Questions_for_Offerors_on_Metal_Plating_IDIQ.pdf

PDF 278 KB Posted

Attached to
Metal Plating MAC IDIQ Federal contract opportunity
Solicitation number
FA8224-18-R-0005
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Questions for Offerors

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions for potential Offerors on Metal Plating IDIQ

1. How often do you sample the chemistry of your electroplating tanks?

2. How do you track all the chemical testing and physical testing that is required in order to keep the plating processes in compliance with all of the different customer’s specifications?

3. What actions would your company take if one of your chromium plating tanks failed an adhesion test?

4. What actions would your company take if your cadmium plating tank failed an embrittlement test?

5. Many of the missiles components are high strength steel (above 180 ksi) which would preclude the use of brighteners in the cadmium plating tank. Does your company have a cadmium plating tank that meets the requirements of AMS-QQ-P-416 and does not have brighteners?

6. Two examples of components that need processing are the cylinder actuator (PN 25-66903) which is 12” external diameter, 110” long and 9.5” internal diameter; and the rocker arm multiplying linkage (25-73667) which is 20” by 10” by 8”. The cylinder actuator requires chromium plating and grinding on most of the 9.5” internal diameter and the rest of the surfaces (internal and external) require cadmium plating. The rocker arm multiplying linkage has several through holes of 3-4” diameter that are circular or oblong that need electroless nickel followed by chrome plating over the electroless nickel. Please submit the maximum size component (in dimension and weight) that your company can handle for each of the processes described in paragraphs 3.1.5 through 3.1.14 of the Metal Plating Basic IDIQ SOW.

7. What type of bake ovens will be used for embrittlement relief after electroplating? Are they certified to AMS2750?

8. What quality systems do you adhere to? (NADCAP, ISO9000 etc.) If the quality system is industry recognized, please furnish copies of your current quality systems certifications.

9. Does your company maintain any other relevant professional certifications? If so, please furnish copies of your current professional certifications.

10. If you subcontract to other vendors to complete a portion of the work, how do you flow down quality requirements; i.e. –how do you ensure that subcontracted vendors still adhere to a minimum quality standard as required in this contract?

11. What material handling methods (transport and protection) do you use for transport of components in-house?

12. What type of external shipping methods will your company be using to meet the needs of this contract?

PLEASE PROVIDE RESPONSES TO THE QUESTIONS ABOVE ON THE COMMENT RESOLUTION MATRIX

PLEASE PROVIDE RESPONSES TO THE QUESTIONS BELOW ON THE COMMENT RESOLUTION MATRIX

File details come from the government source that posted it.