5342-01-160-2368 |
| 1 |
| MS20392-5P31 |
| Inlet Gasket 440 |
| 5330-01-472-4535 |
| 1 |
| 36E165-2QC |
| 36E-84-2QC |
| 2995-01-329-6341 |
| 1 |
| $26,668.92 |
| 5883229-101 |
| Mounting Adapter 18QF, 2QC |
| 2995-01-011-0841 |
| 1 |
| $563.78 |
| 57149-20 |
| V-Clamp 2QC |
| 5342-00-159-3980 |
| 1 |
| $37.02 |
| 2499838 |
| Drive Coupling 2QC |
| 3010-01-384-1074 |
| 1 |
| $903.13 |
Appendix C.
SAFETY, FIRE PROTECTION AND HEALTH
SPECIFICATION
INDUSTRIAL SAFETY REQUIREMENTS
OGDEN AIR LOGISTICS COMPLEX
UNITED STATES AIR FORCE
HILL AIR FORCE BASE, UTAH 84056
BUILDING 240 Air Turbine Starter Test Stands
DATE 16 Aug 2016 Prepared by:
Tim Helms
OO-ALC/SE
801-586-6038
Control Number: TH160805
SECTION I - GENERAL REQUIREMENTS
A. Safety Program Requirements.
The contractor will implement a safety program plan that ensures protection of Government…