SOW_ATTACHMENT_D_Operational_and_Flight_Check_Requirements.pdf

PDF 281 KB Posted

Attached to
A-10 Thunderbolt Advanced-Wing Continuation Kit (ATTACK) Federal contract opportunity
Solicitation number
FA8202-18-R-1001
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This statement of work attachment defines operational ground checks and functional check flight procedures for the A-10 Thunderbolt Advanced-Wing Continuation Kitting contract opportunity. Key requirements include conducting continuity checks, leak checks, system checkouts for components like the data transfer system, countermeasures dispense system, electronic warfare systems, external and internal armament systems, lighting, fuel and hydraulic systems, and flight control systems. Acceptable flight parameters and performance specifications are also defined by aircraft manuals.

The related solicitation seeks to award a contract for A-10 Thunderbolt Advanced-Wing Continuation Kitting to add structural components that extend the service life of A-10 aircraft. Interested offerors must be registered and certified to handle export-controlled technical data. The Department of the Air Force Materiel Command Lifecycle Management Center at Hill Air Force Base is the contracting agency.

SOW Attachment D - Operational and Flight Check Requirements

View the file

Other files for this federal contract opportunity

Other files attached to A-10 Thunderbolt Advanced-Wing Continuation Kit (ATTACK), newest first.
File Type Posted
Non_Proprietary_Questions_211_-_212.xlsx XLSX spreadsheet
Section_L.docx DOCX document
Non_Proprietary_Questions_162_-_210.xlsx XLSX spreadsheet
TEP_Pricing_Matrix_8-3-2018.xlsx XLSX spreadsheet
Section_M.docx DOCX document
Form_260.pdf PDF
ATTACHMENT_F_-_Government_Furnished_Information_List_Rev_A.pdf PDF
RFP_Attach_1_Instruct_to_Offerors.pdf PDF
9579776_Digital_Data_Delivery_Requirements.pdf PDF
RFP_Attach_3_-_SubKtr_and_Joint_Venture_Partner_Consent.docx DOCX document
TM-86-01_RevA.pdf PDF
ppi_tool.accdb MDB file
Non_Proprietary_Questions_141-161.pdf PDF
A016_CDRL.pdf PDF
A035_CDRL.pdf PDF
A010_CDRL.pdf PDF
A011_CDRL.pdf PDF
A023_CDRL_-.pdf PDF
A003_CDRL.pdf PDF
A009_CDRL.pdf PDF
A008_CDRL.pdf PDF
RFP_Attach_7_SUPPLEMENT_Data_Entry_Form.pdf PDF
Section_L.docx DOCX document
Section_M.docx DOCX document
A030_CDRL.pdf PDF
SOW_ATTACHMENT_C_Contract_Data_Requirements_List_CDRL_and_Distribution.pdf PDF
A029_CDRL.pdf PDF
ATTACK_SOW.pdf PDF
A014_CDRL.pdf PDF
A019_CDRL.pdf PDF
A026_CDRL.pdf PDF
A034_CDRL.pdf PDF
DD_form_2345.pdf PDF
A036_CDRL.pdf PDF
A002_CDRL.pdf PDF
A028_CDRL.pdf PDF
A020_CDRL.pdf PDF
RFP_Attach_6_-_TEP_Pricing_Matrix.xlsx XLSX spreadsheet
A042_CDRL.pdf PDF
RFP_Attach_7_Government_Furnished_Property_List.xlsx XLSX spreadsheet
A040_CDRL.pdf PDF
Non_Proprietary_Questions_(27Apr_thru_RFP).pdf PDF
A006_CDRL.pdf PDF
RFP_Attach_2_Past_Perf_Info_Sheet.docx DOCX document
A021_CDRL.pdf PDF
A029_TMCR.pdf PDF
A001_CDRL.pdf PDF
A013_CDRL.pdf PDF
A022_CDRL.pdf PDF
A024_CDRL.pdf PDF
Show all 50

A-10 Thunderbolt Advanced-Wing Continuation Kit (ATTACK) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

ATTACHMENT D

OPERATIONAL AND FLIGHT CHECK

REQUIREMENTS

FOR

A-10 THUNDERBOLT ADVANCED-WING

CONTINUATION KITTING

(ATTACK)

22 Jan 2018

Prepared by:

AFLCMC/WWAP

Fighter/Bomber Directorate

Hill AFB, Utah 84056

REVISION CONTROL

Note: The portion of the text affected by the current revision is indicated by vertical black lines in the outer left hand margin.

Revision Date Description Pages Changed

Initial 22 JAN 2018 Initial Release

1. PURPOSE

This attachment to the Statement of Work (SOW) defines the Operational Ground Checks (Ops

Checks) and Functional Check Flight (FCF) procedures used by the government during and after

ATTACK Wing Assembly installation on a functional A-10 aircraft. This list may not be all inclusive and is included for contractor reference only. For additional procedures and checks performed during installation of the ATTACK Wing Assembly, reference TCTO 1A-10C-520.

