Q A_for_Amendment_0003.docx

DOCX document 33 KB Posted

Attached to
T-38C Avionics Component Integration and Contractor Logistics Support Federal contract opportunity
Solicitation number
FA8211-15-R-0001
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Q A for Amendment 0003

View the file

Other files for this federal contract opportunity

Other files attached to T-38C Avionics Component Integration and Contractor Logistics Support, newest first.
File Type Posted
Contract_Award_Synopsis_for_FA8211-16-D-0001_Rev_01_AVCI.docx DOCX document
Q A_dated_4-20-2015.docx DOCX document
Q A_dated_4-15-2015.docx DOCX document
Q A_for_Amendment_0007.docx DOCX document
ATTACHMENT_11B_Non_CBA_WDs_Garfield_Oklahoma.pdf PDF
ATTACHMENT_11D_Non_CBA_WDs_StMarys_Maryland.pdf PDF
FA821115R0001_______0006.pdf PDF
FA821115R0001_______0005.pdf PDF
FA821115R0001_______0004.pdf PDF
ATTACHMENT_6A_T-38_AvCI_FFP_Labor_Rates_Worksheet_Revision_02.xlsx XLSX spreadsheet
ATTACHMENT_6B_Total_Evaluated_Price_TEP_Worksheet_Revision_03.xlsx XLSX spreadsheet
RFP_Bidder_List_Cover_Letter_Rev_01.docx DOCX document
PPI_tool.accdb —
CBA_-_2015.pdf PDF
FA821115R0001_______0002.pdf PDF
ATTACHMENT_6B_Total_Evaluated_Price_TEP_Worksheet_Revision_02.xlsx XLSX spreadsheet
Software_Library_Review_Request.docx DOCX document
ATTACHMENT_6B_Total_Evaluated_Price_TEP_Worksheet_Revision_01.xlsx XLSX spreadsheet
Q A_for_Amendment_1.docx DOCX document
ATTACHMENT_6C_Labor_Categories_Mapping_Worksheet_Revision_01.xlsx XLSX spreadsheet
ATTACHMENT_2_MDP_SOO_Revision_01.pdf PDF
FA821115R0001_______0001.pdf PDF
ATTACHMENT_5_VHF_SOO_Revision_01.pdf PDF
ATTACHMENT_6A_T-38_AvCI_FFPLabor_Rates_Worksheet_Revision_01.xlsx XLSX spreadsheet
ATTACHMENT_12_Section_L_Revision_01.pdf PDF
ATTACHMENT_L-2_Labor_Category_Definitions_Revision_01.pdf PDF
ATTACHMENT_15_DDFORM_1653.pdf PDF
ATTACHMENT_7C_CDRLs_X031_X045.pdf PDF
ATTACHMENT_6B_Total_Evaluated_Price_TEP_Worksheet.xlsx XLSX spreadsheet
ATTACHMENT_6A_T-38_AvCI_FFPLabor_Rates_Worksheet.xlsx XLSX spreadsheet
ATTACHMENT_6C_LaborCategoriesMappingWorksheet.xlsx XLSX spreadsheet
ATTACHMENT_2_MDP_SOO.pdf PDF
ATTACHMENT_L-2_Labor_Category_Definitions.pdf PDF
ATTACHMENT_8A_GFP_List.pdf PDF
ATTACHMENT_L-5_Past_Performance_Questionnaire.pdf PDF
Synopsis_of_FA8211-15-R-0001_AVCI.docx DOCX document
ATTACHMENT_L-5_Past_Performance_Questionnaire.pdf PDF
ATTACHMENT_L-2_LaborCategoryDefinitions.pdf PDF
ATTACHMENT_11E_Non_CBA_WDs_Wichita_Texas.pdf PDF
ATTACHMENT_11B_Non_CBA_WDs_Garfield_Oklahoma.pdf PDF
ATTACHMENT_L-3_Client_Authorization_Letter.pdf PDF
ATTACHMENT_13_SECTION_M.pdf PDF
ATTACHMENT_9_AvCI_TMCR.pdf PDF
ATTACHMENT_4_ADS-B_SOO.pdf PDF
ATTACHMENT_L-1_Solicitation_Cross_Reference_Matrix.pdf PDF
ATTACHMENT_8_GFE_List.pdf PDF
ATTACHMENT_11C_Non_CBA_WDs_Lowndes_Mississippi.pdf PDF
ATTACHMENT_12_SECTION_L.pdf PDF
ATTACHMENT_2_MDP_SOO.pdf PDF
ATTACHMENT_7C_CDRLs_A031-A045.pdf PDF
Show all 50

T-38C Avionics Component Integration and Contractor Logistics Support has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

10 March 2015

List of Questions

Doc Name

Section
Description
Page #
Question / Comment / Recommendation
1
Attachment 6B Total Evaluated Price (TEP) Worksheet
-
-
-
Attachment 6B: Are the fiscal years listed in row 3 based U.S. Government fiscal years (Oct - Sept)? If so, does the CLIN pricing provided need to be based on U.S. Govt fiscal years or the periods of performance specified in row 2 & should the other set of dates be deleted from the table for clarity?