Ops Checks:

Continuity check (TO 1A-10C-2-110-1).

Reinstall Protective Caps for Connectors 9361J3, 9361J4 and 9461J34 on Pylon Station 1

(TO 1-1A-14)

Reinstall Protective Caps for Connectors 9362J3, 9362J4 and 9462J34 on Pylon Station

11 (TO 1-1A-14)

Operational checkout of DC power system (TO 1A-10C-2-24JG-2).

Operational checkout of emergency power system (TO 1A-10C-2-24JG-3).

Operational checkout of master caution system (TO 1A-10C-2-24JG-6).

Leak Check of Aerial and Ground Refueling Manifold Assemblies (TO 1A-10C-2-28JG-

3).

Anti-Skid System Checkout (TO 1A-10C-2-32JG-4).

Operational Checkout of Data Transfer System (TO 1A-10C-2-34JG-9).

Countermeasures Dispense System Checkout (TO 1A-10C-2-93JG-5-1).

o Operational Checkout of Countermeasures Dispense System using TSS-

4485/ALM-288.

o Operational Checkout, Dispense System Station #1 thru #4.

o Operational Checkout, General.

o Operational Checkout, Initialization.

Electronic Warfare ALQ System Checkout (TO 1A-10C-2-93JG-2-1).

o ALQ-184 and ALQ-131 Test Using Test Set AN/USM-670.

o Cockpit-to-Pod Wiring Checkout with ECM Pod Wiring Tester and ALQ-213

Cockpit Adapter (CMS Aircraft).

o ECM Pod Operational Checkout, Countermeasures Set (CMS) AN/ALQ-213(V)2

System ECM POD, Operational Checkout.

External Armament System Checkout (TO 1A-10C-2-94JG-7).

o CICU LRU IBIT for HOTAS.

o Operational Check of CICU.

o Operational Check of AIM-9 Missile Control System.

o Operational Check of Integrated Data and Weapons Management System

(IDWMS).

o Operational Check TGM-65 B/D/E/G/G2 or CATM-65 K.

Operational Checkout of External Fuel Feed System with Alternate External Fuel Tank

Preinstallation Tester (TO 1A-10C-2-28JG-4).

Operational Checkout of Exterior Lighting and NVIS Lighting System (TO 1A-10C-2-

24JG-5).

o Position Lights Check.

o Formation Lights Check.

o Anti-collision Lights Check.

o Landing and Taxi Light Check.

Fuel Feed/Vent System Checkout (TO 1A-10C-2-28JG-1).

o Operational Check of Fuel System (Without external Fuel Tanks).

Fuel Quantity Indicating and Warning System Checkout (TO 1A-10C-2-28JG-5).

o Operational Checkout of Fuel Quantity Indicating System (Full Tanks).

o Operational Checkout of Fuel Quantity Indicating System (Empty Tanks).

o Aircraft Capacitance and Resistance Check of Fuel Probes and Harness (With

Test Sets P/N 361-022-002 and P/N 361-015-001) or Aircraft Capacitance and

Resistance Check of Fuel Probes and Harness (With Test Sets P/N 361-022-002 and P/N PSD60-1AF).

o Calibration of Fuel Quantity Indicating System.

Fuel System Leak Check During Ground Refueling (TO 1A-10C-2-12JG-1).

Hydraulic System Service and Bleed (TO 1A-10C-2-12JG-1).

Operational Checkout of AN/ARN-108(V) Instrument Landing System (ILS), Using

972Q4 Test Set or Operational Checkout of AN/ARN-108(V) Instrument Landing

System (ILS), Using AN/ARM-201 Radio Test Set or Operational Checkout of

AN/ARN-108(V) Instrument Landing System (ILS), Using IFR-4000 Test Set (TO 1A-

10C-2-34JG-6).

Internal Armament System Checkout (TO 1A-10C-2-94JG-6).

o Operational Checkout of 30MM Gun System..

Operational Checkout/Maintenance BIT Check of LASTE System (TO 1A-10C-2-94JG-

10).

Leading Edge Slat System Checkout (TO 1A-10C-2-27JG-1).

o Alpha Mach and Audio Stall Warning System Checkout.

o Slat Extension and Retraction Check.

o Slat Operating Time Check.

o Slat Seal Check.

MLG Brake System Checkout (TO 1A-10C-2-32JG-4).

o Anti-Skid Operational Checks.

o Bleed of Main Landing Gear Brakes.

o Normal Operation Check.

o Emergency Operation Check.