Government Response: The Period of Performance is as stated in row two of the Total Evaluated Price (Attachment 6B), which is also within the same fiscal years stated in row three. The CLIN Pricing needs to be based on the Period of Performance dates in row two.

2
Attachment 6B Total evaluated Price (TEP) Worksheet
-
-
-
The fields for CLIN X0004 AA-AE are highlighted in yellow indicating pricing is required, but the Government's Response to Question 1 in the Amendment 1 Q&A document states "There is no requirement to address the VHF Communication/Navigation Radios within the proposal." Please

confirm if pricing for CLIN X0004 AA-AE is to be provided. If not, should the corresponding fields in the table be changed from yellow to gray or otherwise specified as not applicable?

Government Response: Pricing is to be provided on the Total Evaluated Price (Attachment 6B), but there is no information required as it relates to Technical Sub-Factor One.

3
Section L
-
-
-
Section L: In Article 8 addressing labor rates subject to Collective Bargaining Agreements (CBA), the instructions on page 15 state "Offerors shall use basic year CBA labor rates for all years of the contract, even if there are negotiated CBA rates for contract years 2 and beyond." Please clarify if "basic year" is in reference to the CBA itself or Attachment 6B. If the CBA, are the rates in the Current Rate column the correct set of rates to use? If Attachment 6B, are the Oct 2016 rates the correct set?

Government Response: Section J, Attachment 6A, Labor Rate Worksheet has been revised to provide clarity to the rates governed by the CBA. Note 10 has been revised stating “The current FY16 rates prepopulated below”. The rates for Field Service Representative (CBA) and Material Coordinator (CBA) have been prepopulated.

4
SOO’s for MDP, HUD, ADS-B, and VHF
-
-
-
For the MDP SOO and other SOOs

The Solicitation Cross Reference Matrix calls out Column Section L for 5.3.1 Item 3 Bullet E. and Architecture Diagrams under Work Requirement

However 5.3.1 number 3 states “Provide a proposed replacement, overhaul or refurbishment solution addressing the entire modification cycle, to include:” while E. states “Identify and explain the processes, procedures or company “Best Practices” that ensure compliance and or demonstrate compliance with AS 9100C.”.

Question: Should the cross reference matrix be designated Bullet D and the industry certifications which are to related to quality management systems to be designated Bullet E?

Government Response: The Architecture Diagrams line has been deleted. Please see the cross reference matrix revision 01. (The original cross reference matrix that was posted was posted in error. There are many changes to revision 01to reflect the matrix that was supposed to have been posted originally)

5
MDP SOO
-
-
-
The MDP SOO. The cross reference matrix for MDP has work requirement Architecture Diagrams with document/paragraph 6.2, 6.4.2 which read as follows:

6.2 Platform Information Assurance The Contractor shall provide information and technical support during the development of the update to USAF Platform Information Technology (PIT), Architecture Analysis Report (AAR) for the T-38C Talon. (CDRL A039) and

6.4.2 The contractor shall maintain and update as required for certification currency all T-38C CNS/ATM documentation throughout the period of performance in accordance with AFI63-137. At a minimum, CNS/ATM documentation consists of the following: (CDRL A015) A. T-38C Data Quality Requirements (DQR) B. T-38C Navigation Data Chain Architecture C. T-38C Navigation Data Chain Compliance Plan D. T-38C Tailored RNAV Matrix E. T-38C Tailored VNAV Matrix F. T-38C Tailored RNP Matrix G. T-38C Generic ADS-B Matrix

Industry Certifications in the cross reference matrix have no document/paragraph referenced.

Question: Are the SOO references correct for Architecture Diagram and Industry Certifications.?

Government Response: The Architecture Diagrams line has been deleted; SOO references for Industry Certifications have been added. Please see the cross reference matrix revision 01. (The original cross reference matrix that was posted was posted in error. There are many changes to revision 01to reflect the matrix that was supposed to have been posted originally)

6
Bidder’s Library
-
-
-
The following drawings were not found as part of Bidders Library III. Contractor request the following drawings.

047-09406-0014 Mounting Rack (Transponder Mode-S) (Missing) 047-09855-0004 Mounting Rack (TCAS II) (Missing)

Government Response: The Government is providing them as part of the Bidder’s Library, Rev 4.

7
Attachments 2, 3, 4, MDP, HUD, and ADS-B SOOs, Revision 01-1
5.3.5
Developmental Test (DT) and Force Development Evaluation (FDE)

Since the USG has requested an option for the contractor to do the installation, does this effort include performing weight and balance on each modified aircraft? If additional ballast is required, is the contractor expected to provide?

Government Response: The ECP shall account for aircraft weight and balance regardless of the installation method (Depot, CFT or Field). If ballast is required it shall be provided as part of the TCTO kits.

8
Attachments 2, 3, 4, MDP, HUD, and ADS-B SOOs, Revision 01-1

Attachment 1, AvCI CLS PWS 5.1

10.2 System Test and Integration

Performance Metrics - MTBF

SOOs paragraphs 5.1.2 require that the replacement/refurbished equipment meet or exceed the MTBF rate identified in the F3I spec.

Are these LRU-specific reliability requirements to be enforced in addition to the avionics system-wide requirement of 40 hours MTBF defined in PWS 10.2?

Government Response: The offerors proposed solution must meet the requirements outlined SOOs and in Section M paragraph 2.3.1 item 2. Reliability and maintainability is referenced in section 2 of the SOOs. Equipment/system performance outlined in the SOOs will be reviewed in accordance with Attachment 1, AvCI CLS PWS paragraph 5.2 to ensure the contracted requirements are maintained.

9
Attachment 6B Total Evaluated Price Worksheet Revision 02
-
Total Evaluated Price Worksheet
1
Currently the TEP Worksheet has CLIN X005-Program Management (row 30); CLIN X006-COMBS Labor (row 31); CLIN X007-FSR Labor Cost (row 32); CLIN X009-CLS Material Cost per Flight Hour (row 34); CLIN X010-Government Damage Parts (row 35); CLIN X011-Engineering Services (row 36); and CLIN X012-Software Application Support (row 37) only sum from Year 2 through Year 9.

Is it the Government’s intension to include Year 10?

Government Response: The Government intention is to include year 10. The formula has been corrected to add columns “E” through “M”. This has been revised in Attachment 6B TEP worksheet.

10
Attachment 6B Total Evaluated Price Worksheet Revision 02
-
Total Evaluated Price Worksheet
1
It appears CLIN X024-row 49 calculation is currently cells I49 + M49, and we believe it should be H49 + M49.

We recommend reviewing the cells and adjusting the formula to H49+M49.

Government Response: The correct formula is “H49+M49” and has been revised in Attachment 6B TEP worksheet.

11
Attachment 12, Section L, Revision 02

5.3.1

Subfactor 1: T-38C Component Replacement, Development & Integration – MDP, HUD & ADS-B Out
9
Is it permissible to address overarching issues that may be relevant to Sections 1B, 1C, and 1D (for example DMSMS) when addressing the higher system level Subfactor 4 section of 1A?

Government Response: The offerors proposal must meet the requirements outlined in Section M paragraph 2.3.4 item 1. Offerors may use any examples they deem necessary in order to meet the requirements outlined in Section M paragraph 2.3.4 item 1.

Attachment 12, Section L, Revision 02 4.1

4.7

Proposal Preparation Instructions

Cross-Referencing

Section L, Section 4.7 states “Cross-referencing within a proposal volume is permitted where its use would conserve space without impairing clarity.”, is it permissible to submit Volume I in one binder with tabs for Sections 1B, 1C, and 1D?

This request is made to enable cross referencing at the system level and avoid repetition of items such as DMSMS.

Government Response: The Government concurs with the above approach if desired by the offerors.

13
Attachment 12, Section L, Revision 02
11.4.2
Small Business Subcontract Plan and Small Business Participation Requirements
23
Section L states: “The small disadvantaged business (SDB) goal is 5%. The woman owned small business (WOSB) goal is 5%. The service disabled Veteran Owned small business (SDVOSB) goal is 3%. The HUBZONE goal is 3%. The overall small business subcontracting requirement is a minimum 3% of total contract value.”.

From what item will these percentages be derived?

Government Response: The socioeconomic goals listed above are derived off of the total subcontracted value. The 3% subcontracting requirement is based on total contract value.

File details come from the government source that posted it. Updated .