MLG Shock Strut Servicing (TO 1A-10C-2-12JG-1)

MLG System Checkout.

o Rig MLG Aft Door and Mechanism (TO 1A-10C-2-32JG-1).

o Bleed MLG Drag Strut Actuator (TO 1A-10C-2-32JG-1).

o Rig MLG Strut Fairing Assembly (TO 1A-10C-2-32JG-1).

o Rig MLG Torque Arm Fairing (TO 1A-10C-2-32JG-1).

o Adjust MLG Uplock Cylinder and Upstop Pad Assembly (TO 1A-10C-2-32JG-1).

o Landing Gear System Leak Check (TO 1A-10C-2-32JG-1).

o Landing Gear Auxiliary Extension Check (TO 1A-10C-2-32JG-2).

o Landing Gear Retraction for Control System Check (TO 1A-10C-2-32JG-2).

o Landing Gear Retraction for Flight Safety Circuit Check (TO 1A-10C-2-32JG-2).

o Landing Gear Warning Horn Check (TO 1A-10C-2-32JG-2).

o Adjust MLG Uplock Switch (TO 1A-10C-2-32JG-2).

o Adjust Weight On Wheels Switch (TO 1A-10C-2-32JG-2).

Operational Check of Electrical and Avionics Compartment Cooling Blowers and

Interlock Switches (TO 1A-10C-2-21JG-3).

Bleed Air Leak Detection System Operational Test (TO 1A-10C-2-21JG-2, Chapter 2

Step 2).

Multifunction Color Display System (TO 1A-10C-2-94JG-3).

o Operational Checkout of Multifunction Color Display (MFCD) System.

o Video and Wiring Check of Multifunction Color Display (MFCD) and Electro-

Optical (EO) Munition Check.

Nose Wheel Steering Engagement Test (TO 1A-10C-2-32JG-3).

Pitot-Static System Checkout (TO 1A-10C-2-34JG-2).

o Purge Pitot Pressure Line.

o Pitot-Static Tube Heater Check.

o Pitot-Static Leak Check.

o Purge Static Pressure Line.

Roll Flight Control System Checkout (TO 1A-10C-2-27JG-5).

o Rigging Aileron Actuator.

o Aileron Actuator Piston Rod End Alignment (Chapter 14, Para 14-1-2, Steps 8 through 25).

o Aileron Actuator Stability Check.

o Checking Aileron and Aileron Servo Tab Neutral.

o Aileron Fine Trim Rigging.

o Aileron Hydraulic Leakage Check.

o Aileron Travel Check.

o Aileron Trim Check.

o Control Cable Tension Adjustment.

o Rigging Feel and Trim Device.

o Leading Edge Aileron Neutral Set Check.

o Lubricate Aileron Actuator (TO 1A-10C-6WC-2).

o Manual Reversion Check.

o Rigging Mechanical Subsystem.

o Roll Feel Device Check.

o Rigging Servo Tab Shifter and Servo Tab.

Simultaneous Localizer and Glide Slope Checkout (TO 1A-10C-2-34JG-6).

Checkout and Adjustment of Speed Brake Position LVDT (TO 1A-10C-2-27JG-3).

Speed Brake System Checkout (TO 1A-10C-2-27JG-2).

o Deceleron Camber Rigging.

o Emergency Retraction Check.

o In-Flight Limitation Check.

o Speed Brake Pinch Check.

o Rigging Speed Brakes.

o Speed Brake Travel Check.

o Synchronization Check.

Control Stick Shaker Check (TO 1A-10C-2-34JG-2).

Trailing Edge Flap System Checkout (TO 1A-10C-2-27JG-1).

o Automatic Electrical Blowback Operational Check.

o Emergency Retract Check.

o Flap Indicating System Operational Check/Calibration.

o Ground Safety Check.

o Normal Flap Extension and Retraction Check.

o Rigging Trailing Edge Flap System.

Weapons Station Check (TO 1A-10C-2-40MS-1 PATS-35 or 1A-10C-2-15JG-3 PATS-

70).

o TGP Station Checkout.

o 1760 Weapons Station Check.

Functional Check Flight Procedures:

Check that the following systems work properly, IAW TO 1A-10C-6CF-1:

Fuel system/gauges

Landing gear

Flaps

Primary flight controls o Pitch and roll trim o Speed brake o Speed brake warning system

Slats

Primary flight controls in manual reversion

Ensure the following are within limits IAW TO 1A-10C-1:

Stores/carriage limits

Load factors

Stall speeds, stall performance

Manual reversion stick forces

Aileron disconnect

Ensure the following are within limits IAW TO 1A-10C-1-1:

Takeoff speed, takeoff ground run

Climb (max thrust, single engine)

Cruise and service ceiling

Specific range

Max endurance

Level flight max speed

Turn performance, turn rate/radius

Final approach speed

Landing roll distance

File details come from the government source that posted it. Updated .